Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Project Management Expert

Network Project Management Assignment

Purpose of the assessment (with ULO Mapping) - In-depth analysis of common issues that program/project managers often face in organisations that lack a culture that supports implementation of project management methodologies.

Purpose of the assessment: Project management  problems can  occur when  project management methodologies are  not implemented successfully across organisations.  In this assessment task, you are required to write a report on the current project management issues in the following case-study, in 800 to 1000 words exclusive of references.

RAPID PROTOTYPING - NEW DISCIPLINE

Rapid prototyping has been a constant growing and evolving field since the late 1980s. As technology improved,  so  did  the  opportunities  in  new markets.  The  idea  quickly  evolved  from  its  grassroots beginning to many small companies competing for a bigger share of the growing market. Frank  Billings  was  just  another  name  in  what  was  at  that  time  a  niche  market.  As  a  student  in engineering school, he  followed the development of the new prototyping techniques and realized their  potential  in  the  marketplace.  His  dream  job  was  to  work  for  a  rapid  prototype  equipment manufacturer. There were only a few start - up companies in rapid prototype machine development, however, and none could pay the average engineer wage. 

Like most engineering school graduates overloaded with school loans, he couldn't wait for his dream job to come along, so he went for a job at Cocable Company. Cocable designed and manufactured specialty cable and cable - related products. It had nothing to do with rapid prototyping, but it paid well. He worked  hard at  Cocable and earned enough  to  pay  down  his debts. He  proved  to  be an excellent engineer, earning a great reputation at Cocable and making many contacts along the way. In those three years at Cocable, however, he never stopped thinking about rapid prototype machines. He spent his free time coming up with a rapid prototype machine design, always dreaming of having his own company. Three years in, he was ready. He quit Cocable and started his own rapid prototype (RP) design business. He perfected his own RP machine design and was ready to prove himself in the growing field.

BUSINESS BOOMS

Like every start - up business in a new field, finding customers is tough. In the RP field, there are two types of work. The first includes owning an RP machine and doing prototypes per order. The second is selling RP machines to businesses that want the machine to do in - house RP. The latter option is far more profitable since the machines are more expensive than each prototype they produce. Frank would  have  been  happy  with  either  type  of  business,  since  at  the  time,  he  wasn't  doing  much business at all.

All those years making contacts at Cocable Company proved to be worth the time and effort. He had stayed in touch with these contacts and through them was happy to learn that Cocable had just been hired by GE  to design and manufacture cable installations on  their newest jet engine. Part of  the wiring installation that Cocable had been hired to design included junction boxes and switch covers. The installation would  be  no  simple  task as  these  "  boxes  " are made  of  specialty materials with complex shapes and multiple designs, all needed  for application. They had to be perfect  from the start since airplane engines have no room for error. This was a huge job and the timeline was tight. Rapid prototypes were an absolute necessity for this job. Frank's knowledge of Cocable's needs made him perfect for the RP job.

Cocable wanted full access to rapid prototyping so they decided to contract Frank to custom build four RP machines  to  their  specifications. Frank could not be happier. The RP machine  specs were given to Frank and he went to work.

WHO IS GOING TO PAY FOR THE CHANGES?

After three months of all - night work sessions, the machines were built to specification and ready for delivery to Cocable. Frank ' s daring steps into a new field were fully rewarded, he thought.  Everyone was ready for a test run, after the first machine was delivered to Cocable. The CAD model was loaded and it was time to hit the "Start" button.  

Beep, beep, beep. 

"That's not good," said Frank.

He felt embarrassed that the machine failed in front of everyone. He was sure the machine ran fine before it was delivered. He couldn't allow his first major deal to fail in any way. The machine was checked over for shipping damages. The connections were double - checked. Everything appeared intact. Frank sat  down  to  review  the  CAD model and  discovered  the problem. The model was 62 inches long. This was an issue, considering the RP machines were designed for a maximum of 55 inches.

The original Cocable specs for Frank's RP machines were for a maximum length of 48 inches. Frank optimized  his machines  for a length  of  48 inches,  but  to  be  on the  safe  side,  the machines were capable of 55 - inch designs. Sixty - two inches went outside that range. A machine that could make prototypes  that  long  would  require  completely  different  processors,  actuators,  and  adhesion processes. This would be a major redesign of the RP machines. This would take time and a lot of money.

Cocable claims that the original specs for a maximum of 48 inches came from GE. GE claims that it never gave Cocable a maximum length. The first design that GE requested from Cocable was 62 inches long and that had been weeks before. Cocable should have double - checked their RP specs. Nobody wants to take the blame for specifying the prototype design sizes and Frank's first major product is now going nowhere. Everyone is dissatisfied and two things are for sure:  (1) The entire project is running late, and (2) it will be way over budget.

You are a Project Management consultant, and have been commissioned to write a report on this case. Write the report to address the following questions.

Questions to be addresses in the report:

1. What lessons can be learnt from this case? 

2. Who do you think should pay for the changes? 

3. What could have been done to make sure that the project scope was correct? 

Ref: CASE STUDIES IN PROJECT, PROGRAM, AND ORGANIZATIONAL PROJECT MANAGEMENT Dragan Z. Milosevic, Peerasit Patanakul & Sabin Srivannaboon Copyright 0 2010 by John Wiley & Sons, Inc. All rights reserved.

Prepared by: Assoc. Prof. Nalin Sharda Moderated by: Dr. Imran Jokhio July, 2017.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92424944
  • Price:- $30

Guranteed 24 Hours Delivery, In Price:- $30

Have any Question?


Related Questions in Project Management

Part -1 define project and develop planperformance

Part -1 Define project and develop plan Performance objective Candidates will demonstrate knowledge and skills required to define projects and develop project plans. Assessment description Using the workplace scenario in ...

Define a strategic information system give two examples of

Define a strategic information system. Give two examples of these systems

Annotated bibliographythis table lists criteria and

Annotated Bibliography This table lists criteria and criteria group name in the first column. The first row lists level names and includes scores if the rubric uses a numeric scoring method. Criteria Exemplary Competent ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Read the microsoft word document and do the following1 a

Read the Microsoft word document and do the following. 1. A list of resources that will be used to complete the project plan, 2. The initial bibliography Attachment:- PROJECT PROPOSAL.rar

In software development and design how are requirement

In software development and design how are requirement documents used and maintained, especially as requirements evolve? Also, what processes, methods, and techniques are available for maintenance, and how effective are ...

Assessment descriptionyou are required to read a case

Assessment Description You are required to read a case study based on a fictional company and prepare a Performance Evaluation Video Presentation based on the information contained in the case study. The case study will ...

Case study and research project clairicationfinding a case

Case Study and Research Project Clairication Finding a case for the research project does not mean that you are limited to the company identified in the case. Rather it is to identify an issue identified in the case that ...

Mikes tees a relatively large company that prints t-shirts

Mike's Tees, a relatively large company that prints T-shirts, is developing a system that allows customers to upload their image files on a server and have them printed on T-shirts. The project was drafted and planned to ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As