Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

Problem: Midwestern Lighting7

"I can't see why you have to spend so much time looking at our processes. Hey, we have everything under control. It has been over five years since we got our last EPA inspection and nearly six years since we got our last major citation and fine. Things are going really smoothly and I really don't see why you have to look at the process. Now, why don't you go out and get me some cost savings? Every time I can save a penny per finished lighting assembly, I get that much better a chance to keep my business with the big boys." With those words, Barry Jamieson, the plant manager of Midwestern Lighting's Light Fixture Plant (LFP) dismissed Tim Bryant. Tim had been hired some six months ago to help improve overall operations at LFP. Initially, he had been brought in by corporate to identify opportunities for cost reduction and for reducing scrap and landfill related costs. When he arrived at LFP, located in New Hudson, Michigan, Tim found a plant that was operating under a siege mentality.

Everyone knew that they had to reduce costs and improve operating efficiencies if they hoped to win another contract from their three major customers. LFP was unique in that it was one of the few plants in the automotive industry that built light fixtures for GM, Ford, and Daimler-Chrysler. While LFP was noted for its superb quality, it was also recognized as not being very cost efficient. The managers of Midwestern Lighting had tried to convince the plant manager at LFP to consider QS9000 certification. That effort was a disaster and ultimately resulted in the dismissal of the plant manager. It was that dismissal that gave rise to the hiring of Barry Jamieson. Since arriving at LFP, Barry had developed a reputation for being a hard-nosed manager. To Barry, if you couldn't reduce cost, then you didn't have anything to say of importance. Barry was not really excited by Tim's presence. To Barry, Tim represented nothing more than increased overhead.

The Production Process Described

Since arriving at LFP, Tim could not help but feel that there were too many "diamonds in the rough" to ignore. Typical was the process for making the tail light assemblies for the Dodge Ram, one of the best selling trucks in the market. The process began with the back plate. This was long black piece of extruded ABS plastic (produced in another part of the plant) that contained two concave depressions-one for the turn light and one for the backup light. These were withdrawn from a temporary storage location found near the assembly line. Each back plate was first checked for cosmetic defects. Those that failed this step were placed in a bin where they were eventually used as a source of raw material for regrinds. Any plate passing this test was placed in a metalization chamber where nickel metal particles were sprayed on using a high-pressure water-based system. Because of the nature of the process, only half of the material ever reached the back plate. The rest either fell to the bottom of the chamber or was vented out. Periodically, the chamber had to be taken off line and cleaned out.

This process took 1 to 2 days and effectively shut down production of the tail light. After the parts were metalized, they were removed from the chamber and checked for completeness and evenness of the coverage. Any rejected parts were placed in a bin. Because of the presence of the metal coating, the back plate could not be recycled, so it had to be landfilled. The accepted parts went into a rack where they waited for the arrival of lenses from a supplier. A plastic-wrapped film covered the lenses. Each lens, as it arrived from the supplier, was checked for surface flaws. Any rejected lenses were then put into a recycle bin, where they were used as inputs for any parts requiring low-grade black plastic. The next step in the process was mating. At this stage, each lens was mated to a back plate. This was accomplished by placing the back plate and the lens into two fixtures. These fixtures were then fed into an automated gluing machine. The machine placed a bead of glue on the lens, waited for 10 seconds and then placed the lens onto the back plate. Periodically, the gluing machine had to be purged and cleaned.

This was typically done twice a shift; each instance required 30 minutes. This process was fairly messy and required several globs of glue to be expressed through the nozzle. After this was done, the last glob of glue was then expressed and the nozzle was removed. The machine had four nozzles. The residual glue and nozzles were then thrown into an old 55-gallon barrel. Because this barrel was used as a receptacle for all sorts of scrap (including floor sweepings and cigarette butts), the only disposal option was a landfill. After mating, the back light assembly was next tested for leaks. Placing the body into a tank of water and then shooting a burst of air through it completed the testing. Again, any assemblies that failed this test were put into a bin for eventual disposal in a landfill site. Those that passed this stage next proceeded to the finishing assembly. It was here that two light bulb assemblies were first made. These assemblies required one receiver and one light bulb each. Both the receiver and the light bulbs were provided by outside suppliers. After they were assembled, the assemblies were inserted into the appropriate holes in the car body.

The light assembly was then inspected for performance and surface blemishes. Any problem assemblies were put aside for rework. Those that could not be reworked were set aside for disposal (again landfilled). The remaining "good" assemblies were packed into a cardboard box and shipped out to the Dodge Ram Assembly plant. The current practice at the LFP was to allocate the total production cost to the number of good assemblies produced. By working with the material requirements planning system at LFP, Tim and others were able to track the following costs associated with waste in the process. For the tail light assemblies, the line produced 3,600 lot size/shift. Labor and overhead costs were considered to be fixed.

1280_Process.png

Questions

1. Assess the production process for the Ram light assembly. How efficient is it?

2. Develop a process map for this operation.

3. Where are the largest opportunities to reduce waste and associated costs?

4. What strategy/approach would you use for making recommendations to Barry Jamieson?

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M92759057

Have any Question?


Related Questions in Operation Management

Customers must be informed of major changes to a business

Customers must be informed of major changes to a business. Jay's Sporting Goods went through the bankruptcy process and was forced to close its stores. Jay’s also had to inform its loyal customers, those who were part of ...

1 compare and contrast continuous innovation radical

1. Compare and contrast continuous innovation, radical innovation, and the blue ocean strategy of product innovation. 2. International trade driving factors include (1) cost, (2) competition, (3) market and (4) technolog ...

Change management healthcare delivery system you are a

Change Management: Healthcare Delivery System: You are a consulting associate with Organizational Development, Inc., a national consulting firm that specializes in helping healthcare organizations deal with change. Your ...

In 2016 peppermint patty invests 140000 in a limited

In 2016, Peppermint Patty invests $140,000 in a limited partnership that is not a passive activity (only the at-risk rules apply, pages 11-4 & 11-5 in the textbook). During 2016, her share of the partnership loss is $82, ...

Discussioninformationin the course scenario this was stated

Discussion Information In the course scenario, this was stated regarding this assignment: In the last employee satisfaction survey, the CEO became aware of growing feelings of mistrust between employees and managers. Hir ...

Correcting sentence errors1 you can expect our fleet cars

Correcting Sentence Errors 1) You can expect our fleet cars to be pristine in working order you can also enjoy such amenities as cruise control, GPS tracking and satellite radio. 2) Without filling out the appropriate re ...

1 which is more important -- public safety or the

1. Which is more important -- public safety or the protection of Americans’ constitutional rights and liberties? List 3-5 reasons. 2. Should federal authorities be allowed to gain access to Americans’ business records (e ...

1 what is strategy and how can a critical role in

1. What is strategy and how can a critical role in communication matter? 2. Create a research paper outline that discuss the following question. Things Christians should know about Jewish life. 3. How important is the ab ...

Discuss which generic business-level strategy is best

Discuss which generic business-level strategy is best suited to keep the company you selected competitive. Here is what they posted to the question: The generic strategy that Nike falls into is the differentiation strate ...

You are president of a 50m metal component

You are President of a $50M metal component fabrication/assembly business. –100% Family Owned: Dad just retired (with a lot of knowledge), two kids (youngest is a sales rep) –The market is very competitive. Product is of ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As