Part-1

Your company operates an underground nickel mine producing 1.2 million tonnes of ore at a grade of 2.8% nickel. The orebody dips at 70° fairly regularly and is extensive along strike and down dip. Orebody width varies between 14 and 30 metres and averages 25 metres.

Until now the method of stoping has been by the sub-level blasthole stoping method, however due to dilution problems from a weaker than expected dunite hanging wall the decision to change mining method to mechanised transverse cut and fill stoping has been made. The UCS of dunite is 30 to 110 MPa.

The ore consists of a fine pentlandite disseminated in quartz dolerite. The UCS of the ore averages 250 MPA in a small range. The ore tends to be massive with little evidence of jointing or other structural features.

Cut and fill stope widths are to be 8 metres with 4m separating pillars, pillar recovery is to occur at a later date. Mining will be by 3 metre lifts using horizontal benching. Mechanised drilling is to be employed and 3m3 LHD's are to be used to haul ore to the mill holes. The mill holes are to be equipped with grizzlies with 0.5m apertures.

Occasionally the ground will be wet, but dry conditions are generally experienced.

1. Design the drilling/blasting pattern showing hole diameter, hole depth, burdens, spacings, explosive types, primers and initiation system and indicate the initiation sequence.

2.Select drill types, makes and models and estimate the number of drill units required to maintain production at existing levels. For the purposes of this exercise assume adjacent stopes can be accessed through pillars and that a 2 production shifts per day system is used

3. Calculate average figures for tonnes/round and powder factors in kg/tonne

Part-2

A gold mine has just completed mining waste pre-strip prior to commencing grade control mining. The waste rock was drilled and blasted for the pre-strip using 200mm diameter blast holes using a rotary blasthole drill and achieved a mining rate of 15,000 m3 per day. Blast parameters for the pre-strip were:

1.Blasthole burden5.7m
2.Blasthole spacing6.5m
3.Bench height15m
4.Subgrade drilling1.6m
5.ExplosiveANFOdensity 0.85 g/cc
6.Powder Factor0.57 kg/m3

Fragmentation in the waste was acceptable for the excavators; these will be used for grade control mining as well as bulk waste mining. Grade control mining is to be undertaken using 115mm diameter holes to achieve sampling control; these will be drilled using a tophammer hydraulic drill. Bench height for grade control mining is to be 5m.

The waste rock has a density of 2,600 kg/m3, ore has a density of 3,200 kg/m3 due to sulphides and alteration minerals.
1.Scale down the waste blast parameters from 200mm to 115 mm diameter blastholes and determine explosive consumption in the waste and ore rocks.

Note: in addition to ANFO the full range of Heavy ANFO's is available from the supplier.

2. Determine the drill metres required to achieve a production rate from grade control blasting of 6,000 m3/day

3. The penetration rate for the hydraulic drill is estimated to be 50m/hr. Determine the drill productivity based on one rod change that takes 30 seconds going down the hole and 45 seconds withdrawing it from the hole. In addition two samples are collected, this stops the drill for 30 seconds per sample and tramming between holes takes 1 minute 30 seconds.

4. Based on two 12 hour shifts per day, giving an effective 10.5 hours of drilling (assuming two 30 minute crib breaks and a 30 minute service period at the end of each shift) will one hydraulic drill be capable of the required production?

5.Based on the following accessory life calculate the accessory requirements and cost:

ShankLife 600 mCost $130.00
CouplingLife 500 mCost $85.00
Drill Steel (3.6m length)Life 1000mCost $230.00
Drill BitLife 210mCost $165.00

6. Calculate the total drilling cost per m3 based on the following:

Drill fuel $9.50 per drill operating hour
Drill labour cost $22.00/shift hour
Drill maintenance $11.50/drill shift hour
Ownership cost $11.50/drill shift hour based on 20,000 hours working life

7. Calculate the total drill and blast cost based on the following blasting costs:

Explosives $550.00/tonne
Blast initiation $11.30/blasthole
Blast labour $80.00/tonne of explosive

Homework Help/Study Tips, Others

  • Category:- Homework Help/Study Tips
  • Reference No.:- M9885422
  • Price:- $60

Priced at Now at $60, Verified Solution

Have any Question?


Related Questions in Homework Help/Study Tips

Review the website airmail service from the smithsonian

Review the website Airmail Service from the Smithsonian National Postal Museum that is dedicated to the history of the U.S. Air Mail Service. Go to the Airmail in America link and explore the additional tabs along the le ...

Read the article frank whittle and the race for the jet

Read the article Frank Whittle and the Race for the Jet from "Historynet" describing the historical influences of Sir Frank Whittle and his early work contributions to jet engine technologies. Prepare a presentation high ...

Overviewnow that we have had an introduction to the context

Overview Now that we have had an introduction to the context of Jesus' life and an overview of the Biblical gospels, we are now ready to take a look at the earliest gospel written about Jesus - the Gospel of Mark. In thi ...

Fitness projectstudents will design and implement a six

Fitness Project Students will design and implement a six week long fitness program for a family member, friend or co-worker. The fitness program will be based on concepts discussed in class. Students will provide justifi ...

Read grand canyon collision - the greatest commercial air

Read Grand Canyon Collision - The greatest commercial air tragedy of its day! from doney, which details the circumstances surrounding one of the most prolific aircraft accidents of all time-the June 1956 mid-air collisio ...

Qestion anti-trustprior to completing the assignment

Question: Anti-Trust Prior to completing the assignment, review Chapter 4 of your course text. You are a manager with 5 years of experience and need to write a report for senior management on how your firm can avoid the ...

Question how has the patient and affordable care act of

Question: How has the Patient and Affordable Care Act of 2010 (the "Health Care Reform Act") reshaped financial arrangements between hospitals, physicians, and other providers with Medicare making a single payment for al ...

Plate tectonicsthe learning objectives for chapter 2 and

Plate Tectonics The Learning Objectives for Chapter 2 and this web quest is to learn about and become familiar with: Plate Boundary Types Plate Boundary Interactions Plate Tectonic Map of the World Past Plate Movement an ...

Question critical case for billing amp codingcomplete the

Question: Critical Case for Billing & Coding Complete the Critical Case for Billing & Coding simulation within the LearnScape platform. You will need to create a single Microsoft Word file and save it to your computer. A ...

Review the cba provided in the resources section between

Review the CBA provided in the resources section between the Trustees of Columbia University and Local 2110 International Union of Technical, Office, and Professional Workers. Describe how this is similar to a "contract" ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As