Answer the following problems.
problem 1) prepare down the significant considerations for locating an automobile plant.
problem 2) Describe essentials of Project Management Philosophy.
problem 3) Numerous various strategies have been employed to assist in aggregate planning. Describe these in brief.
problem 4) Demonstrate the various methods by which quality is sought to be achieved using different tools and techniques
• Quality at the source
• Quality control tools
• Acceptance sampling
problem 5) Describe the basic competitive priorities considered while formulating operations strategy by a firm?
• Cost
• Quality
• Time
• Flexibility
problem 6) describe briefly the four classification of scheduling strategies
• Detailed scheduling C
• Cumulative scheduling
• Cumulative-detailed scheduling
• Priority decision rules.