PROJECT MANAGEMENT

TEXT BOOK:  Project Management Achieving Competitive Advantage (4thEdt.)

All assignments must be:

Essay Responses:  All questions need to be answered in essay format (must be typed, doubled spaced, Times New Roman, 12 point font, with 1" margins, and all sources must be sited).

Mathematical Responses:  Students must show all the formulas and all procedures.  Answers only will not be accepted, make sure to show all your work.  Answers must be typed, double spaced, Times New Roman, 12 point font, with 1" margins).

For this assignment you will need to complete the following questions in essay format:

Chapter 8: Questions 8.2, 8.3 (page 283)  and Problems 8.3, 8.6, 8.8 (pages 284-285)

QUESTIONS:

8.2 How has the global economy affected the importance of cost estimation and cost control for many project organizations?

8.3 Why is cost estimation such an important component of project planning? Discuss how it links together with the Work Breakdown Structure and the project schedule.

SOLVE PROBLEMS:

8.3 Calculate the fully loaded cost of labor for the project team using the following data. What are the costs for the individual project team members? What is the fully loaded cost of labor?

Name

Hours Needed

Overhead Charge

Personal Time Rate

Hourly Rate

Fully Loaded Labor Cost

Sandy

60

1.35

1.12

$18/hr


Chuck

80

1.75

1.12

$31/hr


Bob

80

1.35

- 0 -

$9/hr


Penny

40

1.75

1.12

$30/hr



Total Fully Loaded Labor Cost =



8.6 Using the following information about work package budgets, complete the overall time-phased budget for your project. (All cost figures are in $000s). Which are the weeks with the greatest budget expense?

Table for Problem 8.6

Task

Budget

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Week 7

Week 8

A

5

3

2







B

8

1

4

3

1





C

12


2

7

3





D

7



3

3

1




E

14




5

5

2

2


F

6






1

2

3

Plan

52

4

8







Cumulative


4

12







1.For Problems 8 through 10, refer to the chart of learning curve coefficients (unit and total time multipliers) shown at the bottom of this page.

The simplified formula for calculating learning rate time using the table coefficients is given as:

TN=T1CTN=T1C

where

TN=Time needed to produce the nth unitT1=Time needed to produce the first unitC=Learning curve coefficientTN=Time needed to produce the nth unitT1=Time needed to produce the first unitC=Learning curve coefficient

2.8.8 It took MegaTech, Inc., 100,000 labor-hours to produce the first of several oil-drilling rigs for Antarctic exploration. Your company, Natural Resources, Inc., has agreed to purchase the fifth (steady state) oil-drilling rig from MegaTech's manufacturing yard. Assume that MegaTech experiences a learning rate of 80%. At a labor rate of $35 per hour, what should you, as the purchasing agent, expect to pay for the fifth unit?

Chapter 9: Questions 9.3, 9.5 (page 325) and Problems 9.5,  9.7, 9.10 (page 325-327)

9.3 List three methods for deriving duration estimates for project activities. What are the strengths and weaknesses associated with each method?

9.5 "The shortest total length of a project is determined by the longest path through the network." Explain the concept behind this statement. Why does the longest path determine the shortest project length?

PROBLEMS:

9.5 Construct a network activity diagram based on the following information:

Activity

Preceding Activities

A

-

B

-

C

A

D

B, C

E

B

F

C, D

G

E

H

F

I

G, H

9.10 An advertising project manager has developed a program for a new advertising campaign. In addition, the manager has gathered the time information for each activity, as shown in the following table.

Time Estimates (week)

Activity

Optimistic

Most Likely

Pessimistic

Immediate Predecessor(s)

A

1

 4

 7

-

B

2

 6

10

-

C

3

 3

 9

B

D

6

13

14

A

E

4

 6

14

A, C

F

6

 8

16

B

G

2

 5

 8

D, E, F

a. Calculate the expected activity times (round to nearest integer).

b.Calculate the activity slacks. What is the total project length? Make sure you fully label all nodes in the network.

c. Identify the critical path. What are the alternative paths and how much slack time is associated with each non-critical path?

d.Identify the burst activities and the merge activities.

e. Given the activity variances, what is the likelihood of the project finishing on week 24?

f.  Suppose you wanted to have a 99% confidence in the project finishing on time. How many additional weeks would your project team need to negotiate for in order to gain this 99% likelihood?

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M93094152

Have any Question?


Related Questions in Operation Management

For each one of the risk factors for work-related stress

For each one of the risk factors for work-related stress: • Work demands, • Low levels of control, 1. Think about some possible solutions or ways to mitigate each of the risk factors that could be implemented in the work ...

Custom copies inc prepares and sells coursepacks which

Custom Copies, Inc., prepares and sells coursepacks, which contain compilations of readings for college courses. A teacher selects the readings and delivers a syllabus to the copy shop, which obtains the materials from a ...

According to a 2010 report prepared for the sba office of

According to a 2010 report prepared for the SBA Office of Advocacy, the United States ranked third in the world on the Global Entrepreneurship and Development Index (GEDI). View the report. Your textbook defines the exte ...

1 alex just started his first job as a new manager after he

1) Alex just started his first job as a new manager after he graduated from college. Alex relocated to a new city for this position and does not know many people at his employer or in the community. Which of the followin ...

Part one what is the pestel analysis for the south african

Part one: What is the PESTEL analysis for the South African wine industry. Part two: What does this analysis tell you about the attractiveness of the external environment for companies operating in the industry?

Select a social media tool that is appropriate for

Select a social media tool that is appropriate for marketing products, and determine and focus on one specific element of that tool. Present a complete explanation of how to use and manage that element. Each student's po ...

Forum descriptionassuming you canrsquot wave a magic wand

FORUM DESCRIPTION Assuming you can’t wave a magic wand and replace Twitter’s underlying technology, please address each of the following: (NOTE:  Copy/paste each question followed by your developed response. Do this thro ...

A company produces a different types of products the

A company produces a different types of products. The company has implemented a quality improvement program and the company's production for the past three years after the program implementation is shown in the table bel ...

1 from an operation management perspective how can

1. From an operation management perspective, how can operational metrics and analysis and best practices be implemented to contain costs? 2. How can Apple Inc. incorporate an enterprise risk management technique into the ...

Michael went to brennanrsquos market to pick up a few items

Michael went to Brennan’s Market to pick up a few items for dinner. It was raining, and the wind had blown water through the market’s door whenever it was opened. As Michael entered through the door, he slipped and fell ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As