Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

Decision Tree: EDC, Inc.\

East Digital Centrum, Incorporated (EDC) is considering the development and launch of a new wireless data network product that will comply with a new high-bandwidth standard. The launch is scheduled for two years from now, which is also about the time when EDC predicts its competitors will be ready to launch competing products.

Product development costs are estimated at $5 million. (All the numbers in this problem are given in present value, so no need to discount.) The development (i.e., the design and prototype) can be completed within one year from now.

However, EDC is unsure of whether its engineering department will come up with a superior design, i.e., a “winning product” that is appealing to consumers and that technically outshines the competition. One year from now, all companies that plan to enter this market will have to demonstrate their products at the industry’s trade fairs. At that time, judging by the reaction of industry analysts and by comparing its product to those shown by the competition, EDC will be able to assess whether it has a winning product. EDC estimates the probability that its product will indeed be a superior design at 30%.

There is also a significant uncertainty about the size of the market for high-bandwidth wireless data networks. For simplicity, EDC is modeling this uncertainty as two scenarios, “large market” and “small market,” with probabilities 60% and 40%, respectively. This uncertainty will only be resolved after the product is launched two year from now. The estimated present value of the profit contribution from the product over its life-cycle in each of the four scenarios is given in the table below, in million USD

                             Large market (P=0.6)         Small market (P=0.4)

Superior design (P=0.3)      100                             30

Non-superior design (P=0.7) 10                             -10

To calculate the net profit in each scenario, the cost of development and the cost of construction of the production facility must be subtracted from the amounts given in the table. Current planning requires that the construction of the production facility start immediately, even though the product is still in development. The construction of the facility represents an expenditure of $25 million within the next year.

a) Build a tree to evaluate the project (i.e., the development and launch of the new product). Find the expected value for the project.

Expected Value: _____________________ Find the risk profile for the project; that is, list all possible values of the project’s net profits and their corresponding probabilities. In particular, what is the probability of incurring no loss.

Pr(net profit >= 0): ______________________ (Show how you get this number) Would you recommend that EDC pursue the project as described above? Why or why not?

b) There is strong disagreement in EDC’s engineering department concerning the 30% probability of having a winning product. Harris Walters, EDC’s VP of Engineering, claims that it could be as high as 70%.

How does the value of the project and optimal decision obtained in Part a) vary as Pr(winning product) ranges from 0% to 100% (in an increment of 5%)? Use Excel’s Data Table function to answer this question.

Pr(winning product) needs to be higher than _________________ in order for EDC to pursue the project.

C). Charlie Lin, a summer intern at EDC, suggests that it may be worthwhile to delay the decision to construct the facility for one year, when the quality of the product will be known. Suppose that the facility can be ready at the same cost of $25 million if its construction is delayed for one year. (For simplicity, ignore the effects of discounting this number for an additional year and assume that the previous probability and profit assessments still hold.) Revise the tree you drew in Part a) to include the “delay construction decision” alternative. What is its expected value? (Hint: this is not value of information, but you may want to recall how we draw the tree to calculate value of information.)

Expected value of the “delay construction decision” alternative: ___________________

In reality, there is going to be all sorts of costs associated with delaying the facility construction. What is the most EDC should be willing to pay – in terms of these additional costs – in order to secure with the contractor the option to delay building the production facility for one year?

Maximum EDC should pay in additional costs to secure the “delay construction decision” alternative: ___________________

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M92600349

Have any Question?


Related Questions in Operation Management

A farmer is producing grains and vegetables with a given

A farmer is producing Grains and Vegetables with a given set of input mix and water. The input mix includes fertilizer and labor in fixed ratios so they can be treated as one variable, with grains needing 5 units of inpu ...

Note the answers should be computerized - please do not

Note : the answers should be computerized - Please do not copy or paste from the net Case Study: Red Bull: A Different Kind of Integrated Campaign It’s a calm day in the desert town of Roswell, New Mexico. Thirteen miles ...

Case study questionsq1 what different strategies are

CASE STUDY QUESTIONS Q1. What different strategies are available to this firm? (Hint: More horizontal growth, Increase store sizes/activities etc. etc.) Give at least three other strategies Q2. What are the problems and ...

1 what is decision support systems i need quality quantity

1. What is Decision Support Systems ? I need quality, quantity and content about DSS 2. Explain the fear of why managers dread performance appraisals. What can be done to help prevent the fear? 3. Explain the continuum o ...

Hospitality human resources management1 what can be a

Hospitality Human Resources Management 1. What can be a reaction to problem solving or decision making in the workplace? How can a boss help you (not help you) work through a problem? How comfortable are you making decis ...

1 respond to the following statement compensation does not

1. Respond to the following statement: Compensation does not affect a company’s performance. Do you agree or disagree? What is the rationale for your perspective? 2. Do you believe Unions are still relevant today? Why or ...

1 discuss the relative use of nonverbal behaviors such as

1. Discuss the relative use of nonverbal behaviors, such as silent periods, interruptions, facial gazing, and touching, by people from various cultural backgrounds. How does this behavior affect the negotiation process i ...

Proposal for designing and developing an integrated is

Proposal for Designing and Developing an Integrated IS strategy for QTV (not an actual company ) at public tv station qtv the membership department currently keeps donation information on database which runs on their loc ...

Puffery refers to exaggerated claims of a products

Puffery refers to exaggerated claims of a product's superiority or the use of subjective or vague statements that may not be literally true. A company might advertise the "best system on the market" or claim that their p ...

An air-conditioning manufacturer produces room air

An air-conditioning manufacturer produces room air conditioners at plants in Houston, Phoenix, and Memphis. These are sent to regional distributors in Dallas, Atlanta, and Denver. The shipping costs vary, and the company ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As