Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Project Management Expert

Assignment

For this assignment you must use the attached documents to complete the following assignment. You have to be able to create a Alpha version of the project.

Part 1: SLP Assignment Overview

When the requirements and design are completed for a project, the coding can begin. A good first step in development is to use the design to create a prototype, or proof of concept for the system. The prototype helps ensure the validity of the design and demonstrates that the basic concepts in the design will provide the desired solution. For this SLP assignment you will use your Design Document from the Case Study to guide the creation of a prototype for your integrated system.

Part 1 SLP Assignment Expectations

The Prototype should address the following requirements:

• The prototype should match the overall design created in the Case Study assignment and should provide evidence that the intended design will work.

• A basic visual interface to support navigation of the program and identify the future functionality of the application.

• No subsystem functionality is required but stubs to connectivity points for subsystems should be identified and have the ability to perform basic functionality tests.

• All code should be well-documented with comments.

• The program should run without significant errors.

• Include a document called operation.docxthat describes how to operate the application.

o This document should provide sufficient information to allow the instructor to set up and operate the application.
o Identify any external system requirements
o Key parts of the application should be identified (i.e., tell the instructor where to find the important parts of the application).
o This document should also provide a summary of how the prototype shows proof-of-concept for the project.
o Include a section called STATUS with a summary of the current status of your project including problems encountered and how they will be addressed. Be sure to contact your instructor if you need help addressing any issues.

Part 2: SLP Assignment Overview

For this SLP assignment you will submit the Alpha version of your project. An alpha version of an application will have the major functionality operational but not fully completed. The purpose of the Alpha version is to ensure the major functional components of the application will work as intended. Your alpha version should have connections established to all outside components and internally developed functionality should be operational at a least a fundamental level.

Part 2 SLP Assignment Expectations

The Alpha version should address the following requirements:

• The application should match the design created earlier in the course with the exception of any changes required to address problems or conform to a revised timeline.

• All major functionality should be operational at least at a minimal level.

• Connections to outside components should be functioning at a basic level to prove they will work for the final version of the application.

• The visual interface should provide access to all major functions of the application.

• There should be a demonstrable, functional connection to the required database for the project.

• All code should be well-documented with comments.

• The program should run without significant errors.

• Include a document called operation.docxthat describes how to operate the application.

o This document should provide sufficient information to allow the instructor to set up and operate the application.

o Identify any external system requirements

o Key parts of the application should be identified (i.e., tell the instructor where to find the important parts of the application and changes that have been made since the last submission).

o Include a section called STATUS with a summary of the current status of your project including work performed since the last submission, problems encountered and how they will be addressed. Be sure to contact your instructor if you need help addressing any issues.

Attachment:- Project-Plan.rar

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92743450
  • Price:- $60

Priced at Now at $60, Verified Solution

Have any Question?


Related Questions in Project Management

Advanced topics in project management assignment -outline -

Advanced Topics in Project Management Assignment - Outline - Project management is a highly regarded discipline in engineering. It experienced a number of changes or "natural evolution" in the last century, influenced by ...

Reflect on kotters 2007 steps for establishing a strategic

Reflect on Kotter's (2007) steps for establishing a strategic vision and buy-in for change. Describe how that framework can be applied to your strategic initiatives withinproject. Provide thoughts on how this could impro ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Project investment analysis assignment -the aim of this

PROJECT INVESTMENT ANALYSIS ASSIGNMENT - The aim of this project is to introduce participants to concepts of Financial Feasibility Modelling and the use of spreadsheets for feasibility exercises. Assume that you have bee ...

In software development and design how are requirement

In software development and design how are requirement documents used and maintained, especially as requirements evolve? Also, what processes, methods, and techniques are available for maintenance, and how effective are ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Define a strategic information system give two examples of

Define a strategic information system. Give two examples of these systems

Case study and research project clairicationfinding a case

Case Study and Research Project Clairication Finding a case for the research project does not mean that you are limited to the company identified in the case. Rather it is to identify an issue identified in the case that ...

As a project manager answer these questions1 a how does the

As a project manager answer these questions, 1) a. How does the weighted scoring approach avoid the drawbacks of the NPV approach? b. Can the two approaches be combined? if so How? How are you going to apply this piece o ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As