This case study will ask you to use the DMAIC process for your process improvement project. The basis of this case study will follow Table 13-2 in your textbook, the Six Sigma process,

DMAIC:

1. Define the project goals and customer (internal and external) deliverables.
2. Measure the process to determine current performance.
3. Analyze and determine the root causes of the defects.
4. Improve the process by eliminating defects.
5. Control future process performance.

Provide at least one paragraph for each DMAIC step as noted above. Be creative and apply research, course concepts, tools, and techniques to help improve your process. Requirements of Submission: The case study assignments must follow these formatting guidelines: double spacing, 12-point Times New Roman font, and one- inch margins. Each case study should be one to two pages in length. Include at least two sources of research and follow APA guidelines for citations and references.

For this case study, use one or both of the following process improvements:

1. check sheet to collect data on the frequency or patterns of the events, problems, defects, defect location, defect causes, etcto narrow down the root cause of the issues andidentify corrective action

2. cause and effect analysis by Ishikawa

The basis of this case study will be based on the following:

A Closer look At Quality 13-2 D in Action

While Kevin Colby was working on a Six Sigma project at the Truck Components Automated Products Division of Eaton Corporation, the company was examining cost-savings opportunities. The division produced transmissions that included speed sensors, which measure shaft speeds and work in conjunc- tion with the gears produced by the Cleveland, Ohio-based company. The gears with holes caused signal fluctuations that affected the sensors. Two electronic control units (ECUs) with different circuit speeds were manufactured to allow the sensor to work with both types of gears.

Engineers within the division's design group who were involved with the gear project realized that they could simultaneously have an impact on two divisions. Jerry Ganski, principal engineer who led the effort to eliminate the second ECU, said, "We realized that removal of the holes in the gears would allow the Automated Products Division to eliminate the special ECU we had to manufacture to deal with the holes. We now use a common ECU for all our platforms and thus save the money it took to build, stock, and handle two ECU styles where the only difference between them was the speed sensor circuit. The savings is estimated at approximately 12 percent." Based on the improvements realized from these three projects, Eaton is investigating other gear-related projects for potential improvement opportunities.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92699948
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As