Ask Project Management Expert

Objective:

Demonstrate the ability to apply knowledge of one aspect of project management (risk management) in a case study.

Tasks to be undertaken:

You have been approached to:

1. Research and select an appropriate technology to produce sanitary hot water for a small hotel (three floors, 20 guest rooms, one small kitchen) in Nairobi in Kenya using solar energy.

2. Conduct a risk management plan for the installation and operation of the selected system.

The contractor has asked you to provide a technical report including the following:

- Technical description of the solar energy system. Please include information about:
o Justification of the selection of the particular system
o Stages or components (including ancillary equipment, if appropriate)
o Potential dimensions of the system (e.g. capacity, volume of heated water, etc.)
o Basic explanation on how the systems work (e.g. solar input, temperature of the sanitary hot water, etc.)

Maximum length of the section: 1 page
- Describe any industry standards or legislation relevant in Kenya related to the installation and operation of this type of solar energy system (or regarding their inputs and/or outputs, if appropriate)

Maximum length of the section: half page
- Conduct a risk assessment for the installation and operation phases of the selected solar hot water technology. Include:
o Hazard identification (as comprehensive as possible, i.e. physical, mechanical, electrical, work practices, environmental, hazardous substances, handling, fire hazards, etc.)
o Risk rating (likelihood and severity) - justify your rating

Maximum length of the section: 2 pages
- Suggest risk mitigation measures for all hazards you identified in both phases
- Re-calculate the risk rating to demonstrate the minimisation of risks.

Maximum length: 2 pages
- Conclusions: summarise the main findings of your risk assessment and provide some design recommendations that could minimise the identified risks. For example, changes in the design of the selected technology, type of materials of its components, etc.

Maximum length: half page

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M93054052
  • Price:- $180

Guranteed 48 Hours Delivery, In Price:- $180

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As