Place the steps below in the correct order for the construction of a control chart.
I. Compute control limits.
II. Measure the quality characteristic of interest.
III. Record the data.
IV. Gather samples of data of uniform size.
V. Chart the control limits.
a. I, IV, III, II, V
b. I, IV, II, III, V
c. IV, III, II, I, V
d. IV, II, III, I V