Ventron Engineering Company has just been awarded a $2 million development contract by the U.S. Army Aviation Systems Command to develop a blade spar for its Heavy Lift Helicopter program. The blade spar is a metal tube that runs the length of and provides strength to the helicopter blade. Due to the unusual length and size of the Heavy Lift Helicopter blade, Ventron is unable to produce a single-piece blade spar of the required dimensions using existing extrusion equipment and material. The engineering department has prepared two alternatives for developing the blade spar:

(1) sectioning or

(2) an improved extrusion process. Ventron must decide which process to use. (Backing out of the contract at any point is not an option.)

The risk report has been prepared by the engineering department. The information from this report is explained next. The sectioning option involves joining several shorter lengths of extruded metal into a blade spar of sufficient length. This work will require extensive testing and rework over a 12-month period at a total cost of $1.8 million. Although this process will definitely produce an adequate blade spar, it merely represents an extension of existing technology. To improve the extrusion process, on the other hand, it will be necessary to perform two steps:

(1) improve the material used, at a cost of $300,000, and

(2) modify the extrusion press, at a cost of $960,000.

The first step will require six months of work, and if this first step is successful, the second step will require another six months of work. If both steps are successful, the blade spar will be available at that time, that is, a year from now. The engineers estimate that the probabilities of succeeding in steps 1 and 2 are 0.9 and 0.75, respectively.

However, if either step is unsuccessful (which will be known only in six months for step 1 and in a year for step 2), Ventron will have no alternative but to switch to the sectioning process- and incur the sectioning cost on top of any costs already incurred. Development of the blade spar must be completed within 18 months to avoid holding up the rest of the contract. If necessary, the sectioning work can be done on an accelerated basis in a six-month period, but the cost of sectioning will then increase from $1.8 million to $2.4 million.

The director of engineering, Dr. Smith, wants to try developing the improved extrusion process. He reasons that this is not only cheaper (if successful) for the current project, but its expected side benefits for future projects could be sizable. Although these side benefits are difficult to gauge, Dr. Smith's best guess is an additional $2 million. (These side benefits are obtained only if both steps of the modified extrusion process are completed successfully.)

a. Develop a decision tree to maximize Ventron's EMV. This includes the revenue from this project, the side benefits (if applicable) from an improved extrusion process, and relevant costs. You don't need to worry about the time value of money; that is, no discounting or net present values are required. Summarize your findings in words in the spreadsheet.

b. What value of side benefits would make Ventron indifferent between the two alternatives?

c. How much would Ventron be willing to pay, right now, for perfect information about both steps of the improved extrusion process? (This information would tell Ventron, right now, the ultimate success or failure outcomes of both steps.)

Basic Finance, Finance

  • Category:- Basic Finance
  • Reference No.:- M91922723

Have any Question?


Related Questions in Basic Finance

Tom is pleased to know where the breakeven point is but his

Tom is pleased to know where the breakeven point is, but his business objective is not breaking even; he's in this deal to make money hopefully a lot of money. He has invested his personal savings, as well as other famil ...

In todays environment how could firms balance their

In today's environment, how could firms balance their marketing activities while meeting the demand of consumers from the main culture as well as from a subculture?

The copy department at microsoft wants to incorporate eva

The copy department at Microsoft wants to incorporate EVA in their business model. They want to explain how they can use EVA to price their copy services instead of giving free copies to departments. How would you help t ...

Question what are the risks associated with fixed income

Question: What are the risks associated with fixed income security. What are possible scenarios that may occur to illustrate the nature of these risks. Question: What are the alternatives a company may look into to prote ...

Abc company has projected sales of 1616 in january the

ABC Company has projected Sales of $1616 in January. The sales are expected to grow by 11% each month.ABC's collection schedule is as follows: ABC collects 28 percent of its sales in the month of sale and the remainder i ...

Summit record company is negotiating with two banks for a

Summit Record Company is negotiating with two banks for a $139,000 loan. Fidelity Bank requires a compensating balance of 14 percent, discounts the loan, and wants to be paid back in four quarterly payments. Southwest Ba ...

What is firm level strategy in business define and

What is firm level strategy in business? Define and explain

On january 11998 the total assets of the mccue company were

On January 1,1998, the total assets of the McCue company were $270 million. The first present capital structure, which follows, is considered optimal. Assume that they have no short-term debt. Long-term debt              ...

Burke tires just paid a dividend of d0 134 analysts expect

Burke Tires just paid a dividend of D0 = $1.34. Analysts expect the company's dividend to grow by 30% this year, by 19.25% in Year 2, and at a constant rate of 5% in Year 3 and thereafter. The required return on this low ...

Assume a 80000 investment and the following cash flows for

Assume a $80,000 investment and the following cash flows for two alternatives. Year Investment A Investment B 1 $ 20,000 $ 45,000 2 30,000 25,000 3 22,500 25,000 4 15,000 - 5 20,000 - a. Calculate the payback for investm ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As