Ask Project Management Expert

Alaska Airlines operates in a land of rugged beauty, crystal clear lakes, spectacular glaciers, majestic mountains, and bright blue skies. But equally awesome is its operating performance. Alaska Airlines consistently provides the industry's number one overall ranking and best on-time performance. A key ingredient of this excellent performance is Alaska Airlines' Lean initiative. With an aggressive implementation of Lean, Ben Minicucci, Executive VP for Operations, is finding ever-increasing levels of performance. He pushes this initiative throughout the company with:

(1) a focus on continuous improvement,

(2) metrics that measure performance against targets, and

(3) making performance relevant to Alaska Airlines' empowered employees.

With leadership training that includes a strong focus on participative management, Minicucci has created a seven-person Lean Department. The department provides extensive training in Lean via one-week courses, participative workshops, and two-week classes that train employees to become a Six Sigma Green Belt.

Some employees even pursue the next step, Black Belt certification. A huge part of any airline's operations is fuel cost, but capital utilization and much of the remaining cost is dependent upon ground equipment and crews that handle aircraft turnaround and maintenance, in-flight services, and customer service.

As John Ladner, Director of Seattle Airport Operations, has observed, "Lean eliminates waste, exposes non-standard work, and is forcing a focus on variations in documented best practices and work time." Lean is now part of the Alaska Airlines corporate culture, with some 60 ongoing projects. Kaizen events (called "Accelerated Improvement Workshops" at Alaska Airlines), Gemba Walks (called "waste walks" by Alaska Airlines), and 5S are now a part of everyday conversation at Alaska Airlines. Lean projects have included

? Applying 5S to identify aircraft ground equipment and its location on the tarmac.

? Improving preparation for and synchronization of the arrival and departure sequences; time to open the front door after arrival has been reduced from 4.5 to 1 min.

? Redefining the disconnect procedure for tow bars used to "push back" aircraft at departure time; planes now depart 2-3 minutes faster.

? Revising the deicing process, meaning less time for the plane to be on the tarmac.
Improving pilot staffing, making Alaska's pilot productivity the highest in the industry. Every 1% improvement in productivity leads to a $5 million savings on a recurring basis. Alaska Airlines has achieved a 7% productivity improvement over the last five years.

405_Fig 04.jpg

Another current Lean project is passenger unloading and loading. Lean instructor Allison Fletcher calls this "the most unique project I have worked on." One exciting aspect of deplaning is Alaska's solar-powered "switchback" staircase for unloading passengers through the rear door (see photo). Alaska is saving two minutes, or nearly 17%, off previous unloading time with this new process. Alaska Airlines' Lean culture has made it a leader in the industry.

Discussion Questions*
1. What are the key ingredients of Lean, as identified at Alaska Airlines?

2. As an initial phase of a kaizen event, discuss the many ways passengers can be loaded and unloaded from airplanes.

3. Document the research that is being done on the aircraft passenger-loading probem.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M92015152

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As