JOHNSTON PRODUCTS

No matter how many times Justin Wang, the master scheduler for Johnston Products, tried, he couldn't seem to get it through people's minds. They kept trying to "front load" the production schedule, and the problem appeared to be getting worse. By "front loading" Justin meant that production supervisors would attempt to catch up with production they failed to make the previous week. It seemed to happen every week, and the only way Justin could get things back to a realistic position was to completely reconstruct the entire master schedule-usually about every three weeks.

Last month could serve as an example. The first week of the month Justin had scheduled production equal to 320 standard hours in the assembly area. The assembly area managed to complete only 291 hours that week because of some equipment maintenance and a few unexpected part shortages. The assembly supervisor then had the workers complete the remaining 29 hours from week 1 at the start of week 2.

Since week 2 already had 330 standard hours scheduled, the additional 29 hours really put them in a position of attempting to complete 359 hours. The workers actually completed 302 hours in week 2, leaving 57 hours to front load into week 3, and so forth. Usually by the time Justin came to his three-week review of the master schedule, it was not uncommon for the assembly area to be more than 100 standard hours behind schedule.

Clearly something needed to be done. Justin decided to review some of the areas that could be causing the problem:

1. Job standards-Although it had been at least four years since any job standards had been reviewed or changed, Jason felt the standards could not be the problem- quite the opposite. His operations course had taught him about the concept of the learning curve, implying that if anything the standards should be too large, allowing the average worker to complete even more production than implied by the job standard.

2. Utilization-The general manager was very insistent on high utilization of the area. He felt that it would help control costs, and consequently used utilization as a major performance measure for the assembly area. The problem was that customer service was also extremely important. With the problems Justin was having with the master schedule, it was difficult to promise order delivery accurately, and equally difficult to deliver the product on time once the order promise was made.

3. The workers-In an effort to control costs, the hourly wage for the workers was not very high. This caused a turnover in the workforce of almost 70% per year.

In spite of this, the facility was located in an area where replacement workers were fairly easy to hire. They were assigned to the production area after they had a minimum of one week's worth of training on the equipment. In the meantime, the company filled vacant positions with temporary workers brought in by a local temporary employment service.

4. Engineering changes-The design of virtually all the products was changing, with the average product changing some aspect of the design about every two months. Usually this resulted in an improvement to the products, however, so Justin quickly dismissed the changes as a problem. There were also some engineering changes on the equipment, but in general little in the way of process change had been made. The setup time for a batch of a specific design had remained at about 15 minutes. That forced a batch size of about from 50 to 300 units, depending on the design. The equipment was getting rather old, however, forcing regular maintenance as well as causing an occasional breakdown. Each piece of equipment generally required about three hours of maintenance per week.

Since the computer had done most of his calculations in the past, Justin decided to check to see if the computer was the source of the problem. He gathered information to conduct a manual calculation on a week when there were eight people assigned to the assembly area (one person for each of eight machines) for one shift per day. With no overtime, that would allow 320 hours of production.

Standard Assembly Time
Product Batch Size (minutes per item)
A174 50 17
G820 100 9
H221 50 19.5
B327 200 11.7
C803 100 21.2
P932 300 14.1
F732 200 15.8
J513 150 17.3
L683 150 12.8

Case Analysis

1. With this information, Justin calculated the total standard time required to be within the 320 hours available. Is he correct? Calculate the time required and check the accuracy of his calculation.

2. List the areas you think are causing trouble in this facility.

3. Develop a plan to deal with the situation and try to get the production schedule back under control under the constraints listed.

Marketing Management, Management Studies

  • Category:- Marketing Management
  • Reference No.:- M91727556
  • Price:- $40

Priced at Now at $40, Verified Solution

Have any Question?


Related Questions in Marketing Management

Question for case assignment please address the following

Question: For case assignment, please address the following questions: 1. Problem Statement: What is the key marketing management problem/opportunity the decision-maker faces in the case study? Don't confuse symptoms wit ...

Question in your marketing plan you should1establish a

Question: In your Marketing Plan, you should: 1. Establish a Mission Statement and a Vision Statement for your new organization. 2. Briefly describe basic services it has been providing during the first six months of ope ...

Assessment 1 - projectthis assessment consists of 3 parts

ASSESSMENT 1 - PROJECT This assessment consists of 3 parts, Part A, B and C. Part A: You are required to choose a product or service; research the existing market environment; and develop a marketing strategy for your ch ...

Question continue to use the two spanish-speaking countries

Question: Continue to use the two Spanish-speaking countries you have selected. Spain & Mexico Compare and contrast one of the following topics: • The cuisine of the previously selected countries • OR • The health care a ...

Assignment -after your visits to your chosen retailer you

Assignment - After your visits to your chosen retailer you are asked to write a critical review either of that retailers strategies or you may choose to CRITICALLY examine the marketing strategy of ONE of the other retai ...

Question discuss the role of demographics in relationship

Question: Discuss the role of demographics in relationship to integrated marketing communications. The response must be typed, single spaced, must be in times new roman font (size 12) and must follow the APA format. Inst ...

Question digital storytelling is a popular phrase and

Question: Digital storytelling is a popular phrase and component of IMC right now. At the root of PR 101 is storytelling. That is, how do you make your product or person or organization which you are pitching to reporter ...

Quesiton business ideas for nurse practitioner

Quesiton: Business Ideas for Nurse Practitioner Entrepreneurs Presentation Nurse practitioners can practice in many locations and can be a clinical practice as well as a consulting business, educational business. Read th ...

Question case analysis the cases provide an opportunity to

Question: Case Analysis: The cases provide an opportunity to examine concepts in greater detail and develop problem solving and decision making skills. Students are expected to read and analyze each case, develop and sub ...

Question this week were going to get inside the head of a

Question: This week we're going to get inside the head of a customer (meaning all of you and me and everyone else), because this is what marketers need to do to get their message heard and to drive customers to do what t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As