Question: Rob Johnson is a product manager for Diamond Chemical. The firm is considering whether to launch a new product line that will require building a new facility. The technology required to produce the new product is yet untested. If Rob decides to build the new facility and the process is successful, Diamond Chemical will realize a profit of $675,000. If the process does not succeed, the company will lose $825,000. Rob estimates that there is a 0.6 probability that the process will succeed.

Rob can also decide to build a pilot plant for $60,000 to test the new process before deciding to build the full-scale facility. If the pilot plant succeeds, Rob feels the chance of the full-scale facility succeeding is 85%. If the pilot plant fails, Rob feels the chance of the full-scale facility succeeding is only 20%. The probability that the pilot plant will succeed is estimated at 0.6. Structure this problem with a decision tree and advise Rob what to do.

Statistics and Probability, Statistics

  • Category:- Statistics and Probability
  • Reference No.:- M92768359

Have any Question?


Related Questions in Statistics and Probability

Pete pablo has 20000 to invest he is very optimistic about

Pete Pablo has $20000 to invest. He is very optimistic about the prospects of two companies, 919 Brands and Diaries.com. However, Pete has a very pessimistic view of one company, a financial institution known as Star Ban ...

Stock valuationsuppose you know that a companys stock

Stock Valuation Suppose you know that a company's stock currently sells for $72 per share and the required return on the stock is 11.5 percent. You also know that the total return on the stock is evenly divided between a ...

A bank contains 2 quarters 5 dimes and 3 nickels you draw

A bank contains 2 Quarters, 5 dimes, and 3 Nickels. You draw two coins at random. Determine the probability distribution for the sum of the two coins drawn

Would you actually build a contingency chart for this

Would you actually build a contingency chart for this question or is this just probability basics? Bob sets two battery powered alarm clocks to make sure he wakes up in time for his 8 AM accounting test. Each alarm clock ...

To what extent does the client hold a responsibility for

To what extent does the client hold a responsibility for the success of their financial plan?

Determine the internal rate of return for a project that

Determine the internal rate of return for a project that costs -$149,500 and would yield after-tax cash flows of $23,000 the first year, $25,000 the second year, $28,000 the third year, $30,000 the fourth year, $34,000 t ...

A new type of soft drink from frackly inc is sold in 500

A new type of soft drink from Frackly Inc. is sold in 500 milliliter (ml) bottles. The mean volume of drink placed in a bottle is 490 ml with a standard deviation of 6.1 ml. Assuming a normal distribution of the data, wh ...

Assume in a particular year aprojecthas the following

Assume in a particular year aprojecthas the following financials: NOI o $700,000; Annual Bedt Service o $430,000 (of which $400k is intrest and 30k is priciple); original loan debt of 6.2M: 39 yr depreciable life: $8M no ...

Illustrate the difference between straight and cumulative

Illustrate the difference between straight and cumulative voting systems using as an example a shareholder who owns 5,000 shares and an election in which six directors will be selected. Why might shareholders care about ...

Acme airlines flies airplanes that seat 20 passengers from

Acme Airlines flies airplanes that seat 20 passengers. From experience, they have learned that, on average, 85% of the passengers holding reservations for a particular flight actually show up for the flight. If they book ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As