Part A.

True/False

1) Brainstorming is a fundamental tool of problem solving

2) A process is capable if the variations fall within +- 3 standard deviation

3) Random variationsfall outside the control limits.

4) Control charts are used to determine if there are special cause variation in the process.

5) 3 items in parallel, each having a reliability of 0.90 have an overall system reliability of 0.999.

6) nP chart is used when the number of defects per unit is fixed at n

7) A process in control may produce unacceptable output.

8) A Six Sigma process must have a process capability index of 6.

9) For a Normally distributed process the control limits are + - 3 times the standard deviation

10) A Control Chart is a Trend Chart (or Run Chart) that has control limits

Part B.

1. Which of the following tools are used to get the shape of the distribution.
A) Matrix diagram
B) Histogram
C)Affinity Diagram
D) Check sheets
E) Process map

2. Which of the following tools are used to find the relationship between two variables?

A) Process Map
B) Fishbone diagram
C) Pareto Chart
D) Scatter plot
E) Control chart

3. Which of the following is true of special cause variation?

A) It is uncontrollable.
B) It is centered around the mean.
C) It is inherent in the process.
D) All of the above.
E) None of the above

4. A true 3 Sigma Process should not have more than _______defects per million opportunities
A. 6,210
B. 3.4
C. 2700
D. 45500

5. An R chart is used to monitor __________.

A. Variation of the Mean
B. Process Dispersion
C. Trend in mean value
D. Trend in standard deviation

Part C

1) 97. 1) A product is made up of two subsystems in series. The first subsystem consists of 20 components in series. The second subsystem consists of 3 components in parallel. The components in subsystem 1 are all of the same design and each has a 1/10,000 chance of failure. The parallel components each has a 3/10,000 chance for failure. What is the overall reliability of the system?

2) A quality control engineer monitors the quality of a cylinder production line. He regularly selects a sample of 5 units and measures the diameters. The specification requires the diameter to be 6 inches plus/minus 0.1 inch. The following is a record of the measurements.Is the production process in control? Please use X bar and R charts to make an assessment.

Sample

item 1

item 2

item 3

item 4

item 5

1

6.10

6.15

5.35

5.98

5.95

2

6.35

6.02

6.20

6.10

5.70

3

5.85

5.90

6.20

6.12

6.08

4

6.00

5.80

5.70

6.04

6.17

5

6.15

5.60

6.25

5.99

6.01

6

6.13

6.05

5.89

6.00

5.87

7

5.88

6.03

5.76

6.1 3

6.00

8

6.12

5.45

6.15

6.04

5.91

3) A customer relationship manager decided to track customer complaints as part of his ongoing customer satisfaction improvement program. After collecting data for two months, their check sheet appears as follows:

Type of Problem

Frequency

(number of times)

Call went to voice mail

8

Items damaged when received

21

Literature not in the box

9

Parts missing

13

Unit not working

2

Delivery was late

3

Construct a Pareto chart including the cumulative % frequency.What is the cumulative percentage of the two leftmost bars?

4) A project manager at Global Design Corporation has collected the following data on the size of software programs and the length of programming time. The company is bidding on a new system that is estimated to consist of 250,000 lines of code. Use the data to find the correlation function of coding time to the program size and estimate the number of days it would take to code the system.

Module

Size in 1000 lines of code (KLOC)

Number of days to code

1

160

68

2

158

66

3

148

70

4

135

59

5

178

72

6

170

68

7

158

64

8

138

65

9

200

70

10

195

68

11

189

65

12

173

68

13

159

70

14

163

71

15

150

66

16

140

65

17

206

73

18

144

64

19

157

70

20

183

74

21

195

75

22

190

77

23

182

69

24

152

65

25

174

69

5) Describe the Sources of Team Conflict

6) Describe the 5 principles of Lean

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92783992
  • Price:- $30

Guranteed 24 Hours Delivery, In Price:- $30

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As