Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Project Management Expert

Assignment

You have been selected to elicit requirements; design; and formulate testing, development, and implementation plans for a software application or system of your choosing. Throughout this course, you will be developing components of the overall specification document that will culminate in the final Key Assignment. Additional information and the deliverables for each Individual Project will be provided in the assignment description for this project.

Project Selection

The first step will be to select an application or a system as the target for developing a comprehensive System Requirements, Design, and Implementation Specification that will have sections from requirements, analysis, high-level, and detail models as well as design, development strategy, testing strategy, and an implementation plan. This project will be used as the basis for each of the assignments throughout the course and should conform to the following guidelines:

• Nontrivial: The selected software application or system should be a scope that is not too large to develop all of the requirements in a 5.5-Part period. A few examples of possible projects include, but are not limited to, the following:

o An ordering system (such as pizza)
o An inventory control system (for a small number of parts)
o A labor tracking or time-card system (for a small company)
o An online appointment request system
o An employee emergency contact system

• Domain knowledge: Students should be familiar enough with the application or system to allow focus on their specification documentation.

Select an enterprise that fits these requirements, and submit your proposal to your instructor before proceeding further with the assignments in the course. Approval should be sought within the first several days of the course. Your instructor will tell you how to submit this proposal and what notification will be given for project approval.

Task

For the assignments in this course, you will be developing an all-inclusive System Requirements, Design, and Implementation Specification. Your first task in this process will be to select an application or system to use as the basis of your projects. You will also create the shell document for the final Key Assignment project deliverable that you will be working on during each Unit. As you proceed through each project phase, you will add content to each section of the final document to gradually complete the final project. Appropriate research should be conducted to support the analysis in your report, and assumptions may be made when necessary.

• Submit your project proposal to your instructor for approval.
• System Requirements, Design, and Implementation Specification

o Use Word
o Title page

- Course number and name
- Project name
- Your name
- Date

o Table of Contents (TOC)

- Use an autogenerated TOC.
- This should be on a separate page.
- This should be a maximum of 3 levels deep.
- Be sure to update the fields of the TOC so that it is up-to-date before submitting your project.

o Section Headings (create each heading on a new page with "TBD" as content, except for Part 1)

- Part 1: System or Application Overview
- Part 1: Requirements Specification
- Part 2: System or Application Design
- Part 3: Test and Quality Assurance Plan
- Part 4: Development Strategy
- Part 5: Integration and Deployment Plan

• Part 1: System or Application Overview

o Provide a brief description of the system or application's capabilities.
o Who are the intended users and stakeholders?
o Who is the project initiator or sponsor?
o Be sure that this project is approved by the instructor before you proceed.

• Part 1: Requirements Specification

o Include the overall goals and objectives of the application or system.
o Include elicitation methods that are used to gather requirements.
o Describe functional requirements.

- Include a short description of the function being supported, a detailed description of the requirements, and how they will be measured during testing.

o Describe the nonfunctional requirements, also known as attributes of the system addressing areas such as usability, security, and performance.

- Include a short description of attribute category, a detailed description of the requirements, and how they will be measured during testing.

o Include assumptions and constraints to frame the scope of the project.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92826084
  • Price:- $45

Priced at Now at $45, Verified Solution

Have any Question?


Related Questions in Project Management

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Define a strategic information system give two examples of

Define a strategic information system. Give two examples of these systems

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

The hospitality industry comprises diverse and varied

The hospitality industry comprises diverse and varied functions and scale of operations. Some organisations may be single function business enterprise such as catering organisation. Others may be larger with multiple bus ...

You are recently assigned to manage an effort to upgrade

You are recently assigned to manage an effort to upgrade about 200 desktops in your company to Windows 10. The project has 4 team members reporting directly to you and is estimated to last about 3 months. Per your compan ...

Project investment analysis assignment -the aim of this

PROJECT INVESTMENT ANALYSIS ASSIGNMENT - The aim of this project is to introduce participants to concepts of Financial Feasibility Modelling and the use of spreadsheets for feasibility exercises. Assume that you have bee ...

What is the current state or condition of information

What is the current state or condition of Information Technology Project Management? What are the challenges and complexities faces by many IT Project Managers of today?

Annotated bibliographythis table lists criteria and

Annotated Bibliography This table lists criteria and criteria group name in the first column. The first row lists level names and includes scores if the rubric uses a numeric scoring method. Criteria Exemplary Competent ...

As a project manager answer these questions1 a how does the

As a project manager answer these questions, 1) a. How does the weighted scoring approach avoid the drawbacks of the NPV approach? b. Can the two approaches be combined? if so How? How are you going to apply this piece o ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As