A project to build a new bridge seems to be going very well since the project is well ahead of schedule and costs seem to be running very low. A major milestone has been reached where the first two activities have been totally completed and the third activity is 60 percent complete. The planners were only expecting to be 50 percent through the third activity at this time. The first activity involves prepping the site for the bridge. It was expected that this would cost $1,420,000 and it was done for only $1,300,000. The second activity was the pouring of concrete for the bridge. This was expected to cost $10,500,000 but was actually done for $9,000,000. The third and final activity is the actual construction of the bridge superstructure. This was expected to cost a total of $8,500,000. To date they have spent $5,000,000 on the superstructure.

Calculate the schedule variance, schedule performance index, and cost performance index for the project to date. (Negative values should be indicated by a minus sign. Do not round your intermediate calculations or "variance" values. Round your "performance index" values to 3 decimal places.)

Schedule variance $________

Schedule performance index ________

Cost performance index ________

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M92025352

Have any Question?


Related Questions in Operation Management

The friendly sausage factory fsf can produce hot dogs at a

The Friendly Sausage Factory (FSF) can produce hot dogs at a rate of 6,000 per day. FSF supplies hot dogs to local restaurants at a steady rate of 370 per day. The cost to prepare the equipment for producing hot dogs is ...

A dry cleaner has a single drive-thru window for customers

A dry cleaner has a single drive-thru window for customers. The arrival rate of cars follows a Poisson distribution, while the service time follows an exponential distribution. The average arrival rate is 16 per hour and ...

One-page memowhat you need to do to complete this

One-Page Memo What you need to do to complete this assignment: We are using the same case for both the Discussion Question and the one-page memo. Make sure to answer and review the DQs first before completing the followi ...

Robots everywhere corporation rec is a small industrial

Robots Everywhere Corporation (REC) is a small industrial equipment company located north of Boston. It was founded in 1990 by recent engineering graduates who had a dream of making robots a common household item. REC de ...

Answer the following questions with reference and

Answer the following questions with reference and citations: 1. To what extent has BMW repositioned the Mini? 2. Discuss the differences between product innovation and service innovation. 3. Discuss how some new services ...

What do you think about the differences that exist between

What do you think about the differences that exist between rights in the area of criminal legal representation versus those that exist in the realm of civil legal assistance? Does it seem fair to you? why or why not? Eve ...

1 do you have first-hand experience in an organization that

1. Do you have first-hand experience in an organization that was trying to change? Was it successful? Can you recognize the steps from Kotter model ? If there was resistance to change, why - which of the 3 sources of res ...

In order to be successful in business one must be able to

In order to be successful in business, one must be able to recoginize problems and solve them in order to succeed in the business arena. With that conveyed, Barbara Corcoran of the popular television program, "Shark Tank ...

Rays satellite emporium wishes to determine the best order

Ray's Satellite Emporium wishes to determine the best order size for its best-selling satellite dish (model TS111). Ray has estimated the annual demand for this model at 800 units. His cost to carry one unit is $120 per ...

Prepare a slide presentation layout for the board of

Prepare a slide presentation layout for the Board of Directors (BOD) outlining the negotiation plan for a new union contract. Describe the activities, applications, justification and benefits of implementing this contrac ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As