Ask Operation Management Expert

1. A linear programming problem cost minimization problem has objective function: Minimize X +Y. It has two constraints 2X + 4Y ≥ 100 and 1X + 8Y ≤ 100, X≥ 0, Y≥0.

1.1. Use QM for Windows to plot the feasible region. Paste image of Linear Programming Results window and Solution List window here.

1.2. Paste image of Graph window here.

Explain if each of the following statements below is true or false. Please make sure you provide a reason.

1.3. There are four corner points including (50, 0) and (0, 12.5).

1.4. The two corner points are (0, 0) and (50, 12.5).

1.5. The feasible region is triangular in shape, bounded by (50, 0), (33-1/3, 8-1/3), and (100, 0).

1.6. The graphical origin (0, 0) is in the feasible region.2. A manager must decide on the mix of products to produce for the coming week. Each unit of Product A requires three minutes per unit for molding, two minutes per unit for painting, and one minute for packing. Each unit of Product B requires two minutes per unit for molding, four minutes for painting, and three minutes per unit for packing. There will be 600 minutes available for molding, 600 minutes for painting, and 420 minutes for packing. Both products have contributions of $1.50 per unit.

2.1. Formulate the problem as a LP and write the linear programming model here. (Include definitions of decision variables, objective function and constraints.)

2.2. Solve the problem using QM for Windows. Paste image of Linear Programming Results window and Solution List window here.

2.3. What combination of A and B will maximize contribution, and what is the maximum possible contribution?

2.4. Write the problem in standard form. (Include definitions of decision variables, objective function and constraints.)

2.5. Write the initial simplex table and label it Simplex Table 2A.1.

         Simplex Table

Basis CB

 

 

 

 

Zj

Cj - Zj

 

 

2.6. After creating Simplex Table 2A.1, find the entering variable using the Cj-Zj values and write it here.

2.7. What is the leaving variable? (Show MRR calculations.)

2.8. Write the elementary row operations for finding the new row __.

2.9. If row __ changes, write the elementary row operations for finding the new row __. If row __ does not change, explain why it does not change.

2.10. If row __ changes, write the elementary row operations for finding the new row __. If row __ does not change, explain why it does not change.

2.11. Write the new table and label it Simplex Table 2B.2.

       Simplex Table

Basis CB

 

 

 

 

Zj

Cj - Zj

 

 


2.12. What is the entering variable?

2.13. What is the leaving variable? (Show MRR calculations.)

2.14. Write the elementary row operations for finding the new row __.

2.15. If row __ changes, write the elementary row operations for finding the new row __. If row __ does not change, explain why it does not change.

2.16. If row __ changes, write the elementary row operations for finding the new row __. If row __ does not change, explain why it does not change.

2.17. Write the new table and label it Simplex Table 2C.3.

         Simplex Table

Basis CB

 

 

 

 

Zj

Cj - Zj

 

 

2.18. Is there an entering variable? If not, explain what this means.

3. A LP problem has three constraints: 2X + 10Y ≤ 100; 4X + 6Y ≤ 120; 6X + 3Y ≤ 90 and the non-negativity constraints. The objective is to Maximize X.

3.1. Write the problem in standard form. (Include definitions of decision variables, objective function and constraints.)

3.2. Solve the problem using QM for Windows. Paste image of Linear Programming Results window and Solution List window here.

3.3. Write the initial simplex table and label it Simplex Table 3A.1.

         Simplex Table

Basis CB

 

 

 

 

Zj

Cj - Zj

 

 

3.4. After creating Simplex Table 3A.1, find the entering variable using the Cj-Zj values and type it here.

3.5. What is the leaving variable? (Show MRR calculations.)

3.6. Write the elementary row operations for finding the new row __.

3.7. If row __ changes, write the elementary row operations for finding the new row __. If row __ does not change, explain why it does not change.

3.8. If row __ changes, write the elementary row operations for finding the new row __. If row __ does not change, explain why it does not change.

3.9. Write the new table and label it Simplex Table 3B.2.

         Simplex Table

Basis CB

 

 

 

 

Zj

Cj - Zj

 

 

3.10. Is there an entering variable for the next table? If so, what is the entering variable? If not, explain what this means.

3.11. What is the largest quantity of X that can be made without violating any of these constraints? Explain your answer.

4. Bryant's Pizza, Inc. is a producer of frozen pizza products. The company makes a net income of $1.00 for each regular pizza and $1.50 for each deluxe pizza produced. The firm currently has 150 pounds of dough mix and 50 pounds of topping mix. Each regular pizza uses 1 pound of dough mix and 4 ounces (16 ounces= 1 pound) of topping mix. Each deluxe pizza uses 1 pound of dough mix and 8 ounces of topping mix. Based on the past demand, Bryant wants to make at least 50 regular pizzas and at least 25 deluxe pizzas. The problem is to determine the number of regular and deluxe pizzas the company should make to maximize net income.

4.1. Formulate this problem as an LP problem and write the linear programming model here. (Include definitions of decision variables, objective function and constraints.)

4.2. Solve using QM for Windows. Paste image of Linear Programming Results window and Solution List window here.

4.3. Explain your solution in words.

4.4. How much dough mix and topping mix are leftover?

5. A gold processor has two sources of gold ore, source A and source B. In order to keep his plant running, at least three tons of ore must be processed each day. Ore from source A costs $20 per ton to process, and ore from source B costs $10 per ton to process. Costs must not exceed $80 per day. Moreover, Federal Regulations require that the amount of ore from source B cannot exceed twice the amount of ore from source A. Ore from source A yields 2 oz. of gold per ton, and ore from source B yields 3 oz. of gold per ton.

5.1. Formulate this problem as a LP and write the linear programming model here. (Include definitions of decision variables, objective function and constraints.)

5.2. Solve the problem in QM for Windows. Paste image of Linear Programming Results window and Solution List window here.

5.3. How many tons of ore from both sources must be processed each day to maximize the amount of gold extracted? Explain your answer.

5.4 What is the maximum amount of gold extracted? Explain your answer.

Operation Management, Management Studies

  • Category:- Operation Management
  • Reference No.:- M91261603
  • Price:- $55

Guranteed 36 Hours Delivery, In Price:- $55

Have any Question?


Related Questions in Operation Management

Conflictdefine functional versus dysfunctional conflict in

Conflict Define functional versus dysfunctional conflict in a work group and explain how you can increase functional conflict and decrease dysfunctional conflict. Develop a response that includes examples and evidence to ...

For this assignment you will need to find 2 articles in

For this assignment, you will need to find 2 articles in business that can help describe what are IT strategic initiative being undertaken by an organization are like. Choose a different organization for each of the arti ...

Coping with problems joe is a little nervous he has just

Coping With Problems Joe is a little nervous. He has just been transferred from another plant to take over a production line. Production is down and there is a serious problem with absenteeism. To make matters worse, the ...

Over 30 years ago michael porter identified a holistic

Over 30 years ago Michael Porter identified a holistic approach to understanding how competitive forces shape strategy. He posited that the only way to truly insulate an organization from underlying economic volatility i ...

You are the contracting officer for an air-to-ground

You are the contracting officer for an air-to-ground missile development program. A contract for pre-production models of the missile was awarded by your predecessor and the contractor is behind schedule. In a program me ...

The ikea case provides an excellent opportunity to apply

The IKEA case provides an excellent opportunity to apply strategic management concepts to a large privately-held company that is expanding into India. IKEA is a Netherlands-based Swedish company with a presence in 44 cou ...

Can you answer for me the following questions about social

Can you answer for me the following questions about social loafing and the three main causes of free-riding. 1. Give a description of the phenomenon of social loafing. 2. Give a description of the phenomenon of free-ridi ...

1 analyzing the bridgestonefirestone and ford motor company

1. Analyzing the Bridgestone/Firestone and Ford motor company, is it sufficient to use the ISO/QS 9000 standards as the main basis of vendor/product selection? 2. What position to these cars company ( 1. Volkswagen, 2. F ...

Research the effect of primary and secondary seat belt laws

Research the effect of primary and secondary seat belt laws on the occurrence of motor-vehicle injuries and fatalities. Explain how epidemiologic studies influenced the development of current seat belt laws. Describe how ...

Please provide a brief paragrap of the key takaways from

Please provide a brief paragrap of the key takaways from each of the following topics: Designing Clear Visuals in business reports Designing Successful Documents and Websites Writing Winning Proposals

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As