Question 1: ISO 9001:2008 standards provide strict guidelines for how products are to be produced.

True

False

Question 2: The central line on a p-chart is 0.50 with a UCL of 0.65 and an LCL of 0.35. The results of the next six samples are 0.60, 0.37, 0.45, 0.48, 0.45, and 0.42. What should you do?

Nothing; the process is behaving as expected.

Explore the assignable causes because three observations are above the central line.

Explore assignable causes because there is a run.

Increase the sample size to get a better measure.

Question 3: The Baldrige Performance Excellence Program considers a company's business results but ISO 9001:2008 registration does not.

True

False

Question 4: The underlying statistical distribution for the p-chart is:

Poisson.

binomial

percentage.

normal.

Question 5: The ISO 9001:2008 standard:

emphasizes corporate leadership as a means of determining who receives the award.

has the greatest number of points awarded for business results.

is awarded by the U.S. government each year.

addresses quality system documentation.

Question 6: Use the information from Table, What is the upper control limit (UCL) if the bank were to use z = 2 and a sample size of 100?

Sample Number Number Defective
1 1
2 4
3 2
4 4
5 0

less than or equal to 0.02

greater than 0.02 but less than or equal to 0.04

greater than 0.04 but less than or equal to 0.06

greater than 0.06

Question 7: A metal-cutting operation has a target value of 20 and consistently averages 19.8 with a standard deviation of 0.5. The design engineers have established an upper specification limit of 22 and a lower specification limit of 18. What is the process capability ratio?

1.20

1.33

1.46

1.66

Question 8: Historically, the average proportion of defective bars has been 0.015. Samples will be of 100 bars each. Construct a p-chart using z = 3. Suppose a sample had 0.07 defectives. What would you do?

Nothing; it is just random variation.

Look for assignable causes.

Change z to 2 and take another sample.

Change z to 4 and continue sampling.

Question 9: Samples of 100 checks each were taken at a bank from an encoding machine (which records the amount of a check) over a five-day period. Details are summarized in Table. If the bank were to use the average proportion defective from these five samples as the central line for a process control chart, what would be the central line?

Sample Number Number Defective
1 1
2 4
3 2
4 4
5 0


less than or equal to 0.01

greater than 0.01 but less than or equal to 0.02

greater than 0.02 but less than or equal to 0.03

greater than 0.03

Question 10: A metal-cutting operation has a target value of 20 and consistently averages 19.8 with a standard deviation of 0.5. The design engineers have established an upper specification limit of 22 and a lower specification limit of 18. What is the process capability index?

1.20

1.33

1.46

1.66

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M91642378
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Operation Management

Conflictdefine functional versus dysfunctional conflict in

Conflict Define functional versus dysfunctional conflict in a work group and explain how you can increase functional conflict and decrease dysfunctional conflict. Develop a response that includes examples and evidence to ...

For this assignment you will need to find 2 articles in

For this assignment, you will need to find 2 articles in business that can help describe what are IT strategic initiative being undertaken by an organization are like. Choose a different organization for each of the arti ...

Coping with problems joe is a little nervous he has just

Coping With Problems Joe is a little nervous. He has just been transferred from another plant to take over a production line. Production is down and there is a serious problem with absenteeism. To make matters worse, the ...

Over 30 years ago michael porter identified a holistic

Over 30 years ago Michael Porter identified a holistic approach to understanding how competitive forces shape strategy. He posited that the only way to truly insulate an organization from underlying economic volatility i ...

You are the contracting officer for an air-to-ground

You are the contracting officer for an air-to-ground missile development program. A contract for pre-production models of the missile was awarded by your predecessor and the contractor is behind schedule. In a program me ...

The ikea case provides an excellent opportunity to apply

The IKEA case provides an excellent opportunity to apply strategic management concepts to a large privately-held company that is expanding into India. IKEA is a Netherlands-based Swedish company with a presence in 44 cou ...

Can you answer for me the following questions about social

Can you answer for me the following questions about social loafing and the three main causes of free-riding. 1. Give a description of the phenomenon of social loafing. 2. Give a description of the phenomenon of free-ridi ...

1 analyzing the bridgestonefirestone and ford motor company

1. Analyzing the Bridgestone/Firestone and Ford motor company, is it sufficient to use the ISO/QS 9000 standards as the main basis of vendor/product selection? 2. What position to these cars company ( 1. Volkswagen, 2. F ...

Research the effect of primary and secondary seat belt laws

Research the effect of primary and secondary seat belt laws on the occurrence of motor-vehicle injuries and fatalities. Explain how epidemiologic studies influenced the development of current seat belt laws. Describe how ...

Please provide a brief paragrap of the key takaways from

Please provide a brief paragrap of the key takaways from each of the following topics: Designing Clear Visuals in business reports Designing Successful Documents and Websites Writing Winning Proposals

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As