Step-by-step answer to Linear Programming Model

The Eastside Manufacturing Company produces four different aircraft components from fabricated sheet metal for several major aircraft companies. The manufacturing process consists of four operations - stamping, assembly, finishing, and packaging. The processing time per unit for each of the operations and total available hours per year to produce these components are given below.

Operation Component (hr/unit)
1 2 3 4 Total Hours per Year
Stamping 0.06 0.17 0.10 0.14 700
Assembly 0.18 0.20 -- 0.14 700
Finishing 0.07 0.20 0.08 0.12 800
Packaging 0.09 0.12 0.07 0.15 600
The sheet metal required for each component, the estimated annual demand, and the profit contribution provided by each component, are as follows:

Component Sheet Metal
(ft2) Estimated Annual Demand Profit Contribution
$
1 2.6 2,600 90
2 1.4 1,800 100
3 2.5 4,100 80
4 3.2 1,200 120

The company has 15,000 square feet of fabricated metal delivered each month. The company has the following prioritized production goals for these components:

? Avoid the use of overtime given the low profit margins.
? Meet all component demand.
? Achieve an annual profit contribution of at least $700,000
? Avoid additional material orders - pricing is dependent upon annual contracts with fixed amounts and delivery schedules

a. Formulate a linear programming model to determine the quantity of each component to produce to achieve the company's goals.

Answer:The decision variables are: x1 the quantity of the component 1 produced and sold
x2 the quantity of the component 2 produced and sold
x3 the quantity of the component 3 produced and sold
x4 the quantity of the component 4 produced and sold
First we prepare the entire program as a linear program
The objective function without any goal achievement requirement is maximization of profit
The profit as an objective function is 90x1 + 100x2 + 80x3 + 120x4 Eq(1)
The operation time availability constraints for each operation is as given below
0.06x1 + 0.17x2 + 0.10x3 + 0.14x4 <= 700 Eq(2) Stamping operation
0.18x1 + 0.20x2 + 0.14x4 <= 700 Eq(3) Assembly operation
0.07x1 + 0.20x2 + 0.08x3 + 0.12x4 <= 800 Eq(4) Finishing operation
0.09x1 + 0.12x2 + 0.07x3 + 0.15x4 <= 600 Eq(5) Packaging operation
The sheet metal availability constraint is
2.6x1 + 1.4x2 + 2.5x3 + 3.2x4 <= 15000 Eq(6) Sheet metal availability
Annual demand requirement is
x1 >= 2600 Eq(7) Component 1
x2 >= 1800 Eq(8) Component 2
x3 >= 4100 Eq(9) Component 3
x4 >= 1200 Eq(10) Component 4
Now we prepare goal program considering each of the goals in the order of the priority. Each goal is given priority order based on importance.
P1: Avoid the use of overtime given the low profit margins
Let us define the deviation variables for this goal. There are four constraints for operations hours, one each for each department. Let us say d1+ and d1- be the deviation variables for the amount by which the total operations hours exceeds and is less than the target value of 700 for stamping operation. Similarly the deviation variables for other constraints for operations time are written
The goal equation for stamping operation is
0.06x1 + 0.17x2 + 0.10x3 + 0.14x4 - d1+ + d1- = 700
The goal equation for assembly operation is
0.18x1 + 0.20x2 + 0.14x4 - d2+ + d2- = 700
The goal equation for finishing operation is
0.07x1 + 0.20x2 + 0.08x3 + 0.12x4 - d3+ + d3- = 800
The goal equation for packaging operation is

0.09x1 + 0.12x2 + 0.07x3 + 0.15x4 - d4+ + d4- = 600
Next flexible constraint is raw material availability, as we have to avoid additional orders. Let us say d5+ and d5- be the deviation variables when raw material required exceeds or less than the target value of 15000. The goal equation for this constraint is
2.6x1 + 1.4x2 + 2.5x3 + 3.2x4 - d5+ + d5- = 15000
Note that we have to avoid overtime and hence all the exceed deviation variables needs to be minimized. The linear program P1 at priority level 1 is
Minimize: d1+ + d2+ + d3+ + d4+
Subject to
x1 >= 2600
x2 >= 1800
x3 >= 4100
x4 >= 1200

90x1 + 100x2 + 80x3 + 120x4 >= 700000

2.6x1 + 1.4x2 + 2.5x3 + 3.2x4 - d5+ + d5- = 15000
All the variables including the deviation variables and decision variables are non-negative
We solve the above linear program and obtain optimal solution. The values of the deviation variables in the objective function are noted down. In the next level program the values of the deviation variables in the above are included as hard constraints.
P2: Avoid additional material orders
The objective is to minimize the over usage of the materials and hence we have
Minimize: d5+

Subject to
x1 >= 2600
x2 >= 1800
x3 >= 4100
x4 >= 1200

90x1 + 100x2 + 80x3 + 120x4 >= 700000
d1+ = optimal value in P1
d2+ = optimal value in P1
d3+ = optimal value in P1
d4+ = optimal value in P1
The non-negativity condition.

b. Determine the solution that will best achieve the company's goals in component production, including the quantity of each component produced, the annual profit contribution attained, and the levels of goal achievement.

Answer: Copy-paste the P1 in any solver package and obtain value of deviation variables as mentioned above. Include the optimal values of the deviation variables in P1 as hard constraints in O2 and again solve. The solution obtained in P2 is optimal considering the goals.

c. Determine how the solution would be affected if the first two goal priorities were reversed.

Answer: In this case P2 becomes P1 without any constraints on d1+, d2+, d3+, and d4+. Solve it and obtain optimal value at d5+. Use this value as constraint in next level problem where d1+, d2+, d3+, and d4+ becomes decision variables.

Operation Research, Management Studies

  • Category:- Operation Research
  • Reference No.:- M924886

Have any Question? 


Related Questions in Operation Research

For the effective execution of intelligent transportation

For the effective execution of Intelligent Transportation System (ITS) and Information Technology (IT) advancements, the Transit Enterprise Architecture and Planning (TEAP) Framework venture has tried to furnish travel o ...

Regression line drawn as yc1075x when x was 2 and y was 239

Regression line drawn as Y=C+1075x, when x was 2, and y was 239, given that y intercept was 11. calculate the residual

Use the following article on qualitative approaches written

Use the following article on qualitative approaches written by Kahlke (2014), to answer the following questions They note how in the development of qualitative research, three major methodologies are discussed most frequ ...

Q1 how easy do you find it to contact usq2 how do you rate

Q1. How easy do you find it to contact us? Q2. How do you rate availability of the following services from ESD? Use the following rating: 1 -> Poor 2 -> Average 3 -> Good 4 -> Very Good 5 -> Excellent f) Pest Control & F ...

Prepare a report on the impact of purchasing strategies on

Prepare a report on "The impact of Purchasing Strategies on Performance of Organization's Performance: A Case of Construction Industry in Australia" Couple of contents in the table is explained below, like what you have ...

Advanced diploma of businessestablish amp maintain

Advanced Diploma of Business Establish & Maintain Strategic Networks Assessment Tasks 1: Description: Strategic networks could be a valuable source of information, expertise and competitive advantage for organisations, o ...

Operations research - projectintroduction1 the problems

Operations Research - Project Introduction 1. The problems should be formulated as Mixed Integer-Linear Programming problems and computational results obtained using AMPL where necessary. Do not try to use the in-built A ...

Q1 explain the scope of operations researchnbspq2 what are

Q1. Explain the Scope of Operations Research.  Q2. What are the Features of Operations Research? Q3. Explain the Monte Carlo Simulation. Q4. Explain the characteristics and constituents of a Queuing system. Q5. What do y ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

A cola-dispensing machine is set to dispense 9 ounces of

A cola-dispensing machine is set to dispense 9 ounces of cola per cup, with a standard deviation of 1.0 ounce. The manuf

What is marketingbullwhat is marketing think back to your

What is Marketing? • "What is marketing"? Think back to your impressions before you started this class versus how you

Question -your client david smith runs a small it

QUESTION - Your client, David Smith runs a small IT consulting business specialising in computer software and techno

Inspection of a random sample of 22 aircraft showed that 15

Inspection of a random sample of 22 aircraft showed that 15 needed repairs to fix a wiring problem that might compromise