Ask Statistics and Probability Expert

Question 1: In a linear programming problem, all model parameters are assumed to be known with certainty.

  • True
  • False

Question 2: Graphical solutions to linear programming problems have an infinite number of possible objective function lines.

  • True
  • False

Question 3: In minimization LP problems the feasible region is always below the resource constraints.

  • True
  • False

Question 4: Surplus variables are only associated with minimization problems.

  • True
  • False

Question 5: If the objective function is parallel to a constraint, the constraint is infeasible.

  • True
  • False

Question 6: A linear programming model consists of only decision variables and constraints.

  • True
  • False

Question 7: A feasible solution violates at least one of the constraints.

  • True
  • False

Question 8: The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeledZ.  (graph did not copy/paste) Which of the following constraints has a surplus greater than 0?

  • BF
  • CG
  • DH
  • AJ

Question 9: Cully furniture buys 2 products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75000 to invest in shelves this week, and the warehouse has 18000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the maximum profit?

  • $25000
  • $35000
  • $45000
  • $55000
  • $65000

Question 10: The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeledZ. graph did not copy/paste The equation for constraint DH is:

  • 4X + 8Y ≥ 32
  • 8X + 4Y ≥ 32
  • X + 2Y ≥ 8
  • 2X + Y ≥ 8

Question 11: The production manager for the Coory soft drink company is considering the production of 2 kinds of soft drinks: regular and diet. Two of her limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of her ingredients) limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. For the production combination of 135 cases of regular and 0 cases of diet soft drink, which resources will not be completely used?

  • only time
  • only syrup
  • time and syrup
  • neither time nor syrup

Question 12: In a linear programming problem, the binding constraints for the optimal solution are:

5x1 + 3x2 ≤ 30
2x1 + 5x2 ≤ 20

Which of these objective functions will lead to the same optimal solution?

  • 2x1 + 1x2
  • 7x1 + 8x2
  • 80x1 + 60x2
  • 25x1 + 15x2

Question 13: In a linear programming problem, a valid objective function can be represented as

  • Max Z = 5xy
  • Max Z 5x2 + 2y2
  • Max 3x + 3y + 1/3z
  • Min (x1 + x2) / x3

Question 14: Cully furniture buys 2 products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75000 to invest in shelves this week, and the warehouse has 18000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the objective function?

  • MAX Z = $300B + $100 M
  • MAX Z = $300M + $150 B
  • MAX Z = $300B + $150 M
  • MAX Z = $300B + $500 M

Question 15: A graphical representation of a linear program is shown below. The shaded area represents the feasible region, and the dashed line in the middle is the slope of the objective function.  graph did not copy/paste If this is a maximization, which extreme point is the optimal solution?

  • Point B
  • Point C
  • Point D
  • Point E

Question 16: The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeled.  This linear programming problem is a:

  • maximization problem
  • minimization problem
  • irregular problem
  • cannot tell from the information given

Question 17: The production manager for the Coory soft drink company is considering the production of 2 kinds of soft drinks: regular (R) and diet(D). Two of the limited resources are production time (8 hours = 480 minutes per day) and syrup limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. What is the time constraint?

  • 2R + 5D ≤ 480
  • 2D + 4R ≤ 480
  • 2R + 3D ≤ 480
  • 2R + 4D ≤ 480

Question 18: Solve the following graphically

Max z = 3x1 +4x2
s.t. x1 + 2x2 ≤ 16
2x1 + 3x2 ≤ 18
x1 ≥ 2
x2 ≤ 10
x1, x2 ≥ 0

Find the optimal solution. What is the value of the objective function at the optimal solution?

Question 19:

Max Z = $3x + $9y
Subject to: 20x + 32y ≤ 1600
4x + 2y ≤ 240
y ≤ 40
x, y ≥ 0

At the optimal solution, what is the amount of slack associated with the second constraint?

Question 20: Consider the following linear programming problem:

Max Z = $15x + $20y
Subject to: 8x + 5y ≤ 40
0.4x + y ≥ 4
x, y ≥ 0

At the optimal solution, what is the amount of slack associated with the first constraint?

Statistics and Probability, Statistics

  • Category:- Statistics and Probability
  • Reference No.:- M91601891
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Statistics and Probability

Introduction to epidemiology assignment -assignment should

Introduction to Epidemiology Assignment - Assignment should be typed, with adequate space left between questions. Read the following paper, and answer the questions below: Sundquist K., Qvist J. Johansson SE., Sundquist ...

Question 1 many high school students take the ap tests in

Question 1. Many high school students take the AP tests in different subject areas. In 2007, of the 144,796 students who took the biology exam 84,199 of them were female. In that same year,of the 211,693 students who too ...

Basic statisticsactivity 1define the following terms1

BASIC STATISTICS Activity 1 Define the following terms: 1. Statistics 2. Descriptive Statistics 3. Inferential Statistics 4. Population 5. Sample 6. Quantitative Data 7. Discrete Variable 8. Continuous Variable 9. Qualit ...

Question 1below you are given the examination scores of 20

Question 1 Below you are given the examination scores of 20 students (data set also provided in accompanying MS Excel file). 52 99 92 86 84 63 72 76 95 88 92 58 65 79 80 90 75 74 56 99 a. Construct a frequency distributi ...

Question 1 assume you have noted the following prices for

Question: 1. Assume you have noted the following prices for paperback books and the number of pages that each book contains. Develop a least-squares estimated regression line. i. Compute the coefficient of determination ...

Question 1 a sample of 81 account balances of a credit

Question 1: A sample of 81 account balances of a credit company showed an average balance of $1,200 with a standard deviation of $126. 1. Formulate the hypotheses that can be used to determine whether the mean of all acc ...

5 of females smoke cigarettes what is the probability that

5% of females smoke cigarettes. What is the probability that the proportion of smokers in a sample of 865 females would be greater than 3%

Armstrong faber produces a standard number-two pencil

Armstrong Faber produces a standard number-two pencil called Ultra-Lite. The demand for Ultra-Lite has been fairly stable over the past ten years. On average, Armstrong Faber has sold 457,000 pencils each year. Furthermo ...

Sppose a and b are collectively exhaustive in addition pa

Suppose A and B are collectively exhaustive. In addition, P(A) = 0.2 and P(B) = 0.8. Suppose C and D are both mutually exclusive and collectively exhaustive. Further, P(C|A) = 0.7 and P(D|B) = 0.5. What are P(C) and P(D) ...

The time to complete 1 construction project for company a

The time to complete 1 construction project for company A is exponentially distributed with a mean of 1 year. Therefore: (a) What is the probability that a project will be finished in one and half years? (b) What is the ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year