Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

JIT/Lean: Production Smoothing (heijunka), Kanban, and misc. issues:

a. Toyota Georgetown (a.k.a. Toyota Motor Manufacturing, Kentucky or simply TMMK) has two mixedmodel production lines each producing over two eight-hour shifts per day (with 480 minutes of working time per shift per production line), for five days per week. The models produced at TMMK include Camry (C), Avalon (A), and Venza (V). Suppose the weekly demand rates for Camry, Avalon, and Venza models are 7200 C, 600 A, and 1200 V, respectively. If the same mixed-model JIT scheduling (and TAKT time) is used in both production lines, calculate the TAKT time, in seconds, of the assembly line. How many units of each model will be produced before the production cycle is repeated? For one such production cycle, determine a satisfactory JIT production sequence of models.

b. Suppose one TMMK production line makes Camry (C) and Avalon (A), while the second TMMK line makes Camry (C) and Venza (V), with both lines operating for the same duration per day. Assuming both lines use the same TAKT time as in part II. a above, for each line, determine how many units of each model will be produced before the production cycle is repeated and specify a satisfactory JIT production sequence of models. Suppose there are twotypes of Camrys, CG and CH, representing gas-engine only and hybrid, respectively. About 1/6th (16.667%) of the Camrys are hybrid (CH), the rest are CG. Both lines produce CH and CG vehicles in a mixed-model mode. How does the presence of the two Camry models, affect the above JIT production sequences? [Specify the JIT production sequence for each line.]

c. Why are a relatively constant volume and stable mix essential to kanban & TPS?

d. Consider a Component X, one unit of which is used in every 5th Venza (e.g., X could be a Panoramic glass roof). The average lead-time (= wait time in queue + production time) for one container of Component X is one week. The container size for X is 20 units; so each time Component X’s kanban authorizes production 20 units of X are produced. A 16% minimum safety stock is desired to compensate for uncertainties; this means that the desired target inventory is at least 1.16 times the work-in-process inventory level computed using only the average data provided above (without uncertainties). Estimate the number of kanban cards required for Component X.

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M92032871

Have any Question?


Related Questions in Operation Management

1 identify countries that are primarily high and primarily

1. Identify countries that are primarily high and primarily low context communicators? 2. Describe the three international corporate-level strategies 3. Contrast and compare characteristics of High/Low Context Communicat ...

A manufacturing company has a pool of 50 labor hours a

A manufacturing company has a pool of 50 labor hours. A customer has requested two products, Product A and Product B, and has requested 15 and 20 of each respectively. It requires 2 hours of labor to produce Product A an ...

Perform research on a real project and answer the

Perform Research on a Real Project and Answer the Following: -Please state a brief summary of the Project. -Conduct a Formative Evaluation of the Project. -Conduct a Summary Evaluation of the Project. -What is the Commun ...

Answer the following question complete the following for

Answer the following Question : Complete the following for this assignment: 1) Define entrepreneurship, and cite your definition. Explain how entrepreneurs are likely to face extreme situations while working on their ven ...

Write a report discussing the effect of implementing lean

Write a report discussing the effect of implementing Lean Operations on performance. This assessment should be written and structured in the form of a business report. An analysis of the topic regarding their contributio ...

Chapter 1explain fully superior customer value and

Chapter 1 Explain fully superior customer value and synergies. Explain fully corporate strategy and all the components of corporate strategy. Explain fully strategic business unit. Explain fully market segmentation and m ...

Explain and discuss how a major hurricane like irma may

Explain and discuss how a major hurricane like Irma may affect McDonald’s environmental, social and economic (triple bottom) sustainability practices What are these practices? Discuss the effects of Irma with respect to ...

Management question1 identify the five forces that underlie

Management Question 1. Identify the five forces that underlie Porter’s five forces model of competition. 2. Analyse the industry structure of the public transport industry in Hong Kong and assess its attractiveness with ...

1 you are in the process of developing an approximation of

1. You are in the process of developing an approximation of the costs of the resources needed to complete each schedule activity. All of the following are tools/ techniques you can use in this process EXCEPT: 1) Cost agg ...

Leaders today must be able to create a compelling vision

Leaders today must be able to create a compelling vision for the organization. They also must be able to create an aligned strategy and then execute it. Visions have two parts, the envisioned future and the core values t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As