Question 1 of 17

At a Six Sigma quality level, if the process mean isheld exactly on target, the expected result would be:

A. 1.5 defects per thousand opportunities.

B. 2.8 defects per ten thousand opportunities.

C. 3.4 defects per million opportunities.

D. 2.0 defects per billion opportunities.

 

Question 2 of 17

A grocery store finds that a patron typicallypurchases 20 items per visit. In one day, the grocer found that the checkoutscanners made 240 price-reading errors in servicing 11,000 patrons. The dpmo is_____.

 A. 0.022

 B. 45.83

 C. 1091

 D. 1818

 

Question 3 of 17

Which of the following constitutes an operationaldefinition of a service quality measure?

 A. Highlyprofessional service

 B. Few latedeliveries

C. Phone calls answered within two rings

D. Very accurate customer billing

 

 Question 4 of17

A level of 3.4 defects per million opportunities canbe achieved in all of the following ways EXCEPT:

A. with 0.0-sigma off-centering and 4.0-sigma quality.

B. with 0.5-sigma off-centering and 5.0-sigma quality.

C. with 1.0-sigma off-centering and 5.5-sigma quality.

D. with 1.5-sigma off-centering and 6.0-sigma quality.

 

Question 5 of 17

A _____ is a _____ of the data from the largestfrequency to the smallest.

A. histogram; scatter diagram

B. pareto diagram; histogram

C. scatter diagram; break-down chart

D. check sheet; chronological chart

 

Question 6 of 17

Control limits relate to _____, while specificationlimits relate to individual measurements.

A. values within the upper and lower control limits

B. total values in the range

C. median values

D. averages of samples

 

Question 7 of 17

A manager at a canning company wants to monitor thenumber of orange

juice cans it produces each day that are beyond theupper specification

limit for can diameter. Each day an employee willrandomly select 150

cans and then determine and plot the number of cansthat are beyond the

upper specification limit for can diameter. Theappropriate control

chart is a(n):

A. -chart.

B. R-chart.

C. p-chart.

D. np-chart.

 

Question 8 of 17

A run of __________ consecutive points on the sameside of the center line is evidence that the mean has shifted.

 A. four

 B. five

C. six

D. seven

E. eight

 

Question 9 of 17

Which of the following would be used to monitor thenumber of nonconforming items?

A. np-chart

B. p-chart

C. u-chart

D. n-chart

 

Question 10 of 17

Which of the following charts is used to monitor theaverage number of defects per unit when subgroup sizes vary?

 A. s-chart

B. c-chart

C. p-chart

D. u-chart

 

Question 11 of 17

If the sample size in a p-chart increases from 100 to120, the upper and lower control limits will

A. move farther apart away from the center line

B. move closer together toward the center line

C. remain the same distance from each other

D. both shift upward with the upper control limitmoving further from the center line and the lower control limit moving closerto the center line

Question 12 of 17

Five samples of size 20 were collected for a variablemeasurement. All sample data were greater than or equal to 3.0. The samplemeans and sample ranges are provided in the following table.

 

sample number

1

2

3

4

5

sample mean

5.0

4.9

5.0

6.0

5.2

sample range

0.2

4.9

0.1

0.0

0.3

The values of which sample are identical?

A. sample 1

B. sample 2

C. sample 3

D. sample 4

E. sample 5

 

Question 13 of 17

Twenty samples of size 50 were taken from a process.The total number of defectives found was 86. The standard deviation for thenumber of nonconforming items for an np-chart is:

 A. 0.0396

 B. 1.2538

 C. 1.9825

D. 2.0736

E. 3.9302

 

Question 14 of 17

The Chair of the Management Department at UB wants toconstruct a p-chart for determining whether the four (4) faculty membersteaching the course are under control with regards to the number of studentswho fail in the course. Accordingly, the Chair sampled 100 final grades fromlast year for each instructor, and computed the proportion of failures perinstructor as 0.03, 0.02, 0, and 0.03 respectively. The three sigma uppercontrol limit (UCL) would be

 A. 0.95

B. 0.062

C. 0.0388

D. 0.140

E. None of the above

 

Question 15 of 17

The control limits for a c-chart are:

Upper Control Limit = 10.00

Center Line = 4.00

Lower Control Limit = 0.00

 Determine thenumber of samples used to construct this chart.

A. 2

B. 4

C. 10

D. 16

E. Cannot be determined based on the informationpresented.

 

Question 16 of 17

Twenty-five circuit boards were inspected to determinethe total number of defects per unit. The total number of defects found was225. The standard deviation for use in designing the control limits for thec-chart is:

A. 3

B. 5

C. 9

D. 15

E. none of the above

 

Question 17 of 17

A machined part has a lower tolerance limit of 4.1inches and an upper tolerance limit of 4.9 inches. The range for thepre-control green zone is:

A. 4.1 to 4.9 inches.

B. 4.3 inches to 4.7 inches

C. 4.0 inches to 5.0 inches

D. less than 4.1 inches.

E. 4.5 inches to 4.9 inches.

 

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M91265082

Have any Question?


Related Questions in Operation Management

1 according to point one of demingrsquos 14 points for

1. According to point one of Deming’s 14 points for quality improvement, the responsibility of improving a firm’s competitive position lies with ______. a. top management b. suppliers c. middle management d. employees 2. ...

An employee has come to you with a request to take on a

An employee has come to you with a request to take on a part-time job. The employee would be working for Price Waterhouse as a contract employee during tax season. The employee has assured you that she will not work more ...

1 a display the customer id customer name and customer

1. a. Display the customer ID, customer name and customer state in the table Customer_T if the customer has business in the Central or NorthEast territories b. Sort the result set by customer state in ascending order 2. ...

The bijou theater shows vintage movies customers arrive at

The Bijou Theater shows vintage movies. Customers arrive at the theater line at the rate of 100 per hour. The ticket seller averages 30 seconds per customer, which includes placing validation stamps on customers' parking ...

Find an example illustration or application of this weeks

Find an example, illustration, or application of this week's topic from any source listed in this week's assignment. Any sources should be cited. • The news media (including newspapers, trade publications, magazines, onl ...

The following data are annual disposable income and total

The following data are annual disposable income and total annual consumption for 12 families selected at a random from a large metropolitan area. Regard annual disposable income as the explanatory variable and total annu ...

1 creating and sustaining successful teams is a challenge

1. Creating and sustaining successful teams is a challenge in many organizations, label the type of team you are working in or one type you have worked on, and discuss the strategies that can be employed to make the team ...

Big turkey burger farms btbf produces a large turkey burger

Big Turkey Burger Farms (BTBF) produces a large turkey burger that is world famous. This burger is known not only for its quality, but also its size and consistency. They produce a turkey burger that on average is 11.98 ...

Consider a supermarket deciding on the size of its

Consider a supermarket deciding on the size of its replenishment order for Tide laundry detergent. What costs should it take into account when making this decision? How do these costs for the supermarket change if it wer ...

Introduction to supply chain managementfor all the problems

Introduction to Supply Chain Management For all the problems, to receive full scores, you have to show your complete and accurate work. If you only provide the final answers without showing your computations, you will no ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As