Q. An assembly line with 17 tasks is to be balanced. Longest task is 2.4 minutes; also total time for all tasks is 18 minutes. Line will operate for 450 minutes per day.
1. Illustrate what is minimum number of workstation needed if maximum output rate is to be sought?
2. Illustrate what range of output is theoretically possible for line?