Q. A set of jobs needs to be scheduled through a single employment center. The details of the jobs in terms of their processing times also due dates are given below:
Jobs 1 2 3 4 5 6
Processing times 4 6 10 12 3 9
Due dates 21 14 15 22 3 12
Use different scheduling rules to achieve different objectives as listed below also provide a rationale for each of the responses: 1. Minimize the throughput time. 2. Minimize the lateness of all jobs. 3. Minimize the prematurity of all jobs. 4. Minimize the number of jobs which are late beyond their due dates.