Assessment Task: Project Review

Task instructions: You have been tasked with selecting a suitable project form the tendering website Estimate One:

Your brief is to select a commercial construction project which is a minimum of 1000m2 gross floor area. The height of the building is to be no greater than 3 stories. As you will be required to work in a collaborative team during construction, your final submission may not be accepted by the board to progress through to construction.

The final selection will be made by the construction team which you will be part of. Weekly reporting is required to your direct supervisor.

You will be required to prepare a report on the building and construction planning practices for this project to assist in the final selection process.

Part A - All students to complete

Select and appropriate project based upon the brief provided above.

You are required to monitor amendments to the tender documents and discuss the contract options for this project.

Your report is required to include the details stated below but not be restricted only to them:

1. Authority requirements.

a) Discuss the regulatory requirements for the construction of your chosen building.

b) Identify potential design that maximises the profit of this project. (for the construction company)

c) Building approvals

d) Building Permits

e) Authorities involved and their requirements.

f) LPOD, gas, water, sewer, power, stormwater, use of dial before you dig.

g) Civil design - Council compliance.

h) Communication with authorities.

2. Project Details of:

a) Demolition assessment.

b) Details of possible design problems as the consultant team work through the design development.

c) Suitability of subcontractors and suppliers (materials etc.).

3. Describe the contractual arrangement between the client (developer) and building contractor (principal/head contractor) taking into consideration the following:

a) Subcontractor selection, availability, and construction techniques.

b) The contractual risks - AS4000 unless there is a contract specified.

c) Advantages and disadvantages of their contractual requirements.

d) Suggest an alternative contract as an option and discuss why you chose that option.

4. By providing a site description:

a) Assess the area around the site

b) Identify possible constraints

c) Access to the site is to be reviewed and planned for.

d) Dilapidation report

5. Subcontractor selection

a) Size of the sub-contractor

b) Financial capacity

c) Expertise

d) Plant and equipment

e) Labour force

Attachment:- Assignment File.rar

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92723519

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As