Project stages

A project may consist of one or more stages depending on the size of the project, its nature and client needs. Each stage has several tasks. 

Possible stages of a project are the following:

Stage 1: Preliminary Planning Stage 

The preliminary planning of the project will include (but not limited to) the following items

Preparing Project Information Sheet. This sheet will have all the necessary information about the project to start such as (client requirements, survey file).

Preparing project stages

Preparing tasks and subtasks in the project 

Identifying order of execution of each task within same discipline and within all disciplines

Assign engineers in charge of each task

Assigning man-hour for each task

Sending to the client the “Client Requirement” form for completion

Sending to client preliminary request of information (RFI)

Prepare preliminary list of drawings (Prepare what is called tentative list of drawings. On weekly basis you update the list of drawing. As approaching the end of project, the list becomes almost final. It is important when you prepare your tentative list to do your best to be as accurate as possible. Your list should be expandable, i.e. you add new drawings without changing drawing number and titles of drawings that were before in the list.)

Prepare forms to be used in project

Prepare preliminary time schedule

Prepare method of evaluation of project progress

Prepare transmittal form.

Stage 2: Preliminary concept design Stage 

In this stage we prepare idea of design of project after studying site survey and constrains of surrounding environments, develop idea to come to optimum solution of plans and elevations, prepare perspective shots, Then put this designs into presentation form .

In this stage preliminary design drawings send to client for approval of design

Stage 3: Design schematic Stage 

This stage start after we get approval of preliminary design stage, we develop files to put into more progressive form by refining design, providing more details in plans &elevations, provide more sections to be send to civil discipline, Then coordinated with civil work to send to client.

In this stage, the design is further developed until it reaches completion by having client approval without any comments to reach final design.

Stage 4: working drawing Stage 

In this stage, work will be further developed and coordinated with civil department 

Then send to other disciplines (electromechanical) for final coordination while we are completing other working drawing files of project to submit to client the whole working drawing package of architecture drawings.

Stage 5: Shop drawing Stage

In this stage, all client comments are satisfied and considered in working drawing stage, and we are ready to start shop drawing stage.

In this stage we go more detailed with files, to be provide in larger scale, provide extra files needed for shop drawing such as (floor pattern files, false ceiling files, stair details, toilet details, and so on.) in this stage coordination with all disciplines is to be achieved before send to client.

In this stage we provide all drawings necessary for construction of building. 

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M9504923

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As