Problem: Boston, July 11, 2006-four concrete panels weighing about 3 tons each fell from the ceiling of a Big Dig tunnel, crushing a woman in a car to death. The accident occurred in a 200-foot sec- tion that connects the Massachusetts Turnpike to the Ted Williams Tunnel. Said the Modern Continental Company, the contractor for that sec- tion of the project, "We are confident that our work fully complied with the plans and specifications provided by the Central Artery Tunnel Project. In addition, the work was inspected and approved by the project manager."22

The panels, installed in 1999, are held with metal trays secured to the tunnel ceiling with epoxy and bolts. The epoxy-bolt system is a tried-and-true method: holes are drilled into the concrete ceiling, cleaned, and filled with high-strength epoxy; a bolt is screwed into the hole; as the epoxy cures it bonds to the bolt. "That technique is used extensively," said an engineering professor at the Massachusetts Institute of Technology.23 For work like the Big Dig's ceiling, he said, safety "redundancies" are added; that is, enough epoxy-and-bolt anchors that would hold the ceiling panels even if some failed. But in the connector tunnel, he contended, too few anchors were used. "They didn't have enough to carry the load. There was no room for error." He added, however, the evidence was preliminary, and such a conclusion would be premature.

Some of the bolts in the ceiling wreckage had very little epoxy, and three of them had none. State Attorney General Thomas Reilly's investigation is focusing on whether the epoxy used failed, or construction workers who installed the bolts mis- used or omitted the epoxy. An accident caused by improper installation or errors in mixing the

epoxy, he said, would implicate the tunnel's design and designers. (Epoxy requires on-site mix- ing before use.) He added that some documents reflected a "substantial dispute" among engineers over the anchor system's adequacy to support the weight of the ceiling panels.

Seven years before the accident, Safety Officer John Keaveney wrote a memo to one of his superi- ors at contractor Modern Continental Construction Co. saying he could not "comprehend how this structure can withhold the test of time."24 He said his superiors at Modern Continental and repre- sentatives from Big Dig project manager Bechtel/ Parsons Brinckerhoff (B/PB) assured him the sys- tem had been tested and proven. Keaveney told the Boston Globe he began to worry about the ceil- ing panels after a third-grade class toured the Big Dig in 1999. While showing the class some con- crete ceiling panels and pointing to bolts in the ceiling, a girl asked, "Will those things hold up the concrete?" "I said, ‘Yes, it will hold,' but then I thought about it."

Some have argued that the investigation should look at the tunnel's design: Why were the concrete panels so heavy, weighing 21/2 to 3 tons apiece? Why were they there at all? And why did the failure of a single steel hanger send 6 to 10 of the panels crashing down? Eyewitness report indicate the accident began with a loud snap as a steel hanger gave way, which set off a chain reaction that caused other hangers holding up a 40-foot steel bar to fail and send 12 tons of concrete smashing below. Were the bars under-designed to handle the weight?

Investigators are also looking at whether the use of the wrong epoxy may have played a role.25 Invoices from 1999 show that at least one case of a quick-drying epoxy was used to secure ceiling bolts rather than the standard epoxy specified by

the designers. The epoxy holds 25 percent less weight than standard epoxy.

Additional issues raised during the investiga- tion include the following:26

Design changes that resulted in the use of con- crete ceiling panels in the connector tunnel which are heavier than panels used in the Ted Williams Tunnel

The lack of steel supports in sections of the con- nector tunnel ceiling to which bolts holding the concrete panels could have been connected

Possible tunnel damage caused by blast vibra- tions from nearby construction of an office tower

Use of diamond-tipped drill bits, instead of car- bide bits, in drilling holes for the bolts (epoxy may not hold as well in smoother holes drilled with diamond bits)

Impact of cold weather during installation of the epoxy-bolt system. B/PB, the project management contractor, said in a statement: "Determining the causes of this specific failure will require a thorough forensic analysis of design, methods, materi- als, procedures, and documentation." As inves- tigators scrutinize the history of the $14 billion project, criticism is reviving that Massachusetts lacked adequate supervision of private con- tractors. B/PB was involved in both the design and construction efforts-an arrangement some say may have compromised oversight. "There was no one checking the checkers," said one US Representative. Wrote one blogger: "I wouldn't want to be the registered engineer whose sig- nature is on the design. It will be his fault if the materials and workmanship are found not to be up to specifications. But who knows if it is his fault. This is a huge mess and the whole bunch of them, engineers, managers, inspectors, and tes- ters, should be investigated."27

Question: 1. With 20-20 hindsight, draw a CE (fishbone, Ishikawa) diagram to illustrate possible causes and effects. Include the possible causes men- tioned in the case. The diagram should have been developed before construction; therefore, also indicate other possible failure modes and other causes you can think of. How would the diagram (developed after the accident) be of value during litigation?

2. List the characteristics that should have been classified as critical.

3. Propose guidelines for a process to ensure that the epoxy would provide sufficient bonding to the concrete ceiling.

4. Explain the role that configuration manage- ment should have played in preventing the accident.

5. What role could modeling/prototyping, lab-oratory tests, checklists, and training have played?

6. Explain how someone within B/PB would be accountable regardless of the findings of a forensic investigation. Would B/PB be off the hook if a subcontractor were found guilty?

7. What would the implications have been if the engineer who signed off on a specific design was an engineer-in-training instead of a regis- tered engineer?

8. Comment on the relationship between project quality management and project risk manage- ment. How could risk management have pre- vented the accident? How does project quality management relate to project cost manage- ment?

9. Comment on the contribution that inspection and audits could have played.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92670314

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As