Linear Programming Model for Optimal Production schedule for Richard Manufacturing


Richland Manufacturing Company manufactures solid oak computer desks on two separate production lines at its plant in Richland, Vermont. Production line 1 is continuously operated and is staffed with workers experienced in the construction of quality oak furnishings. Production line 2 is activated only when demand is high and/or when large orders cannot be met by the capacity of line 1 alone in a timely manner. Production line 2 is staffed by less-experienced, but equally paid, workers temporarily transferred from other production tasks, on a weekly basis, from within the company. Each production period at Richland consists of one week for scheduling purposes. Line 1 can produce 5 desks per hour, while only 3 desks per hour can be produced on line 2. The operational costs for each line are the same, and each line will have 40 hours of production time available for any production period. If line 2 is not needed, and therefore not scheduled, the production time available for that week is zero. The production manager has reviewed the current orders for computer desks and has established the following goals, in order of importance, for the next production period:

Produce at least 350 desks.
Limit overtime on line 1 to a maximum of 10 hours.
Operate both lines for a minimum of 40 hours each if line 2 is needed.

The production manager also insists that in attempting to meet company objectives, the first goal is five times more important than the second, and that the second goal is twice as important as the third.

a. Formulate a linear programming model that can be used to determine the optimal production schedule that will best achieve the goals of Richland Manufacturing Company.

b. Determine the optimal production schedule for Richland Manufacturing Company using the Management Scientist software, including the quantity of the product produced, the hours of production utilized, and the levels of goal achievement.

Then describe if acheivement or failure is indicated.

Operation Research, Management Studies

  • Category:- Operation Research
  • Reference No.:- M924340

Have any Question? 

Related Questions in Operation Research

Q1 explain the scope of operations researchnbspq2 what are

Q1. Explain the Scope of Operations Research.  Q2. What are the Features of Operations Research? Q3. Explain the Monte Carlo Simulation. Q4. Explain the characteristics and constituents of a Queuing system. Q5. What do y ...

Use the following article on qualitative approaches written

Use the following article on qualitative approaches written by Kahlke (2014), to answer the following questions They note how in the development of qualitative research, three major methodologies are discussed most frequ ...

Advanced diploma of businessestablish amp maintain

Advanced Diploma of Business Establish & Maintain Strategic Networks Assessment Tasks 1: Description: Strategic networks could be a valuable source of information, expertise and competitive advantage for organisations, o ...

Q1 how easy do you find it to contact usq2 how do you rate

Q1. How easy do you find it to contact us? Q2. How do you rate availability of the following services from ESD? Use the following rating: 1 -> Poor 2 -> Average 3 -> Good 4 -> Very Good 5 -> Excellent f) Pest Control & F ...

Regression line drawn as yc1075x when x was 2 and y was 239

Regression line drawn as Y=C+1075x, when x was 2, and y was 239, given that y intercept was 11. calculate the residual

Prepare a report on the impact of purchasing strategies on

Prepare a report on "The impact of Purchasing Strategies on Performance of Organization's Performance: A Case of Construction Industry in Australia" Couple of contents in the table is explained below, like what you have ...

Operations research - projectintroduction1 the problems

Operations Research - Project Introduction 1. The problems should be formulated as Mixed Integer-Linear Programming problems and computational results obtained using AMPL where necessary. Do not try to use the in-built A ...

For the effective execution of intelligent transportation

For the effective execution of Intelligent Transportation System (ITS) and Information Technology (IT) advancements, the Transit Enterprise Architecture and Planning (TEAP) Framework venture has tried to furnish travel o ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

A cola-dispensing machine is set to dispense 9 ounces of

A cola-dispensing machine is set to dispense 9 ounces of cola per cup, with a standard deviation of 1.0 ounce. The manuf

What is marketingbullwhat is marketing think back to your

What is Marketing? • "What is marketing"? Think back to your impressions before you started this class versus how you

Question -your client david smith runs a small it

QUESTION - Your client, David Smith runs a small IT consulting business specialising in computer software and techno

Inspection of a random sample of 22 aircraft showed that 15

Inspection of a random sample of 22 aircraft showed that 15 needed repairs to fix a wiring problem that might compromise

Effective hrmquestionhow can an effective hrm system help

Effective HRM Question How can an effective HRM system help facilitate the achievement of an organization's strate