Southwestern University:

Southwestern University (SWU), a large state college in Stephenville, Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown relationship, the school is a dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, SWU is a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive and long-desired number-one ranking, in 2009, SWU hired the legendary Phil Flamm as its head coach.

TABLE: 3.6 Southwestern University Project

 

 

 

Time Estimate (days)

Activity

Description

Predecessor (s)

Optimistic

Most Likely

Pessimistic

Crash Cost/Day

A

Bonding insurance, tax structuring

-

20

30

40

$1,500

B

Foundation, concrete footing for boxes

A

20

65

80

3,500

C

Upgrading skybox stadium seating

A

50

60

100

4,000

D

Upgrading walkways, stairwells, elevators

C

30

50

100

1,900

E

Interior wiring, lathes

B

25

30

35

9,500

F

Inspection approvals

E

0.1

0.1

0.1

0

G

Plumbing

D, F

25

30

35

2,500

H

Painting

G

10

20

30

2,000

I

Hardware/AC/metal workings

H

20

25

60

6,000

J

Tile/carpet/windows

H

8

10

12

0

K

Inspection

J

0.1

0.1

0.1

4,500

L

Final detail work/cleanup

I, K

20

25

60

 

One of Flamm's demands on joining SWU had been a new stadium. With attendance increasing, SWU administrators began to face the issue head-on. After 6 months of study, much political arm wrestling, and some serious financial analysis, Dr. Joel Wisner, president of Southwestern University, had reached a decision to expand the capacity at its on-campus stadium. Adding thousands of seats, including dozens of luxury skyboxes, would not please everyone. The influential Flamm had argued the need for a first-class stadium, one with built-in dormitory rooms for his players and a palatial office appropriate for the coach of a future NCAA champion team. But the decision was made, and everyone, including the coach, would learn to live with it. The job now was to get construction going immediately after the 2015 season ended. This would allow exactly 270 days until the 2016 season opening game. The contractor, Hill Construction (Bob Hill being an alumnus, of course), signed his contract. Bob Hill looked at the tasks his engineers had outlined and looked President Wisner in the eye. "I guarantee the team will be able to take the field on schedule next year," he said with a sense of confidence. "I sure hope so," replied Wisner. "The contract penalty of $10,000 per day for running late is nothing compared to what Coach Flamm will do to you if our opening game with Penn State is delayed or canceled." Hill, sweating slightly, did not need to respond. In football-crazy Texas, Hill Construction would be mud if the 270-day target was missed. Back in his office, Hill again reviewed the data (see Table 3.6 ) and noted that optimistic time estimates can be used as crash times. He then gathered his foremen. "Folks, if we're not 75% sure we'll finish this stadium in less than 270 days, I want this project crashed! Give me the cost figures for a target date of 250 days-also for 240 days. I want to be early , not just on time!"

Discussion Questions

1. Develop a network drawing for Hill Construction and determine the critical path. How long is the project expected to take?

2. What is the probability of finishing in 270 days?

3. If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times.

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M92165292

Have any Question?


Related Questions in Operation Management

Answer the following 1 the product i chose are the parish

Answer the following : 1. The product I chose are the Parish Magic Line cake pans. These pans can be found online and used by home bakers. The pans are a great buy and if cared for properly will last years. Many bakers b ...

1 environmental scanning is always conducted before

1. Environmental scanning is always conducted before strategy formulation. Discuss the importance of both the societal and task environments to strategic planning in an organization. 2. What is Omni-Channel Distribution ...

Discussion question - summary amp critical thinking -

Discussion Question - Summary & Critical Thinking - Week/Course Learning Outcomes Welcome to the last week of your course. In this discussion question you have the opportunity to be creative and to relate what you have l ...

1 the computation of basic earnings per share will include

1. The computation of basic earnings per share will include consideration of A. all convertible securities. B. only shares outstanding. C. shares outstanding and convertible securities. D. none of the above. 2. A represe ...

Part 1 at least a 100 words for the answers to both

Part 1: At least a 100 words for the answers to both questions. Examine ethical behavior within firms in relation to financial management. Provide two (2) examples of companies that have been guilty of ethics-based malfe ...

1 compare the service capability of motor shipments to that

1. Compare the service capability of motor shipments to that of rail shipments? Provide your logic as to when you would choose one transportation method over another. 2. Compare the sick day benefits between Target and W ...

Questions1rewards are created to motivate individuals in

Questions: 1_Rewards are created to motivate individuals in the workplace (McShane, 2013). That said, do you feel that individuals should be rewarded for doing their job? When does one proceed to reward someone in the wo ...

A production process consists of a three-step operation the

A production process consists of a three-step operation. The scrap rate is 11 percent for the first step and 9 percent for the other two steps. a. If the desired daily output is 486 units, how many units must be started ...

Assignmentoutsourcing may provide tremendous advantages for

Assignment Outsourcing may provide tremendous advantages for firms. It may allow companies to specialize, reduce costs, and focus narrowly on the core competencies they deem strategic; however, companies also have to thi ...

1 in 250 words what is the difference between a low-context

1. In 250 words, What is the difference between a low-context culture and a high-context culture? Name a country that is an example of each type and offer evidence for your answer. How would you alter your marketing stra ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As