1)  What factors should be considered when selecting the appropriate capacity cushion? How does the choice of capacity cushion relate to other decisions in operations management? To other functional areas?

There are many factors that we should considerate when selecting the appropriate capacity cushion such as type of business, level of fluctuation in demand, flexibility of production line, level of inventory (finish goods), reliability of supplier and cost of capital etc. All of the example factors can affect the decision of suitable size of capacity cushion as determined in table below.

 

Large capacity cushion

Small capacity cushion

Type of business

Service industry

Manufacturing

Level of fluctuation in demand

High

Low

Flexibility of production line

Inflexible

Flexible

Level of inventory (finish goods)

Low

High

Reliability of supplier

Unreliable

Reliable

Cost of capital

Low

High

As capacity cushion is the capacity that company reserve for unexpected situation, size of capacity cushion always relate to other decision in operation management. For example, if company has small capacity cushion and demand has continued increasing trend. Operation manager should begin to consider of increasing production capacity. Moreover, if company has small cushion and almost reach maximum capacity, operation team might need to communicate with marketing manager to slow down their team to prevent the situation that company can't deliver product to customer on time. Furthermore, operation manager might have another option that is communicate with finance team to prepare capital for increasing capacity.

2) What are five of the seven key principles of the Theory of Constraints and give an example of each?

1. Maximizing the output and efficiency of every resource may not maximize the throughout of the entire system. For example, no mater how much operation team can maximizing the output and efficiency of every resource but if there is bottleneck in production process, that bottleneck will slow down and decrease efficiency of entire process.

2. An hour lost at bottleneck or constrained resource is an hour lost for whole system. In contrast, an hour saved at a nonbottleneck resource is a mirage because it does not make the whole system more productive. For example, if company has three step of production process and bottleneck occur in step two, saving an hour in step one will not make company productive because production will be slow down at step two anyway. To be more productive company should find bottleneck and fix it.

3. Inventory is needed only in front of the bottleneck in order to prevent them from sitting idle, and in front of assembly and shipping points in order to protect customer schedules. Building inventories elsewhere should be avoided. For example, creating inventory behind bottleneck instead of put it through production process will generate unnecessary inventory costs.

4. Work, which can be material, information to be processed, documents, or customers, should be released into the system only as frequently as the bottlenecks need it. Bottleneck flows should be equal to the market demand. Pacing everything to the slowest resource minimizes inventory and operating expenses. For instance, if bottleneck process can handle 3 materials per hour and operation manager decide to put 5 materials into system per hour, fourth and fifth material will have to sit idle in front of bottleneck process and that create inventory cost and operating expense.

5. Activating a nonbottleneck resource (using it for improve efficiency that does not increase throughput) is not the same as utilizing a bottleneck resource (that does lead to increase throughput). Activation of nonbottleneck resource cannot increase throughput, nor promote better performance on financial measure. For example, if operation manager can activate labor to increase production rate from 10 to 20 pieces per hour in nonbottleneck area but in bottleneck process can handle only 7 pieces per hour, production rate per hour still remain at 7 pieces per hour.

3) List four of the six dominant factors in locating manufacturing facilities, as discussed in the book.

  • Favorable labor climate:A favorable labor climate may be the most important factor in location decisions for labor-intensive firms in industries such as textiles, furniture, and consumer electronics. Labor climate includes wage rates, training requirements, attitudes toward work, worker productivity, and union strength. Many executives consider weak unions or al low probability of union organizing efforts as a distinct advantage.
  • Quality of life: Good schools, recreational facilities, cultural events, and an attractive lifestyle contribute to quality of life. This factor is relatively unimportant on its own, but it can make the difference in location decisions.
  • Proximity to suppliers and resources: In many companies, plants supply parts to other facilities or rely on other facilities for management and staff support. These require frequent coordination and communication, which can become more difficult as distance increases.
  • Proximity to markets: After determining where the demand for goods and services is greatest, management must select a location for the facility that will supply that demand. Locating near markets is particularly important when the final goods are bulky or heavy and outbound transportation rates are high. For example, manufacturers of products such as plastic pipe and heavy metals all emphasize proximity to their markets.

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M91377234
  • Price:- $30

Guranteed 24 Hours Delivery, In Price:- $30

Have any Question?


Related Questions in Operation Management

1 which of the following issues as ellens estate planning

1. Which of the following issues, as Ellen's estate planning specialist, should you not be worried about? A. Ed leaving Ellen before they are married. B. Protecting Ellen's assets from Ed's creditors. C. Avoiding probate ...

1 what are the guiding principles and value proposition of

1. What are the Guiding Principles and Value Proposition of Proctor and Gamble Company. 2. Diversity in the workplace pros and cons. 3. The ongoing success of the system vendor is vital. There needs to continued support ...

1 name a time when you had to deliver a critical message to

1. Name a time when you had to Deliver a critical message to your team? In retail 2. What is meant by operational definition, when is it necessary, and why is it necessary? Provide examples to support your main points. 3 ...

Case study - crocs revolutionizing an industryrsquos supply

Case Study - Crocs: Revolutionizing an Industry’s Supply Chain Model for Competitive Advantage —Ronald Snyder, CEO of Crocs, Inc. Read the attached case study and answer the following questions: 1. What are Croc's core c ...

Choose two of the educational or work experience

Choose two of the educational or work experience opportunities you identified and commit to doing them. In your discussion explain: Why you chose these opportunities? What skills will they help you build, or what job req ...

You are the new it manager for the cougar corporation a

You are the new IT Manager for the Cougar Corporation, a firm of 500 employees, with 5 buildings located in three different states. Much of the information is critical to the operation of the business and contains key cu ...

Given the managerial problems of allocating resources and

Given the managerial problems of allocating resources and planning capacity for a variety of product groups and families, demonstrates an understanding of Master Production Scheduling (MPS) and Material Requirement Plann ...

Required text book c langley c john langley robert a

REQUIRED TEXT BOOK : C. Langley; C. John Langley; Robert A. Novack; Brian Gibson; John J. Coyle (2016) Supply Chain Management (12th Edition). Publisher: Cengage South-Western Chapter 9: Managing Inventory in the Supply ...

For this assignment you will compose two different messages

For this assignment you will compose two different messages - the first as a customer, and the second as a customer service representative. • Choose a recent purchase or customer experience you have had that did not meet ...

1 a food-truck can produce 20 meals per hour the demand

1. A food-truck can produce 20 meals per hour. The demand rate is, however, only 15 meals per hour. (a) What is the flow rate? (b) What is the utilization of the food-truck? (c) What is the cycle time? 2. Who is/are the ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As