OPTION 1

You are the Project Manager for the refurbishment of an 8-storey tower block of offices at an educational institution (see photo of external elevation). The project scope comprises three major components:
A. Section A: Upgrading (i.e. replacement) of the two lifts.

B. Section B: Refurbishment of staff offices to the existing floors (new decoration, lighting, ventilation systems, fixtures and fittings, furniture).
C. Section C: Replacement of all the windows with double glazing system.

Each floor comprises 15 offices for academic and administrative staff (see floor plan). Typically staff currently have their own office (i.e. 1 member of staff to each office). The floor plan for each floor is similar.

Work is to be scheduled so as to minimise disruption to staff working in the offices as far as possible. The scope of the works includes decanting of staff from their offices into refurbished offices as the works progress. Alternative space in limited. Staff can share an office if necessary (2 staff to an office) during the refurbishment works.

674_Figure.jpg

Figure 2: Typical Floor Plan

Section B works may overlap with Section A, but completion of Section B is not necessary until approximately 3 months after Section A. Section C may be undertaken concurrently with Sections A and B as appropriate.

Ignore the ground floor / entrance area (assume these areas have previously been refurbished). Access can be gained via the rear of the building.

The budget is $10m (split between the 3 Parts).

Required:-

1. Create a Work Breakdown Structure (WBS) for the project. As a guide the WBS should contain between 60 and 75 activities. Do not exceed 80 task-level activities. Present the WBS in a hierarchical structure diagram.

2. Create a schedule for the project. Determine the overall duration and when activities and events are planned to happen. The schedule is to include activities and their logical dependencies, with estimations of activity durations. Use the summary tasks, tasks and sub-tasks from the WBS for your schedule activities. Use Critical Path Scheduling techniques for the preparation of your project schedule. The start date for the project is the first working Monday after your Birthday this year. Adopt NZ industry standard holidays (Christmas, Easter, ANZAC day etc). Present your schedule as a Gantt Chart, using suitable scales. Use MS Project planning software and upload a soft copy of your MS Project file onto Canvas. Clearly identify the critical path(s).

3. When construction of Part A is 50% complete according to the original time line (i.e. half the original time estimated for completion), unexpected design errors result in the need for strengthening of the existing structure. The cost of the re-work is estimated to be $1.5m and the associated delay to completion of Part A is estimated at 6 weeks. In addition, progress on site has been slow, and you are running 2 weeks behind on your planned programme. As a result the client has asked you, (the Project Manager), to attend a crisis meeting. Using the elements from 1-2 above, along with any other project control measures you are familiar with, develop a progress report for the client. Indicate the likely delays and revised finish date for the project, based on critical path analysis.

Develop your recommendations for:

a. Options on how to achieve the original planned completion dates for all 3 Parts. Clearly indicate the implications for accelerating the works.

b. Options on how to achieve the original project budget. Clearly indicate the implications upon scope and upon planned completion dates.

The client is open to suggestions on changes of scope, time and cost, but not prepared to relax the quality aspects of the project. Note that you should use MS Project to help answer this part of the assignment and use the outputs from the software to demonstrate implications and options, however a soft copy of your MS Project file is NOT required.

4. Comment on the benefits and limitations of critical path scheduling techniques. Identify and describe an alternative scheduling technique for management of time that might address some of the limitations of the critical path approach. Guide 1000-1500 words.

OPTION 2

Identify a major project of your own choice. This may be from any engineering or business disciple. Prepare a project scenario of your own type of project (e.g. software development, capital equipment development, etc), which your are sufficiently comfortable with. Once again, you are the Project Manager for the identified project scenario. Identify three major components for the project scope (similar to the split between Part A, B and C for Option 1).

Required:-

1. Create a Work Breakdown Structure (WBS) for the project. As a guide the WBS should contain between 60 and 75 activities. Do not exceed 80 task-level activities.

2. Create a schedule for the project. Determine the overall duration and when activities and events are planned to happen. The schedule is to include activities and their logical dependencies, with estimations of activity durations. Use the summary tasks, tasks and sub-tasks from the WBS for your schedule activities. Use Critical Path Scheduling techniques for the preparation of your project schedule. The start date for the project is the first working Monday after your Birthday this year. Adopt NZ industry standard holidays (Christmas, Easter, ANZAC day etc). Present your schedule as a Gantt Chart, using suitable scales. Use MS Project planning software and upload a soft copy of your MS Project file onto Canvas. Clearly identify the critical path(s). (20 marks)

3. When implementation is 50% complete according to the original time line (i.e. half the original time estimated for completion), unexpected risks result in the need for re-work to one of the major components of the project. The cost of the re-work is estimated to be 10% of the total project budget and the associated delay to the project completion date is estimated at 10% of the project duration. In addition, progress on the project has been slow, and you are running behind on your planned programme. As a result the client has asked you, (the Project Manager), to attend a crisis meeting. Using the elements from 1- 2 above, along with any other project control measures you are familiar with, develop a progress report the client. Indicate the likely delays and revised finish date for the project based on critical path analysis. Develop your recommendations for:

a. Options on how to achieve the original planned completion dates for all 3 Parts. Clearly indicate the implications for accelerating parts of the works with associated "crash costs".

b. Options on how to achieve the original total budget. Clearly indicate the implications upon scope and upon planned completion dates.

The client is open to suggestions on changes of scope, time and cost, but not prepared to relax the quality aspects of the project. Note that you should use MS Project to help answer this part of the assignment and use the outputs from the software to demonstrate implications and options, however a soft copy of your MS Project file is NOT required. (10 marks)

4. Comment on the benefits and limitations of critical path scheduling techniques. Identify and describe an alternative scheduling technique for management of time that might address some of the limitations of the critical path approach. Guide 1000-1500 words.

Homework Help/Study Tips, Others

  • Category:- Homework Help/Study Tips
  • Reference No.:- M92262677
  • Price:- $40

Priced at Now at $40, Verified Solution

Have any Question?


Related Questions in Homework Help/Study Tips

Review the website airmail service from the smithsonian

Review the website Airmail Service from the Smithsonian National Postal Museum that is dedicated to the history of the U.S. Air Mail Service. Go to the Airmail in America link and explore the additional tabs along the le ...

Read the article frank whittle and the race for the jet

Read the article Frank Whittle and the Race for the Jet from "Historynet" describing the historical influences of Sir Frank Whittle and his early work contributions to jet engine technologies. Prepare a presentation high ...

Overviewnow that we have had an introduction to the context

Overview Now that we have had an introduction to the context of Jesus' life and an overview of the Biblical gospels, we are now ready to take a look at the earliest gospel written about Jesus - the Gospel of Mark. In thi ...

Fitness projectstudents will design and implement a six

Fitness Project Students will design and implement a six week long fitness program for a family member, friend or co-worker. The fitness program will be based on concepts discussed in class. Students will provide justifi ...

Read grand canyon collision - the greatest commercial air

Read Grand Canyon Collision - The greatest commercial air tragedy of its day! from doney, which details the circumstances surrounding one of the most prolific aircraft accidents of all time-the June 1956 mid-air collisio ...

Qestion anti-trustprior to completing the assignment

Question: Anti-Trust Prior to completing the assignment, review Chapter 4 of your course text. You are a manager with 5 years of experience and need to write a report for senior management on how your firm can avoid the ...

Question how has the patient and affordable care act of

Question: How has the Patient and Affordable Care Act of 2010 (the "Health Care Reform Act") reshaped financial arrangements between hospitals, physicians, and other providers with Medicare making a single payment for al ...

Plate tectonicsthe learning objectives for chapter 2 and

Plate Tectonics The Learning Objectives for Chapter 2 and this web quest is to learn about and become familiar with: Plate Boundary Types Plate Boundary Interactions Plate Tectonic Map of the World Past Plate Movement an ...

Question critical case for billing amp codingcomplete the

Question: Critical Case for Billing & Coding Complete the Critical Case for Billing & Coding simulation within the LearnScape platform. You will need to create a single Microsoft Word file and save it to your computer. A ...

Review the cba provided in the resources section between

Review the CBA provided in the resources section between the Trustees of Columbia University and Local 2110 International Union of Technical, Office, and Professional Workers. Describe how this is similar to a "contract" ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As