Assignment: West Consulting Network Design Summary

West Consulting Business Description

West Consulting is a graphic design and printing company. It is growing in consumer and sales volume and therefore, is expanding its local campus in Houston, Texas and adding a test location in China.

Business Problem

As a graphics design and printing company, West Consultingruns bandwidth-intensive applications from servers housed at their headquarters in Houston, Texas. IT leadership has determined that the current network continuously runs in a degraded state and users experience heavy latency when accessing the servers that house their customer Computer Aided Design (CAD) software.

Due to increased sales of their CAD designs, they need to expand their facilities. The company headquarters currently has 1,000 unique users amongst their two buildings and has decided to add another building and 500 users.

In addition, leadershiphas decided to expand into China to enable them to test their designs in a new and growing market. The footprint in China will be relatively small; approximately 30 people.

Solution

You are a Network Consultant for West Consulting. You are tasked with proposing an improved network design to support their growth and expansion plans.

Requirements

1. A secure WLAN solution in the new building for half of the users and recommendations to upgrade their existing WLAN infrastructure to keep wiring costs down.

2. Recommendations on a Unified Communications system that meets traffic demands, with minimal interruptions, due to the frequency of international videoconferencing calls that will occur.

3. An IP solution that can accommodate the new users in all locations.

4. Recommendations to upgrade their switch bandwidth to 10GB fiber uplinks between backbone switches,a 10GB connection to each of the servers, and add-in options for redundancy. High availability access to these critical servers is a must because of the expected traffic increase and load on the servers.

5. Proposal for a data center solution that takes advantage of both network and server virtualization technologies to reduce their costs in acquiring and maintaining hardware.

6. Improvements to the link speed to the internet.

7. Options for implementing greater security for their Intranet servers that their partners and employees heavily use and for their overall network infrastructure, as they have had attacks on their DMZ.

8. Have proof thatthese improvementswill be completed within a 4- to 6-month timeline.

Network Configuration Details

The Network Engineer verbally shared the configuration details of their network, as follows:

Headquarters:

• Bldg. 1 and Bldg. 2 are located about 1000 ft. apart.

Switches:

• Bldg. 1 has one 6500 backbone switch installed; which supports users from both buildings.

• Bldg. 2 has a connection to the backbone switch via a 10GB fiber connection (10G Base LR) from uplink port on a Cisco 3850.

• To support the users, each floor contains three Cisco Catalyst 48-port 100Mbps Ethernet switches; which are each cabled to the backbone switch via a 1GB uplink port.

Routers:

• Each floor represents a different subnet and therefore one Cisco router 2610, configured with EIGRP, is cabled to backbone switch (1GB connection) to provide routing for each subnet and provides a WAN interface to the Internet via a T-1 link.

• Each switch also has a link to an access point that uses WPA encryption and 802.11b wireless standard to support users who are in conference/meeting rooms that want to connect to the internet.

Servers:

• 5x Windows Server 2012 R2 (RAID 5) application servers that support the CAD.
• 1 DHCP and FTP server

IP Configuration (DHCP-based)

Building

Floor

Servers

Clients

IP Network

1

1

5

100

194.100.1.0/24

 

2

 

100

194.100.2.0/24

 

3

 

100

194.100.3.0/24

 

4

 

100

194.100.4.0/24

 

5

 

100

194.100.5.0/24

2

1

5

100

195.100.1.0/24

 

2

 

100

195.100.2.0/24

 

3

 

100

195.100.3.0/24

 

4

 

100

195.100.4.0/24

 

5

 

100

195.100.5.0/24

Attachment:- Part-1-West-Consulting-Customer-Design-Summary.rar

Homework Help/Study Tips, Others

  • Category:- Homework Help/Study Tips
  • Reference No.:- M92664841

Have any Question?


Related Questions in Homework Help/Study Tips

Question one of the five elements of emotional intelligence

Question: One of the five elements of emotional intelligence is self-awareness. What behaviors would someone with strong self-awareness demonstrate within the context of leading and managing groups? Provide an example. T ...

Question some large coal-burning power plants are located

Question: Some large coal-burning power plants are located at the mouth of a mine and have been designed to burn coal specifically extracted from that mine. Others are at a distance from mines. Coal can reach them by rai ...

Question consider the different communities to which you

Question: Consider the different communities to which you belong: 1. What is the geopolitical community in you live? Why is it geopolitical? 2. What is a phenomenological community to which you belong? Why is it a phenom ...

Assessment 1 - taskbackground newaccess is a mental health

Assessment 1 - Task Background: NewAccess is a mental health intervention which initially targeted youth aged 17 to 25, and is in the process of being expanded to young people as young as 12, and also to Indigenous youth ...

Assignment descriptionproject scope a typical

Assignment Description Project Scope: A typical network layout diagram of a firm is given below for illustrative purposes only. The service requirements are enclosed. Figure. Network layout of a firm Service requirements ...

Assignmenta with the guidance from the content of slide 6

Assignment (a) With the guidance from the content of slide #6 on reading ; discuss the importance of DM in health care; (b) If decision environments in health care may include certain, risk or uncertain environments. Wha ...

Question conduct a web search on organizations that were

Question: Conduct a web search on organizations that were affected by Hurricane Katrina. Please select one business and cover the following: (a) Provide a background of the organization. (b) How was the organization impa ...

Question the acme auto insurance company is risk neutral

Question: The Acme Auto Insurance Company is risk neutral and seeks to offer insurance at its actuarially fair price. All drivers have the same initial income, $400, and if they are involved in an auto accident, their in ...

For this assignment you will write a two full pages essay

For this assignment, you will write a two full pages essay, addressing the issues below: 1. Explain how crime and mental illness are related from a legal standpoint. 2. Find three court cases which are related to mental ...

Question you have an idea to improve patient care that you

Question: You have an idea to improve patient care that you would like upper management to support and fund. What type of communication tool would you use to present your idea and why? The response must be typed, single ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As