Ask Homework Help/Study Tips Expert

Control charts are monitoring schemes, widely used in operations and manufacturing environments, to determine when a process is "in-control" and in the presence of only common-cause variation. Give an example of an application of control charts in an industrial, operations, or manufacturing setting that is different from those supplied in the overview. Discuss and share this information with your classmates.

In responding to your peers' posts, select responses that use a control chart that is different from your own. Is the process in control or out of control? Would the process be in control if Western Electric rules are considered? Explain your reasoning. Finally, consider how control charts can be applied to the final project case study.

Support your initial posts and response posts with scholarly sources cited in APA style.

1. Please Reply to the 2 post below - 1-2 paragraph:

Control chart, also known as a Shewhart chart is a time plot measure of quality utilized to identify causes of variation (Sharpe, et al, 2015).  In other words, a control chart enables data to be observed over time and leveraged for business action enabling quality improvement (Sharpe, et al, 2015).

An example of an application of control charts in a manufacturing setting would be if a car manufacturer wants to control the mean diameter of a car engine piston. An X-bar chart could be generated utilizing sample diameter measurements taken from car engine pistons being utilized for engine construction. The X-bar would plot the sample means in order to control the mean diameter of the car engine piston samples.  Variations such as common-cause variation could be identified. Common-cause variation is the result of random fluctuations in the manufacturing process (Sharpe, et al, 2015).  In the car engine piston scenario, common-cause variation could be a simple variation in sample diameter based on the engine piston manufacturing process.  Out of control or special-cause variation could also result from the manufacturing process if quality is concentrated in short-term focus.  The car manufacturer needs to make sure that a system is in place to address special-cause variation.  As Sharpe, et al, states (2015), a system of analysis needs to be in place for continuous quality control.

References: Sharpe, N. R., De Veaux, R. D., &Velleman, P., F. (2015). Business Statistics (3rd ed.). Upper Saddle River, NJ. Pearson Education.

REPLY -

Quality charts are a very useful tool in the industrial and production environments, since they can definitely help companies control waste and cost by keeping track of the specifications of the product being created, and ensuring that they are the proper measurements to meet their needs. Having products created on the line that are way out of spec introduce a lot of waste since the products will probably have to be thrown out or melted back down to start again.

Companies can find out the outliers in a data group by keeping measurements on an hourly basis on the specifications of a piston that is being produced on a production line. For instance, if a company knows that they can put out 100 pistons an hour from the output of a production line, they would try and measure 1 or 2 per hour and place the measurements into a spreadsheet or database, and see what kind of variation is taking place over a period of time. Are the greatest variations coming during the night shift? Day shift? Or is there some other trend that can be seen that can be illustrated? By knowing where the problem lies, it is much easier to try and fix the problem so that it doesn't happen again.

There are many types and approaches to using control charts, and each one has a specific use that can target a unique industry or production company. It is very important to be able to know just how closely the target specs are being kept in order to stay in business.

"The general approach to on-line quality control is straightforward: We simply extract samples of a certain size from the ongoing production process. We then produce line charts of the variability in those samples, and consider their closeness to target specifications. If a trend emerges in those lines, or if samples fall outside pre-specified limits, then we declare the process to be out of control and take action to find the cause of the problem." (UTA.edu, 2016, p.1)

UTA.edu. (2016). Quality Control Charts. Retrieved from http://www.uta.edu/faculty/sawasthi/Statistics/stquacon.html/

Attachment:- Assignment.rar

Homework Help/Study Tips, Others

  • Category:- Homework Help/Study Tips
  • Reference No.:- M92090671
  • Price:- $30

Priced at Now at $30, Verified Solution

Have any Question?


Related Questions in Homework Help/Study Tips

Review the website airmail service from the smithsonian

Review the website Airmail Service from the Smithsonian National Postal Museum that is dedicated to the history of the U.S. Air Mail Service. Go to the Airmail in America link and explore the additional tabs along the le ...

Read the article frank whittle and the race for the jet

Read the article Frank Whittle and the Race for the Jet from "Historynet" describing the historical influences of Sir Frank Whittle and his early work contributions to jet engine technologies. Prepare a presentation high ...

Overviewnow that we have had an introduction to the context

Overview Now that we have had an introduction to the context of Jesus' life and an overview of the Biblical gospels, we are now ready to take a look at the earliest gospel written about Jesus - the Gospel of Mark. In thi ...

Fitness projectstudents will design and implement a six

Fitness Project Students will design and implement a six week long fitness program for a family member, friend or co-worker. The fitness program will be based on concepts discussed in class. Students will provide justifi ...

Read grand canyon collision - the greatest commercial air

Read Grand Canyon Collision - The greatest commercial air tragedy of its day! from doney, which details the circumstances surrounding one of the most prolific aircraft accidents of all time-the June 1956 mid-air collisio ...

Qestion anti-trustprior to completing the assignment

Question: Anti-Trust Prior to completing the assignment, review Chapter 4 of your course text. You are a manager with 5 years of experience and need to write a report for senior management on how your firm can avoid the ...

Question how has the patient and affordable care act of

Question: How has the Patient and Affordable Care Act of 2010 (the "Health Care Reform Act") reshaped financial arrangements between hospitals, physicians, and other providers with Medicare making a single payment for al ...

Plate tectonicsthe learning objectives for chapter 2 and

Plate Tectonics The Learning Objectives for Chapter 2 and this web quest is to learn about and become familiar with: Plate Boundary Types Plate Boundary Interactions Plate Tectonic Map of the World Past Plate Movement an ...

Question critical case for billing amp codingcomplete the

Question: Critical Case for Billing & Coding Complete the Critical Case for Billing & Coding simulation within the LearnScape platform. You will need to create a single Microsoft Word file and save it to your computer. A ...

Review the cba provided in the resources section between

Review the CBA provided in the resources section between the Trustees of Columbia University and Local 2110 International Union of Technical, Office, and Professional Workers. Describe how this is similar to a "contract" ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As