Question #1

A production line is to be designed for a job with four tasks. The cycle times are 5.4 minutes, 2.8 minutes, 3.9 minutes, and 4.7 minutes. The raw process time is ______ and the bottleneck cycle time is ______ minutes.

Question #2

Do some research on what takt time is and then determine takt time from the information below. In your assignment submission please make sure you define takt time.

The takt time a production line is expected to meet is 3000 parts over the next five day week in which each day has 12hrs of available time. There are four operations in the line and their cycle times are 1.5 minutes, 0.4 minutes, 1.03 minutes, and 2.9 minutes per job. The takt time is ______ minutes, and the bottleneck time is _________ minutes.

Will the line make the takt time? (Please show your work)

Question #3

Consider the following three-station production line with a single product that must visit stations 1, 2, and 3 in sequence.

· Station 1 has 3 identical machines with an average processing times of 5 minutes per job

· Station 2 has 10 identical machines with an average processing time of 20 minutes per job.

· Station 3 has 4 machines with average processing times of 3 minutes per job.

How long does it take for a product to go through the entire production line?
What is the cycle time of each station?
What is the bottleneck rate for the production line and what station is it?
Compute w0 for production line?
What is the takt time of the line given that 5600 parts have to be made over the course of 100 hrs?
Can the three station production line make this takt time? If not how many machines would I need at station 1, 2, and 3?

Question #4

T&D electric manufactures high-voltage switches and other equipment for electric utilities. One line that is staffed by three workers assembles a particular type of switch. Currently the threes workers have fixed assignments; each worker fastens a specific set of components on the switch and passes it downstream on a rolling conveyor. The conveyor has capacity to allow a queue to build up in front of each worker. The bottleneck is the middle station with a rate of 11 switches per hour. The raw processing time is 15 minutes. To improve efficiency of the line, management is considering cross-training the workers and implementing some form of flexible labor system.

a) What is the critical amount of WIP that is needed by this line?

b) If the current throughput is 10.5 switches per hour with an average WIP level of 7 jobs what is the average cycle time?

c) What is the practical worst case throughput of the line?

d) Is there any room for improvement on this line?

Question #5

Floor-On, Ltd., operates a line that produces self-adhesive tiles. This line consists of single-machine stations and is almost balanced (i.e., station rates are nearly equal). A manufacturing engineer has estimated the bottleneck rate to be 2200 cases per 16-hour day and the raw process time to be 30 minutes. The line has averaged 1,500 cases per day, and cycle time has averaged 5 hours.

a) What is the estimated average WIP level?

b) How does the performance of the average throughput compare to the practical worst case throughput?

c) What would happen to the throughput of the line if we increased the capacity of bottleneck station and held the WIP at its current level? (1 point)

d) If after process improvements the ten machines that required ten workers to run them are no longer needed. Instead five workers are now needed what would you do with the remainder of workers not working on that line anymore? (And please don't fire them)

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M91296815
  • Price:- $70

Guranteed 36 Hours Delivery, In Price:- $70

Have any Question?


Related Questions in Operation Management

Assignmentthe nominal group technique ngt is a common

Assignment The Nominal Group Technique (NGT) is a common method of group decision making. The group members will meet to discuss their ideas and all parts of the problem and possible solutions and then the voting is done ...

Place yourself for the moment in the following scenario you

Place yourself, for the moment, in the following scenario: You are a buyer, managing an outsourced software development project in which specifications and requirements may change drastically throughout the project life ...

1 jack is in business in competition with jillrsquos

1. Jack is in business in competition with Jill’s employer. Jack pays Jill $450 for her to steal her employer’s current customer list by copying it onto a flash drive and delivering it to him. Jill knows that her employe ...

1 how can i write my paper focusing on marijuana

1. How can I write my paper focusing on marijuana legalization in Colorado and the conflict it brings between HR policies and employees, What can it bring to the workplace and how can we solve it? 2. In a Project Managem ...

Determining safety stockafter keeping track of demand

Determining Safety Stock After keeping track of demand during each 7 day lead time cycle, the average daily demand was found to be normally distributed with a mean of 100 and a standard deviation during lead time of 50. ...

Research the topic of waste reduction and identify a

Research the topic of waste reduction and identify a company that has proactively reduced the waste associated with its products. Respond to the following: Analyze the sustainable approach to waste reduction developed by ...

Volkswagen group as a manufacturing company - describe the

Volkswagen Group as a manufacturing company - describe the nature of business of the selected organisation and explain the impact of fluctuations of the exchange rate on business performance. Identify and explain three f ...

What contributions can high self-monitors make in

What contributions can high self-monitors make in organizations? Low self-monitors? Conduct additional research on self-monitoring to add in answer the question. How can managers increase their employee's job satisfactio ...

This assignment has two partsadam smiths invisible hand

This assignment has two parts: Adam Smith's "Invisible Hand" theory states that if each consumer is allowed to choose freely what to buy and each producer is allowed to choose freely what to sell and how to produce it, t ...

1 what is involved in developing a business plan for

1. What is involved in developing a business plan for production and supply of products? What role do retailers play in achieving the important flexibility that is so important to efficient and timely supply of products? ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As