Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

ATCS provides training for future air traffic controllers. One of the skills air traffic controllers need is the ability to sequence aircraft for landing purposes. The controller decides who lands immediately and who goes into a holding pattern. The following data are provided to you, the student, to develop an acceptable landing sequence. Any sequence that results in an aicraft not being scheduled to land before it runs out of remaining flying time is unacceptable. The following aircraft are currently awaitng your decision as to their landing sequence,

Flight Number         Minutes on runway      Remaining Flying time (Minutes)          Cost per minute of flying time ($)

101                                      2.00                                        10                                  100

118                                      3.00                                       15                                   150

217                                     2.75                                         8                                    125

8076                                    1.50                                         5                                   80

219                                      3.50                                        12                                  200

894                                      1.75                                       19                                   150

024                                      2.50                                        16                                  400

616                                     3.25                                          22                                 300

There are many ways to sequence this group of aircraft waiting to land. Since cost is an obvious factor, consider a sequence that minimizes total cost to land the aircraft. Multiply the cost per minute of flying time by the remaining number of minutes. This give you the maximum cost associated with an airplane circling in a holding pattern until the last possible moment.

(a) Develop a landing sequence that gives priority to those aircraft with the highest cost of slack time (excess flying time multiplied by cost per minute of flying time). For example, flight 616's 18.75 minutes of slack time (22-3.25) times $300 per minute means that if Flight 616 does not land until its time is all used up, it incurs an extra flying cost of $5,625. Make a Gantt chart showing the landing sequence and evaluate the sequence in terms of performance. Calculate mean flow time, mean lateness, and average number of planes in the system,

(b) Develop a sequence using SPT as a priority rule. Make a Gantt chart showing the landing sequence and evaluate the sequence in terms of performance. Calculate mean flow time, mean lateness, and average number of planes in the system.

(c) Develop a third sequence using EDD (earliest due date) as a priority rule. The plane with the least amount of flying time remaining has the highest priority. Make a Gantt chart showing the landing sequence and evaluate the sequence in terms of performance. Calculate mean flow time, mean lateness, and average number of planes in the system. Calculate the total cost associated with this sequence (flow time multiplied by cost per minute of flying time for each flight).

(d) Try to develop an alternative sequence that lands all of the aircrafts safely and reduces the total cost.

PLEASE SHOW ALL WORK

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M93126058

Have any Question?


Related Questions in Operation Management

Visit the united states consumer product safety commission

Visit the United States Consumer Product Safety Commission (Links to an external site.)Links to an external site. website. Click on “Recalls.” Choose one product that has been recalled. Describe the product subject to re ...

1 what is a license explain the difference between a

1. What is a license? explain the difference between a commercial evaluation license and a patent commercialization license. 2. A project manager needed to shorten a project schedule and decided to employ crashing, a sch ...

A retailer needs to find out the best order size for the

A retailer needs to find out the best order size for the coming season. The retail price is $12 per unit of sold product. The ordering cost for each unit is $4. The savage value of each unsold product is $2. The retailer ...

1 what role has the feminist movement played in the

1) What role has the feminist movement played in the development of the victims' movement? Your response should be at least 500 words in length. Please cite and use APA reference. 2) Explain how the victims' movement beg ...

We took a look at organizational culture as usual everyone

We took a look at organizational culture. As usual, everyone contributed substantively to the discussion. I am really happy to see the good contributions and substantive posts. Discussion interaction is a large part of o ...

1 describe value chain for dominos pizza where to describe

1. Describe Value chain for Dominos pizza where to describe Demographic, Geographic, psychographic, behavioral, socialgraphic. 2. Discuss several creative problem-solving techniques and their merits 3. Discuss the import ...

Meetings cost money whythere are six 6 employees in a

Meetings cost money, why? There are six [6] employees in a healthcare morning meeting. Five [5] of the employees earn $45 per hour; and, one[1] employee earns $50 per hour. Calculate the direct cost of a one [1] hour mee ...

1 is pursuing this campaign a smart investment for droga 5

1. Is pursuing this campaign a smart investment for Droga 5 - and for the proposed partners Random House, Roc Nation, and Microsoft? 2. What would you advise as a solution to the conflict between Microsoft and Roc Nation ...

1 a private college prepares it statements under the fasb

1. A private college prepares it statements under the FASB standards, while the public college prepares its statements under the GASB standards. Can you identify any differences in the financial reports? 2. Choose an ind ...

Complete skill application ndash what do you say to

Complete Skill Application – What do you say to Craig? Craig is an excellent employee whose expertise and productivity have always met or exceeded your expectations. But recently he’s been making work difficult for other ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As