Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Statistics and Probability Expert

For the system of Problem P10.30, use a phase-lag compensator and attempt to achieve a phase margin of approximately 50°. Determine the actual overshoot and peak time for the compensated system.

Problem P10.30

An automated guided vehicle (AGV) can be considered as an automated mobile conveyor designed to transport materials. Most AGVs require some type of guide path. The steering stability of the guidance control system has not been fully solved. The slight "snaking" of the AGV about the track generally has been acceptable, although it indicates instability of the steering guidance control system [9].

Most AGVs have a specification of maximum speed of about 1 m/s, although in practice they are usually operated at half that speed. In a fully automated manufacturing environment, there should be few personnel in the production area; therefore, the AGV should be able to be run at full speed. As the speed of the AGV increases, so does the difficulty in designing stable and smooth tracking controls.

A steering system for an AGV is shown in Figure P10.30, where τ1 = 40 ms and τ2 = 1 ms. We require that the velocity constant Kv be 100 so that the steady state error for a ramp input will be 1 % of the slope of the ramp. Neglect τ2 and design a lead compensator so that the phase margin is

Attempt to obtain the two limiting cases for phase margin, and compare your results for the two designs by determining the actual percent overshoot and settling time for a step input.

Statistics and Probability, Statistics

  • Category:- Statistics and Probability
  • Reference No.:- M91883767

Have any Question?


Related Questions in Statistics and Probability

Future value of an annuitywhat is the future value of a 470

Future Value of an Annuity What is the future value of a $470 annuity payment over 7 years if the interest rates are 6 percent?

What is correct alternative hypothesis for the claim that

What is correct alternative hypothesis for the claim that the average professional basketball player is at least 6' 9" tall. And Answer "True" if the statement is always true. If the statement is not always true, replace ...

Do you have a credit card or use some other form of

Do you have a credit card or use some other form of consumer credit? Identify what you currently use, if any. If you do not use credit, discuss a type of credit that you might consider in the future. What advantages does ...

The table shows the results of a survey in which 400 adults

The table shows the results of a survey in which 400 adults from the? East, 400 adults from the? South, 400 adults from the? Midwest, and 400 adults from the West were asked if traffic congestion is a serious problem. Co ...

If we believe the percent to be 75 how many police officers

If we believe the percent to be 75%, how many police officers must we survey to estimate the proportion of officers who graduated from a police academy if we want to ensure we can be 90% we are within 2% of the true prop ...

Can someone explain this to me or draw it out so that i can

Can someone explain this to me? Or draw it out so that I can understand. You may see a problem like the following: a mean score of 20 and SD of 3, and asked what percentage of cases will be between 17 and 23, you would r ...

The new fore and aft marina is to be located on the ohio

The new Fore and Aft Marina is to be located on the Ohio River near Madison, Indiana. Assume that Fore and Aft decides to build a docking facility where one boat at a time can stop for gas and servicing. Assume that arri ...

Based on the 1990 census the number of hours per day adults

Based on the 1990 census, the number of hours per day adults spend watching television is approximately normally distributed with a mean of 5 hours and a standard deviation of 1.3 hours. What proportion of the population ...

The board of a major credit card company requires that the

The board of a major credit card company requires that the mean wait time for customers when they call customer service is at most 3.00 minutes. To make sure that the mean wait is not exceeding the requirement, an assist ...

A what is the purpose of credit analysis discuss the

(a) What is the purpose of credit analysis? Discuss the importance of performing a credit analysis if you are suppliers of credit (i.e., commercial banks, non-bank private financing entities).

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As