Frito-Lay, the multi-billion-dollar subsidiary of food and beverage giant PepsiCo, maintains 36 plants in the U.S. and Canada. These facilities produce dozen of snacks, including the wellknown Lay's, Fritos, Cheetos, Doritos, Ruffles, and Tostitos brands, each of which sells over $1 billion per year. Frito-Lay plants produce in the high-volume, low-variety process model common to commercial baked goods, steel, glass, and beer industries.

In this environment, preventive maintenance of equipment takes a major role by avoiding costly downtime. Tom Rao, vice president for Florida operations, estimates that each 1% of downtime has a negative annual profit impact of $200,000. He is proud of the 11 2, unscheduled downtime his plant is able to reach-well below the 2% that is considered the "world-class" benchmark. This excellent performance is possible because the maintenance department takes an active role in setting the parameters for preventive maintenance. This is done with weekly input to the production schedule. Maintenance policy impacts energy use as well. The Florida plant's technical manager, Jim Wentzel, states, "By reducing production interruptions, we create an opportunity to bring energy and utility use under control. Equipment maintenance and a solid production schedule are keys to utility efficiency. With every production interruption, there is substantial waste."

As a part of its total productive maintenance (TPM) program, * Frito-Lay empowers employees with what it calls the "Run Right" system. Run Right teaches employees to "identify and do." This means each shift is responsible for identifying problems and making the necessary corrections, when possible.

This is accomplished through (1) a "power walk" at the beginning of the shift to ensure that equipment and process settings are performing to standard, (2) mid-shift and post-shift reviews of standards and performance, and (3) posting of any issues on a large whiteboard in the shift office.

Items remain on the whiteboard until corrected, which is seldom more than a shift or two. With good manpower scheduling and tight labor control to hold down variable costs, making time for training is challenging. But supervisors, including the plant manager, are available to fill in on the production line when that is necessary to free an employee for training. The 30 maintenance personnel hired to cover 24>7 operations at the Florida plant all come with multi-craft skills (e.g., welding, electrical, plumbing). "Multi-craft maintenance personnel are harder to find and cost more," says Wentzel, "but they more than pay for themselves."

Discussion Questions **

1. What might be done to help take Frito-Lay to the next level of outstanding maintenance? Consider factors such as sophisticated software.

2. What are the advantages and disadvantages of giving more responsibility for machine maintenance to the operator?

3. Discuss the pros and cons of hiring multi-craft maintenance personnel.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92015290

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As