Q. 19 A 300 ft long roller conveyor, which operates at a velocity = 80 ft/min, is used to move pallets between load also unload stations. Each pallet carries 12 parts. Cycle time to load a pallet is 15 sec also one worker at load station is able to load pallets at rate of 4 per min. It takes 12 sec to unload at unload station. Determine (a) center-to-center distance between pallets, (b) number of pallets on conveyor at one time, also (c) hourly flow rate of parts. (d) By elucidate how much conveyor speed must be increased to increase flow rate by 3000 parts/hour.
Q. Illustrates what actors also forces in Levis stress also company micro also macro environment have affected its marketing position.