A. Please answer the following True or False questions:

1) A process is capable if the variations fall within the control limits.

True

False

2) Random variation falls outside the control limits.

True

False

3) Control charts are used to determine if there are unexpected changes in the process.

True

False

4) 4 items in parallel, each having a reliability of 0.85 have an overall system reliability of 0.999.

True

False

5) A non-conforming product may work fine and be non-defective

True

False

6) A process in control may still produce bad output.

True

False

7) Affinity diagram is used to identify the root causes of a problem.

True

False

8) A Six Sigma process must have a process capability index of 2.0 or higher.

True

False

9) In a true 6 Sigma Process the defect rate should be less than 0.02 per million

True

False

10) A Control Chart is a Trend Chart (or Run Chart) that has control limits

True

False

B. Please answer the following multiple choice questions:

1. Which of the following tools are used to collect data for  histograms.

A) Trend chart

B) Pareto charts

C) Tree diagram

D)  Check sheets

E) Control charts

2. Which of the following tools are used to examine the relationships between variables.

A) Scatter plot

B) Fishbone diagram

C) Tree diagram

D) Check sheet

E) Control chart

3. Which of the following is true of random variation?

A) It is uncontrollable.

B) It is centered around the mean.

C) It occurs with a somewhat consistent amount of dispersion.

D) All of the above.

E) None of the above

4. A fishbone diagram is used during which phase of a Six Sigma project.

A. Define

B. Measure

C. Analyze

D. Improve

E. Control

5. An R chart is used to monitor the __________ of the process.

A. Process capability

B. Dispersion

C. Mean

D. Trends                            

C. Please respond to the following questions:

1) A product is made up of two subsystems in series.  The first subsystem consists of 20 components in series.  The second subsystem consists of 3 components in parallel.  The components in subsystem 1 are all of the same design and each has a 1/10,000 chance of failure.  The parallel components each has a 3/10,000 chance for failure. What is the overall reliability of the system?

2) A quality control engineer monitors the quality of a cylinder production line. He regularly selects a sample of 5 units and measures the diameters.  The specification requires the diameter to be 6 inches plus/minus 0.1 inch.  The following is a record of his measurements. Is the production process in control?  Please use X bar and R charts to make an assessment.

Sample

Item 1

Item 2

Item 3

Item 4

Item 5

1

6.10

6.15

5.35

5.98

5.95

2

6.35

6.02

6.20

6.10

5.70

3

5.85

5.90

6.20

6.12

6.08

4

6.00

5.80

5.70

6.04

6.17

5

6.15

5.60

6.25

5.99

6.01

3) For the data in Problem 2, if the true mean and standard deviation of the process are 6.05 and 0.04. 

a. Is this process capable of meeting its specification?  Calculate its Cp and CPk.

b. What % of cylinders are out of specs?

Q4) A customer relationship manager decided to track customer complaints as part of his ongoing customer satisfaction improvement program. After collecting data for two months, their check sheet appears as follows:

Type of Problem

Frequency (number of times)

Call went to voice mail

8

Items damaged when received

21

Literature not in the box

9

Parts missing

13

Unit not working

2

Delivery was late

3

Construct a Pareto chart including the cumulative % frequency.What is the cumulative percentage of the two leftmost bars?

5) A product manager has conducted a customer satisfaction survey of 30 customers on a scale of 1 to 5.  The survey data is shown below.  Calculate the mean and standard deviation of the survey and plot a histogram of the data.  Does the distribution approximate Normal?

Customer

Satisfaction rating

1

4

2

3

3

2

4

5

5

5

6

2

7

1

8

4

9

3

10

4

11

4

12

5

13

3

14

3

15

2

16

1

17

5

18

3

19

4

20

3

21

4

22

2

23

4

24

4

25

3

26

3

27

3

28

2

29

2

30

3

6) A project manager at System Design Corporation has collected the following data on the size of software programs and the length of programming time. The company is bidding on a new system that is estimated to consist of 250000 lines of code.  Use the data to find the correlation function of coding time to the program size and estimate the number of days it would take to code the system.

Module

Size in 1000 lines of code (KLOC)

Number of days to code

1

160

68

2

158

66

3

148

70

4

135

59

5

178

72

6

170

68

7

158

64

8

138

65

9

200

70

10

195

68

11

189

65

12

173

68

13

159

70

14

163

71

15

150

66

16

140

65

17

206

73

18

144

64

19

157

70

20

183

74

21

195

75

22

190

77

23

182

69

24

152

65

25

174

69

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92278307
  • Price:- $50

Guranteed 36 Hours Delivery, In Price:- $50

Have any Question?


Related Questions in Project Management

Project proposal -project - plan for implementing spc for

PROJECT PROPOSAL - Project - Plan for implementing SPC for improvement Introduction/aims/objectives - 200 words max Indicative literature review - 500 words max Indicative research methodology - 500 words max An idea to ...

As a project manager answer these questions1 a how does the

As a project manager answer these questions, 1) a. How does the weighted scoring approach avoid the drawbacks of the NPV approach? b. Can the two approaches be combined? if so How? How are you going to apply this piece o ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

What are the advantages and disadvantages of cost of poor

What are the advantages and disadvantages of Cost of Poor Quality (COPQ)?

The hospitality industry comprises diverse and varied

The hospitality industry comprises diverse and varied functions and scale of operations. Some organisations may be single function business enterprise such as catering organisation. Others may be larger with multiple bus ...

Assignment 1 the core values and principlesplease have the

Assignment 1: The Core Values and Principles Please have the following titles and include content as per assignment instructions under each paragraph: History of Agile project management. Philosophy and purpose of Agile ...

Wahat are the similarities and differences between the

Wahat are the similarities and differences between the PMBOK and PRINCE2 approaches to project Stackholder management.

This is the brief for the third and final exercise for this

This is the brief for the third and final exercise for this project. Your group has been appointed as Project Manager by The Proprietary Very Limited Corporation (PVLC) to carry out development and feasibility analyses o ...

Your essay should be a properly constructed academic essay

Your essay should be a properly constructed academic essay of 5,000 words. It should contain an effective introduction, body and conclusion. The introduction should introduce the essay and include your argument. The body ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As