Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

Assignment

Directions:

1. This is an individual assignment, please do not discuss or correspond with others prior to the due date and time for the exam.

2. Show your work for part I, either hand written and scanned or typed up. (You may use a spreadsheet to verify your answers, but I don't want the answers in a spreadsheet - I want to see the calculations as they would unfold when done by hand.)

3. Answer parts II and III in essay format (Introduction, Body, Conclusion) using a word processor. (If you have hand drawn figures, scan them and insert them into your document.)

4. If you wish, complete the extra credit question. As requested with part I, show all of your work.

5. Turn in one document with all of your answers.

I. A small steel fabricator uses (among other supplies) plates of steel to manufacture prototypes for various small toy companies (think Tonka) and a wide variety of other items. All production planning is handled on a make to order basis - finished goods inventory is not held. The steel may be purchased in 12"x12" sheets that weigh 0.9792 pounds and have a cutting tolerance (along each side) of ± 0.25". Each such sheet of steel costs $8.00. The cost to order steel sheets is estimated to be $100 per order. The manufacturer works 50 weeks a year and the lead time for an order is 1 week. The annual cost to hold a square foot of steel is estimated to be 20% of the price. Annual demand for the steel is the equivalent of 5,000 12"x12" sheets. Assume a lead time service level of 75% is acceptable and the standard deviation of weekly demand is 50 sheets. (For parts a - c assume a fixed quantity model is used.)

a. What is the optimal order quantity?
b. What is the appropriate re-order point?
c. How long (in weeks) is the average order cycle?
d. If a fixed interval of ten weeks is used, what would be the stocking level and safety stock for a 75% service level.

II. Do not answer both A and B. Answer either option A or B.

A. Assume that you work in a supplier development role for a major clothing designer (such as one that recently made a big PR mistake by sourcing, from Chinese suppliers, clothing to be worn by US Olympic athletes in London). The company has decided that, regardless of past sourcing practices, there is a need for a company owned facility that will make prototypes of new designs in small volumes and be sufficiently scalable to make "uniforms" for the US Olympic teams in the US. You have been asked to establish this new facility. Describe your likely decisions in regard to:

a) Structural decisions (process choices, location, layout, capacity).

b) Infrastructural decisions (master scheduling approach, material planning, detailed scheduling and control, quality control, workforce management and supervision.)

Hint: Start with a clear statement regarding the Order Winning Criteria and Order Qualifying Criteria for this facility and based on this ensure that your decisions reflect consistency as would be expected from a well implemented and integrated operations strategy.

B. Using the terms quality, timeliness, low cost, and flexibility describe the competitive priorities (as you perceive them from public information and/or your personal impressions) of Rolex and Timex. How do you suspect operations management differs in the two firms' watchmaking businesses? Be sure to include both structural and infrastructural considerations in your answer.

III. Assume this is your first day as manager of a small - primarily custom - cabinet-making business. In your previous job, at a large auto assembly facility, the JIT system was used. Now, you arrive at your new job to discover that your predecessor erased all the computer files, account histories, records, manuals and other operating information relating to the business. All that remains is the machines, the employees, and your anxious customers. Prepare a recovery plan in which you:

a) Indicate why this is an infrastructural problem and not a structural problem.

b) Compare and contrast the planning and control systems used in simple and complex manufacturing environments. Use figures to illustrate the concepts and use all of the following terms in your essay: make to order, make to stock, push scheduling, Material Requirements Planning, batch process, local priority rules, pull scheduling, repetitive process, Kanban, job shop.

c) Describe the new system you plan to install and indicate why you have made this choice.

IV.

1) The sheet steel described in Part I (above) may also be purchased in 12"x24" sheets that weigh 1.9584 pounds and have a cutting tolerance (along the each side) of ± 0.25". These larger sheets cost $15.00. The company's equipment is no more effective and no less effective when using the larger sheets rather than the 12"x12" sheets. However, to reduce setups, if 12"x24" sheets are purchased they are routed to a secondary supplier where they are cut down to the 12"x12" size at a cost of $0.50 per cut. The secondary supplier has a minimum order of 1250 cuts. This approach, with an intermediate supplier, increases the lead time to two weeks. Assuming a fixed quantity model is used:

a. Does this second option result in a new optimal order quantity (or would you stick with the quantity from Part I)?
b. What is the new re-order point.
c. How much extra safety stock is required with this second supply approach?

2) A control study of the cutting operation of the intermediate supplier (described in part IV question 1, above) has demonstrated that it provides sheets with an average length of 11.87" and a standard deviation of .05". By contrast, sheets purchased from the original supplier (described in part I above) are found to average 11.970" with a standard deviation of 0.06". Sheets that do not meet specifications are sold as scrap for an average price of $0.05 per pound.

a. Determine Cp and Cpk for the original supplier (purchasing 12"x12").

b. Determine Cp and Cpk for the second supply approach (with the intermediate step).

c. How many 12"x12" sheets of steel would be lost to scrap with each approach to supply?

d. Including the recovered value from recycling, what would the loss due to defective sheets under each scenario?

e. Assume you have no ability to influence the practice of either supplier (i.e., this is simply transaction based and not relationship based). Which approach to purchasing would minimize total costs of inventory (including quality losses)?

f. Which supplier would you prefer? Why?

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M92787291

Have any Question?


Related Questions in Operation Management

Problem set problem 1 using the marginal approach suppose

PROBLEM SET Problem 1: Using the Marginal Approach Suppose your company runs a shuttle business of a hotel to and from the local airport. The costs for different customer loads are: 1 customer: $30 2 customers: $32 3 cus ...

1 why is it important to prepare a communication program to

1. Why is it important to prepare a communication program to promote the company strategy and to explain the risks? What is the purpose of the communication program? 2. Expenditures for health services continue to grow f ...

A and b are neighbors after numerous complaints by b

A and B are neighbors. After numerous complaints by B regarding A's dog, A erects a fence enclosing her property. The fence encroaches upon three feet of B's property and it can be proven that A knew of the encroachment ...

1 what are the different stages for entering into the

1. What are the different stages for entering into the foreign market? 2. If you are leading an organization, how would you configure the organization and what behaviors would you inspire and exhibit to promote quality i ...

1 in the integrated process under which of the following

1. In the integrated process, under which of the following conditions will the production process steps be suspended until the procurement process steps are complete? A. When a customer order is received B. When there ar ...

Freeport corporation finds that demand for surfboards has

Freeport Corporation finds that demand for surfboards has average demand of 27 units per day, with a standard deviation of 3 units. Lead time from the supplier averages 13 days, with a standard deviation of 2 days. The i ...

A manager must decide how many machines of a certain type

A manager must decide how many machines of a certain type to buy. The machines will be used to manufacture a new gear for which there is increased demand. The manager has narrowed the decision to two alternatives: buy on ...

What qualitative factors in special order decisionsbull

What Qualitative Factors in Special Order Decisions? • Will USR expect the same selling price per unit on future orders? • Will other regular customers be upset if they discover the lower selling price to one of their co ...

In august 1995 smith company smith entered into a lease

In August 1995, Smith Company ("Smith") entered into a lease with Jones Two, Inc. ("Jones"). By the terms of the lease, Jones leased a Washington D.C. property (the "Property") that was owned by Smith for a period of ten ...

When we began the course we took a moment to analyze our

When we began the course we took a moment to analyze our own ethical make up. Now, as we wrap up the course you will analyze your classmates' ethical make up. For your initial post, choose one of the ethical dilemmas tha ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As