1) A process is capable if the variations fall within the control limits.

True

False

2) Random variation falls outside the control limits.

True

False

3) Control charts are used to determine if there are unexpected changes in the process.

True

False

4) 4 items in parallel, each having a reliability of 0.85 have an overall system reliability of 0.999.

True

False

5) A non-conforming product may work fine and be non-defective

True

False

6) A process in control may still produce bad output.

True

False

7) Affinity diagram is used to identify the root causes of a problem.

True

False

8) A Six Sigma process must have a process capability index of 2.0 or higher.

True

False

9) In a true 6 Sigma Process the defect rate should be less than 0.02 per million

True

False

10) A Control Chart is a Trend Chart (or Run Chart) that has control limits

True

False

B. Please answer the following multiple choice questions:

1. Which of the following tools are used to collect data for  histograms.

A) Trend chart

B) Pareto charts

C) Tree diagram

D)  Check sheets

E) Control charts

2. Which of the following tools are used to examine the relationships between variables.

A) Scatter plot

B) Fishbone diagram

C) Tree diagram

D) Check sheet

E) Control chart

3. Which of the following is true of random variation?

A) It is uncontrollable.

B) It is centered around the mean.

C) It occurs with a somewhat consistent amount of dispersion.

D) All of the above.

E) None of the above

4. A fishbone diagram is used during which phase of a Six Sigma project.

A. Define

B. Measure

C. Analyze

D. Improve

E. Control

5. An R chart is used to monitor the __________ of the process.

A. Process capability

B. Dispersion

C. Mean

D. Trends                            

C. Please respond to the following questions:

1) A product is made up of two subsystems in series.  The first subsystem consists of 20 components in series.  The second subsystem consists of 3 components in parallel.  The components in subsystem 1 are all of the same design and each has a 1/10,000 chance of failure.  The parallel components each has a 3/10,000 chance for failure. What is the overall reliability of the system?

2) A quality control engineer monitors the quality of a cylinder production line. He regularly selects a sample of 5 units and measures the diameters.  The specification requires the diameter to be 6 inches plus/minus 0.1 inch.  The following is a record of his measurements. Is the production process in control?  Please use X bar and R charts to make an assessment.

Sample

Item 1

Item 2

Item 3

Item 4

Item 5

1

6.10

6.15

5.35

5.98

5.95

2

6.35

6.02

6.20

6.10

5.70

3

5.85

5.90

6.20

6.12

6.08

4

6.00

5.80

5.70

6.04

6.17

5

6.15

5.60

6.25

5.99

6.01

3) For the data in Problem 2, if the true mean and standard deviation of the process are 6.05 and 0.04. 

a. Is this process capable of meeting its specification?  Calculate its Cp and CPk.

b. What % of cylinders are out of specs?

Q4) A customer relationship manager decided to track customer complaints as part of his ongoing customer satisfaction improvement program. After collecting data for two months, their check sheet appears as follows:

Type of Problem

Frequency (number of times)

Call went to voice mail

8

Items damaged when received

21

Literature not in the box

9

Parts missing

13

Unit not working

2

Delivery was late

3

Construct a Pareto chart including the cumulative % frequency.What is the cumulative percentage of the two leftmost bars?

5) A product manager has conducted a customer satisfaction survey of 30 customers on a scale of 1 to 5.  The survey data is shown below.  Calculate the mean and standard deviation of the survey and plot a histogram of the data.  Does the distribution approximate Normal?

Customer

Satisfaction rating

1

4

2

3

3

2

4

5

5

5

6

2

7

1

8

4

9

3

10

4

11

4

12

5

13

3

14

3

15

2

16

1

17

5

18

3

19

4

20

3

21

4

22

2

23

4

24

4

25

3

26

3

27

3

28

2

29

2

30

3

6) A project manager at System Design Corporation has collected the following data on the size of software programs and the length of programming time. The company is bidding on a new system that is estimated to consist of 250000 lines of code.  Use the data to find the correlation function of coding time to the program size and estimate the number of days it would take to code the system.

Module

Size in 1000 lines of code (KLOC)

Number of days to code

1

160

68

2

158

66

3

148

70

4

135

59

5

178

72

6

170

68

7

158

64

8

138

65

9

200

70

10

195

68

11

189

65

12

173

68

13

159

70

14

163

71

15

150

66

16

140

65

17

206

73

18

144

64

19

157

70

20

183

74

21

195

75

22

190

77

23

182

69

24

152

65

25

174

69

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92278307
  • Price:- $50

Guranteed 36 Hours Delivery, In Price:- $50

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As