Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Operation Management Expert

1. The two different approaches to load work centers in job-shop scheduling are

load charts and schedule charts.

Gantt charts and assignment method.

infinite loading and finite loading.

linear programming and makespan.

None of the above

2. The priority rule where jobs are processed according to the smallest ratio of due date to processing time is

CR.

EEDD.

FCFS.

S/O.

SPT.

3. A scheduling rule used for sequencing jobs through two work centers is

the critical ratio rule.

the Johnson's rule.

the slack per operation rule.

the shortest processing time rule.

the Pareto rule.

4. The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:
Job Processing Time (hrs) Due (hrs from now)

W 4 4

X 3 5

Y 2 2

Z 1 1

If he uses the first-come, first-served (FCFS) priority rule to schedule these jobs, what will be the average completion time?

7.5 hours

5 hours

3 hours

2.5 hours

2 hours

5. The ultimate goal of JIT operations is to have

no in-process inventories.

cross-trained workers capable of handling every process.

a smooth, rapid flow of materials through the system.

no setup times.

All of the above

6. Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of delayed differentiation.

kanban.

autonomation.

andon.

matrix management.

7. A kanban card is used to signal that

work is needed at the work center.

work is ready to be moved to the next station.

a worker has run out of parts needed for further processing.

a machine has broken down and needs immediate attention.

a machine is ready for preventive maintenance.

8. The type of processing system that is used for highly standardized products is

continuous.

intermittent.

project.

batch.

unit.

1. The priority rule, which will sequence jobs in the order they are received, is _____.

EDD

LIFO

SPT

CR

FCFS

2. In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse?

0 hours

1 hour

2 hours

3 hours

4 hours

3. A major difference between manufacturing and service systems in terms of scheduling is

variability in arrival and service rates.

processing cost per unit.

the number of units to be processed.

length of processing time.

output rate.

4. Scheduling in service systems may involve scheduling which of the following?

The workforce

The equipment

A and B

Customers

All of the above

5. The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:
Job Processing Time (hrs) Due (hrs from now)

W 4 4

X 3 5

Y 2 2

Z 1 1

If he uses the earliest due date first (EDD) priority rule to schedule these jobs, what will be the average job tardiness?

0 hours

1.5 hours

1.75 hours

2 hours

2.25 hours

6. Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of

delayed differentiation.

kanban.

autonomation.

andon.

matrix management.

7. With regard to suppliers, JIT systems typically require

delivery of large lots at regular intervals.

buyer inspection of goods and materials.

multiple sources from which to purchase.

long-term relationships and commitments.

the lowest price possible.

8. Which of the following is characteristic of the JIT philosophy?

Inventories are an asset.

Lot sizes are optimized by formula.

Vendors are co-workers, essentially other departments of our organization.

Queues are a necessary investment.

All of the above

9. In make-to-stock systems, fluctuations in sales volume are managed through which of the following?

Order backlog

Finished goods inventory

WIP or FG inventory

All of the above

None of the above

10. In an MRP master schedule, the planning horizon is often separated into a series of times periods called pegging.

lead times.

stacked lead times.

time buckets.

firm, fixed, and frozen.

1.Does cellular manufacturing apply best to repetitive, high-volume product or nonrepetitive, low-volume product? Explain and give an example.

2. Validate or invalidate the statement that although inventories are maintained, the goal of lean operations is to maintain a minimum of safety stock.

3. Elaborate on the statement: "The output of the system cannot exceed the output of the bottleneck operation(s)."

4. Differentiate between infinite loading and finite loading as two major approaches used to load work centers.

5. Explain why batch process helps maximize worker efficiency.

6. Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):
Job Processing Time (days) Due Date (days from now)

A 2 2

B 5 6

C 6 10

D 3 4

E 4 8

What is the schedule sequence using the first-come, first-served (FCFS) priority rule?

7. Respond to the question: "Which is better, MRP or JIT?"

8. The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to a make-to-stock system and explain the rationale.

9. Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, and product volume per period, product mix changes, and delivery schedule changes.

10. Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice.

1. Explain how cellular manufacturing represents a flexible manufacturing system.

2. State the four building blocks of lean operations, and explain how fast and simple are the two common threads that run through them.

3. Elaborate on the statement: "The output of the system cannot exceed the output of the bottleneck operation(s).

4. Differentiate between infinite loading and finite loading as two major approaches used to load work centers.

5. The theory of constraints has a goal of maximizing flow through the entire system.

6. Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):
Job Processing Time (days) Due Date (days from now)

A 2 2

B 5 6

C 6 10

D 3 4

E 4 8

What is the average completion time for the first-come, first-served (FCFS) priority rule schedule? Average job tardiness? Average number of jobs at the center?

7. Respond to the question: "Which is better, MRP or JIT?

8. The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to an assemble-to-order system and explain the rationale.

9. Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, product volume per period, product mix changes, and delivery schedule changes.

10. Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice.

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M91296457
  • Price:- $60

Guranteed 36 Hours Delivery, In Price:- $60

Have any Question?


Related Questions in Operation Management

Place yourself for the moment in the following scenario you

Place yourself, for the moment, in the following scenario: You are a buyer, managing an outsourced software development project in which specifications and requirements may change drastically throughout the project life ...

1 how can companies continue to pursue global sourcing in

1. How can companies continue to pursue global sourcing in light of the additional costs that could be involved? 2. What is meant by the term “whistle blower?” Provide an example in recent history and discuss the ramific ...

Is free trade good consider by the end of 2008 economies

Is free trade good? Consider, by the end of 2008, economies around the world were in recession, with exceptions of China, India, and the major oil producers. Use your understanding of international economic integration a ...

1 how has cvs handled its ethical challenges2 evaluate cvss

1. How has CVS handled its ethical challenges? 2. Evaluate CVS's decision to no longer sell tobacco products. 3. What is the future of CVS in positioning itself as a healthcare compay based on its decision to be socially ...

Project evaluation communication implementation and

Project Evaluation, Communication, Implementation, and Closeout Perform a Research on a Real Project that could be one you have dealt with personally or read about and Answer the Following: -Please state a brief summary ...

A joe was walking in a park and found a watch he took it to

a) Joe was walking in a park and found a watch. He took it to the City's lost and found, but it was not claimed. Three years later, Joe went to this lost and found and asked for the watch and was told that it was a prope ...

1 what should be our attitude with regard to human rights

1. What should be our attitude with regard to "human rights" issues of potential foreign partners or suppliers? 2. How does organized labor affect International Management? 3. How would you overcome the challenges/impedi ...

Case study brazos valley food bank fostering partnerships

Case Study : Brazos Valley Food Bank: Fostering Partnerships, Feeding Hope This case study is meant to introduce students to a relatively simple supply chain, but one that encounters challenges common in all supply chain ...

Technology solutions in this section you will discuss how

Technology Solutions: In this section, you will discuss how each of the two technologies meets the technology requirements that you identified in section II. Use your decision matrix to guide your responses. A. Technolog ...

1 you have been asked to explain to employees that you

1. You have been asked to explain to employees that you supervise what a business plan is and why it is important to have a business plan that focuses on customer service. Write a transcript of what you would say to them ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As