Q. You are expected to have the gift bags in Problem 14.1 ready at 5 p.m. Explain but you need to personalize the items (mono-grammed pens, note pads, literature from the printer, etc.). The lead time is 1 hour to assemble 200 Js once the other items are prepared. The other items will take a while as well. Given the volunteers you have, the other time estimates are item K (2 hrs), item L (1 hour) also item M (4 hrs). Develop a time-phased assembly plan to prepare the gift bags.