Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

Brian Wilson, materials manager at B&L Inc. in Lancaster, Pennsylvania, was considering a proposal from his purchasing agent to outsource manufacturing for an outrigger bracket. It was the end of April and Mr. Wilson had to evaluate the proposal and make a decision regarding whether to proceed. B&L Inc. Manufactured trailers for highway transport trucks. The company comprised three divisions: the Trailer, Sandblast & Paint, and Metal Fabricating Divisions. Each division operated as a separate profit center, but manufacturing operations between each were highly integrated.

The Metal Fabricating Division produced most of the component parts of the trailers, the Trailer Division performed the assembly operations, and the Sandblast & Paint Division was responsible for completing the sandblasting and final painting operation. B&L manufactured approximately 40 trailers per year, with about two-thirds produced during the period from November to April. The outrigger bracket, part number T-178, was an accessory that could be used to secure oversized containers. The bracket consisted of four component parts welded together, and each trailer sold by B&L had 20 brackets per 10 per side. The Metal Fabricating Division was presently manufacturing the outrigger bracket. The subassembly parts are T-67, T-75, T-69, and T-77 were processed on a burn table, which cut the raw material to size. Although the burn table could work with eight stations, this machine had only been operating with one station. The final assembly operation, T-70, was performed at a manual welding station. Manufacturing lead time for the outrigger bracket was two weeks.

However, the Metal Fabricating Division had been able to coordinate supply and production with assembly operations. Consequently, finished inventory levels of the outrigger bracket were kept to a minimum. B&L's inventory holding costs were 20 percent per annum. In an effort to reduce costs, the purchasing agent, Alison Beals, who reported to Brian Wilson, solicited quotes from three local companies to supply the outrigger bracket. Mayes Steel Fabricators (Mayes), a current supplier to B&L for other components, offered the lowest bid, with a cost of $108.20, FOB B&L. Brian met with the controller, Mike Carr, who provided a breakdown of the manufacturing costs for the outrigger bracket. Looking at the spreadsheet, Mike commented: "These are based on estimates of our costs from this year budget. Looking at the material, labor, and overhead costs, I would estimate that the fixed costs for this part are in the area of about 20 percent. Keep in mind that it costs us about $75 to place an order with our vendors." Numbers below provides B&L's internal cost breakdown and details from the quote from Mayes.

Parts                       Mayes Steel Fabricators                     B&L Manufacturing Costs

T-67                                      $14.60                                               $17.92

T-75                                     $21.10                                               $17.92

T-69                                       $18.50                                               $45.20

T-77                                       $13.00                                               $10.37

T-70                                     $41.00                                                 $58.69

Total                                      $108.20                                              $150.10

Brian expected that B&L would have to arrange for extra storage space if he decided to outsource the outrigger bracket to Mayes, who had quoted delivery lead time of four weeks. Because Mayes was local and had a good track record, Brian didn"t expect the need to carry mush safety stock, but the order quantity issue still needed to be resolved. B&L was operating in a competitive environment and Brian had been asked by the division general manger to look for opportunities to reduce costs. As he sat down to review the information, Brian knew that he should make a decision quickly if it was possible to cut costs by outsourcing the outrigger bracket.

Question:

What is your recommendation for purchasing based on the Annual Manufacturing Cost and the annual savings from purchasing?

Calculations already known are as follows:

Annual Manufacturing Cost: $144,096

Outsourcing Cost: $86,560

Savings by Outsourcing: $57,536

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M91905216

Have any Question?


Related Questions in Operation Management

Instruction for this assignment please review the health

INSTRUCTION FOR THIS ASSIGNMENT : Please review the health systems of Turkish, Greman and the US and respond to the following questions. What argument would you make to your Governor to adopt some changes based on what y ...

Every year fortune magazine links to an external site links

Every year, Fortune Magazine (Links to an external site.) Links to an external site. honors the 100 best companies to work for. Get the latest list. Select one of these companies in the top 15 on the list to research (an ...

Quick short answers briefly explain reasoning1 making

Quick short answers. briefly explain reasoning. 1. Making decisions using IRR and payback analysis. 2. How to evaluate multiple alternatives with multiple futures? 3. What are cash flow diagrams? 4. What is break even an ...

Please limit your response to each question to two to three

Please limit your response to each question to two to three sentences. Conscise, thoughtful answers. Material is attached #1 Refer to page 34- 35 of the Burke text for the ways in which the Hawthorne Studies contributed ...

1 recognizing the difference between cooperation and

1. Recognizing the difference between cooperation and collaboration, explain where the team actually collaborated to produce the course project. 2. How did your experience with this Social Contract during virtual teamwor ...

Critics of the tobacco industry allege that in developing

Critics of the tobacco industry allege that in developing markets cigarette manufacturers create special tobacco blends that contain additives to give an extra "kick." If true, such practices put the "standardization-ver ...

The heart association plans t install a free blood pressure

The Heart Association plans t install a free blood pressure testing booth at the Palouse mall for a week. Previous experience indicates that, on average, 10 persons per hour request a test and the arrivals are Poisson di ...

1 utilize ahp in any part of your life requirements you

1. Utilize AHP in any part of your life. Requirements: You should have at least three criteria and at least three options. If you cannot find anything, compare the three laptops given in the product details attachment in ...

Since the internet was opened to the public in 1992 it has

Since the internet was opened to the public in 1992, it has gone from an obscure “nice to have” capability with 50 web sites to an absolute necessity for most businesses today. • Do you see this statement as true? Explai ...

1 discuss current issues that managers face when managing

1. Discuss current issues that managers face when managing teams. In your answer draw on the diverse characteristics of groups, the implications for managing global and virtual teams, and the circumstances when managers ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As