You and your spouse have purchased a foreclosure you hope to flip for a profit. The two bathrooms had been recently remodeled by the previous owners. The three bedrooms need only cosmetic work - something you decide to undertake yourself. The majority of your budget will be used for remodeling the kitchen, the dining room, and the family room.

Since this is your first flip, you've hired an experienced home inspector to help you scope the project. You want to track costs carefully to stay as close to budget as possible and to give you an accurate baseline for similar work in future flips. Rather than doing a hierarchical decomposition of the project into various products/outcomes and then adding work package descriptors for each lowest-level product/outcome, you chose to list the components that needed work and then describe the work that must be completed for each of these components.

You've mentally segregated the work into two broad categories: (1) higher priority work and (2) lower priority work. The higher priority work includes modifications to the electrical, HVAC, and plumbing systems, removal of two walls to provide an open concept arrangement, and common flooring throughout the kitchen, family room, and dining room areas. The remaining work you consider to be of lower priority. The scope and/or quality of finishes in the kitchen, dining room, and/or family room may have to be reduced if the cost of the higher priority work becomes an issue. You've also decided to add several control accounts within the two broad categories of work so that you can monitor and manage costs more effectively. These control accounts include:

  • Utilities and Services (Electrical, HVAC, and Plumbing)
  • Wall Removals
  • Kitchen
  • Dining Room (DR)
  • Family Room (FR)

You decide to work backwards from your current list of work (shown below) to develop a WBS. You start by adding an element that represents the entire project and numbering it zero. To complete the WBS, you have to: (1) add the elements representing your two broad categories of work and the five control accounts; and (2) add a numbering system.

Question 1: Modify the WBS to add the two broad categories of work and the five control accounts listed above..

Question 2: Complete numbering the work breakdown structure in a hierarchical manner once these new elements are added. You want your scheduling software to roll up work package costs to these control accounts and the two broad categories of work.

WBS No.

WBS Element

0

Three-Room Renovation

Electrical System

Upgrade the electrical service to 200 amps

Replace the electrical panel

Rerun electrical circuits affected by wall removals

Run four new electrical circuits to the kitchen area

HVAC

Install new furnace and air conditioning units

Rerun heating and ventilation ducts affected by wall removals

Install ventilation duct for new kitchen range hood

Install ventilation duct for new kitchen microwave

Plumbing Systems

Install larger diameter water pipe from water meter to the house

Install tank-less hot water heater

Rerun water pipes affected by wall removals

Rerun vent pipes affected by wall removals

Install water supply pipe for refrigerator ice maker

Wall 1 Removal - Between Kitchen and Dining Room

Demolish existing wall 1

Install new beam 1 to accept existing structural loads

Repair ceiling in way of the new beam 1

Wall 2 Removal - Between Dining Room and Family Room

Demolish existing wall 2

Install new beam 2 to accept existing structural loads

Repair ceiling in way of the new beam 2

Flooring

Install new laminate flooring in the kitchen, dining room, and family room

Kitchen Window (Over Sink)

Remove existing window over the sink

Install new energy efficient window over the sink

Replace/repair drywall as necessary around the kitchen window

Install kitchen window trim

Kitchen Lighting

Replace existing can lights

Install new pendant lights over the island

Kitchen Cabinets, Island, and Countertops

Kitchen Cabinets

Install upper cabinets

Install lower cabinets

Install cabinet hardware

Kitchen Island

Install island

Install island hardware

Kitchen Countertops

Install cabinet countertops

Install island countertop

Kitchen Painting

Repair any remaining drywall defects in the kitchen

Paint the kitchen

Kitchen Appliances

Install range top

Install oven

Install microwave

Install refrigerator

Install dishwasher

DR Window

Remove existing DR window

Install new energy efficient DR window

Replace/repair drywall as necessary round the DR window

Install DR window trim

DR Lighting

Install new DR chandelier

DR Painting

Repair any remaining drywall defects in the DR

Paint the DR

FR Windows

Remove three existing FR windows

Install three new energy efficient FR windows

Replace/repair drywall as necessary around FR windows

Install FR window trim

FR Sliding Door

Remove existing FR sliding door

Reframe as necessary for new French door

Install new energy efficient French door

Replace/repair drywall as necessary around the door

Install door trim

FR Painting

Repair any remaining drywall defects in the FR

Paint the FR

Business Management, Management Studies

  • Category:- Business Management
  • Reference No.:- M92727222
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Business Management

What kind of society would probably encourage leaders to be

What kind of society would probably encourage leaders to be autocratic? What kind of society would encourage them to be participative?

Discuss how strategic management differs from

Discuss how Strategic Management differs from Economics Discuss how Strategic Management differs from Business Management

Some goods are normal goods at lower income levels and

Some goods are normal goods at lower income levels and inferior goods at higher income levels. One example is the fast food category in the US restaurant industry (e.g., McDonalds). In this case, lower income consumers w ...

List 2 penalties a judge may impose on you if you fail to

List 2 penalties a judge may impose on you if you fail to meet your duties under the WHS act.

Suppose that michael stops by a hamburger restaurant five

Suppose that Michael stops by a hamburger restaurant, Five Men, to have lunch. He feels that the benefit from the first hamburger is worth $8.50, the benefit from the second one is worth $6.00, the benefit from the third ...

1 how could a manager educate stakeholders on effective

1) How could a manager educate stakeholders on effective risk management? 2) How risk management should relate to the scope, schedule and budget?

What is the purpose of using a diagnostic instrumentmodel

What is the purpose of using a diagnostic instrument/model to help manage change. Describe the key aspects that an instrument/model should effectively identify or outline in order to facilitate change.

Assume that you are the owner and manager of a small

Assume that you are the owner and manager of a small business. Having a strategy for your business. Be sure to include each of the three primary strategic components.

You want to check if the variability of transit time

You want to check if the variability of transit time changes the choice of path. You found the following standard deviation in transit time at these point: time at Valparaiso port (5 days), transit time to Newark port (4 ...

Why the price of a good and service is less than the cost

Why "The price of a good and service is less than the cost of the good and service due to the existence of opportunity cost" is right? Use economic concepts.

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As