Question:

Following with construction of a system, a system conversion is the process by which the new system replaces the old system. If a total new system is implemented, it is called an installation. The conversion style can vary from direct or parallel conversion. Direct conversion is a total cutover to a new system while in parallel, the new system is operated side by side with the old system. Conversions can be pilot conversions with selected modular units or locations, or phased conversions where systems are installed sequentially, or simultaneous conversions where all locations are converted simultaneously.

After an installation or conversion, the system is maintained to ensure it continues to meet business needs through some refinement. System maintenance is controlled by maintenance requests, which are approved and scheduled for development. Maintenance can be classified as preventive, corrective, adaptive, and perfective maintenance.

Maintenance personnel must also have a mechanism for documenting system errors and how they were resolved. These are sometimes called system error logs, and they are particularly important for large systems. It is useful for many reasons. It provides a record of what was done in case questions arise about the error or its resolution in the future. It also allows for tracking the type of errors and when these occur. It can also provide key data for many Key Performance Indicators such as number of system down errors, etc. It also assures that all reported errors and maintenance requests are logged and become part of the process of assessment and prioritization.

Typically companies have urgency levels or priorities on their error log. Errors that are severe in nature are frequently described as system down errors (the system will not operate correctly without resolution). These errors are assigned top priority and are resolved immediately. Exactly what 'immediately' means is based upon the application. If the application is a 24 x 7 application, it is likely that a programmer will be called and will begin work to resolve the error regardless of the time of day. If the application is less critical, it may mean that the error will be resolved during business hours.

With system down errors, unit testing is performed on the code, but system testing is not always done immediately. Sometimes components of an overall system test are performed on the modified code, but frequently unit testing is all that is done immediately. This means that after the revised code is installed, a process must be in place to ensure that it is fully system tested within a reasonable timeframe. If not, errors could be unintentionally introduced into the system again.

Required Reading

Krar, S. (n.d.). The importance of maintenance. Retrieved from http://www.automationmag.com/images/stories/LWTech-files/94%20Intelligent%20Systems.pdf

Takhur, D. (2012). What is system maintenance: What are the different types? Retrieved from http://ecomputernotes.com/mis/implementation-and-evaluation/what-is-system-maintenance-what-are-its-different-types

Explain why systems implementation sometimes fails. Secondly, describe several factors that influence the cost of maintaining an information system. Write this assignment in 2-3 pages.

You will be particularly assessed on:

Your ability to see what the module is all about and to deliver the assignment including 2-3 references.

Your ability to use software techniques and terminology of systems analysis and design correctly and in context.

Your paper submission must be in MS Word format.

References properly cited a must.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M91906222
  • Price:- $35

Priced at Now at $35, Verified Solution

Have any Question?


Related Questions in Project Management

Wahat are the similarities and differences between the

Wahat are the similarities and differences between the PMBOK and PRINCE2 approaches to project Stackholder management.

Discuss the different approaches to developing either a

Discuss the different approaches to developing either a Product Breakdown Structure (PBS) OR a Work Breakdown Structure (WBS).

What are the types of documents required to define

What are the types of documents required to define parameters in a project?

Define a strategic information system give two examples of

Define a strategic information system. Give two examples of these systems

Assessment descriptionyou are required to read a case study

Assessment Description You are required to read a case study based on a fictional company and prepare a Performance Evaluation Video Presentation based on the information contained in the case study. Case Study - DeGrand ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

1 what are some benefits and values of scheduling software

1) What are some benefits and values of scheduling software in a project schedule?

You are recently assigned to manage an effort to upgrade

You are recently assigned to manage an effort to upgrade about 200 desktops in your company to Windows 10. The project has 4 team members reporting directly to you and is estimated to last about 3 months. Per your compan ...

How might researchers study the effectiveness of inclusive

How might researchers study the effectiveness of inclusive leadership with regard to overall organizational effectiveness and competitiveness?

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As