Tucker Inc. manufactures high-quality suits and sport coats for men. Each suit needs 1.2 hours of cutting time and 0.7 hours saving time, utilizes 6 yards of material and gives the profit contribution of $190. Each sport coat needs 0.8 hours of cutting time and 0.6 hours saving time, uses 4 yards of material and gives the profit contribution of $150. For coming week,200 hours of cutting time, 180 hours saving time, and 1200 yards of fabric are available. Additional cutting and saving time can be obtained by scheduling overtime for this operations. Each hour of overtime for cutting operation increases hourly cost $15 and each hour of overtime for sewing operation increases hourly cost by $10. Maximum of 100 hours of overtime can be scheduled. Marketing requirement specify the minimum production of 100 suits and 75 sport coats.