Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

Problem: Toledo Custom Manufacturing (TCM), located in Toledo, Ohio, makes metal parts to customer specifications. They have a variety of machines including lathes, numerically controlled (NC) machines, grinders and drilling machines. They can make any metal parts that require use of these machines. TCM employs 65 workers, supervisors, and managers in its facility. TCM is very customer-oriented and prides itself on quality control. They take a Total Quality Management systems approach including use of control charts, ISO 9000 certification, employee training, and teams for continuous improvement of quality. TCM also selects its suppliers based on their ability to provide quality metal blanks and parts that are purchased.

THE PRECISE STEEL ROD ORDER

TCM recently received an order to machine 5000 push rods to be used in the production of hydraulic cylinders. The push rod is a precise steel rod that runs inside of a hydraulic cylinder to build pressure when activated. The push rod has very tight specifications to insure that hydraulic leaks do not occur. The particular rod ordered is 6" long and must be .500 inches in diameter (see Exhibit 1 for an illustration). The specifications call for ±.005" (5 onethousands of an inch) tolerance. Therefore all rods must be machined to a diameter between .495" and .505" to meet the specification and to be acceptable to the customer. In order to meet the customer's delivery schedule, TCM will utilize two machines, each with its own operator. The machines are similar, but operator 1 has more experience than operator 2. TCM must also insure that the supplier of blank steel rods will provide consistently good material for machining.

QUALITY CONTROL CHARTS

In order to prepare for the order, TCM has decided to make 30 parts on each operator-machine combination. Each operator-machine will run samples of 5 parts and make a total of six samples for 30 parts. Separate control charts will then be constructed using the samples to calculate the grand average and average range for each operator. These averages will be used to construct an upper control limit, center line and lower control limit for each of the operators. Then the six samples will be compared to these limits to see if the process is in-control or if there are outof-control points. If the process is in-control, the operator and machine can proceed to make good parts. Every hour a sample of 5 will then be taken and plotted on the chart of insure that the process is still in-control. If either machine-operator combination is out-ofcontrol based on the first six samples of 5 parts each, the

 

1352_Rod.png

process will need to be fixed before proceeding. After fixing the process another six samples of 5 parts each will be taken to see if the process is now in control and this is continued until a satisfactory test is completed. The customer has asked that the final control charts used to verify the operator-machine combinations be forwarded to them along with the 60 parts produced by the two machines. They also requested, that control charts be maintained by taking hourly samples and submitted along with future batches of the parts. In addition to statistical process control charts, the customer would like to receive a calculation of the process capability index (Cp and Cpk) to insure that the process is capable of meeting the specification. The data collected from the first six samples of 5 each are shown in Exhibit 2 for operator 1-machine 1 and operator 2-machine 2. These are the samples of 30 each required to insure that both operator-machine

1106_Rod 1.png

processes are in control before proceeding with full production of the 5000 unit order.

Questions

1. Calculate the control charts (UCL, CL, and LCL) for each operator-machine combination separately. Do this for both x-bar (average) and range charts. Draw conclusions from the charts about each operator machine combination.

2. What should be done based on the calculations from question 1?

3. What is the process capability for each operator machine combination?

4. Can you be sure that all the parts produced by in-control processes will meet the specification?

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M92748725

Have any Question?


Related Questions in Operation Management

1 explain why you would use find to locate an invoive based

1. Explain why you would use Find to locate an invoive. Based on chapter information, what is used to Instruct Find to limit its search? 2. Explain what is meant by the term Class I freight carrier. 3. Explain The variou ...

Prepare a managerial report structured as followstask 1-1

"Prepare a Managerial Report" structured as follows: Task 1-1: Structure and present your paper in the form of a Managerial Report, with a cover page, table of content, executive summary, main body, appendices. Expected ...

1 how does waste increase costs give three examples2 what

1. How does waste increase costs? Give three examples. 2. What techniques can be used to minimize deadlocks, and how? 3. Choose one of the recent laws that have been enacted that are included in the chapter and discuss w ...

Compliance inc ci conducts clinical human and animal trials

Compliance, Inc., (CI) conducts clinical human and animal trials for the pharmaceutical and biotechnology industries. Revenues are split evenly between early and late drug development services. In the area of early drug ...

1 speed and flexibility are needed in healthcare processes

1. Speed and flexibility are needed in healthcare processes. Discuss at least three components of time that impact the processes. Explain at least four healthcare scenarios where there may be lines or queues and three ke ...

This week yoursquoll dive into the importance of

This week you’ll dive into the importance of presentational aids and how they can help you support the overall message you’re attempting to deliver. For part 1 of this week’s discussion I want you think about a few thing ...

Pick your company1 pick a company to research make sure

Pick Your Company: 1. Pick a company to research. Make sure that it is large enough to have enough data to make it easy to research. It is desired that this company should have a reasonable use of Internet/e-commerce tec ...

Assignment1 after reading the case scenario in the

Assignment 1. After reading the case scenario in the document linked above, make an argument for one of the actions: staying with your teammate or descending alone. The technical aspects of mountain climbing are not impo ...

Eighth edition administrative office management an

Eighth edition Administrative office management An Introduction Zane K. Quible Ph.D. Mary Brown, the supervisor of the word processing center in Delta Corporation in San Antonio, recently retired because of her age. Duri ...

1 effective teachers know their content and continue to

1. Effective teachers know their content and continue to improve their own understanding within the disciplines to ensure student learning. Are there subjects or topics that you struggle to teach? What do you do to ensur ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As