As the site engineer at a large construction site, you have been asked to oversee the concrete production process. You are particularly worried about the slump of the concrete. If the slump is too small, it suggests the concrete is too stiff. If there is too much slump, then the concrete is too watery. The contract specifications state that the slump for the particular concrete used should be 1 inch, with a 90% level of confidence. Therefore, during the concrete production process, you instruct the laboratory technician to take 20 random samples of fresh concrete and measure the slump using the appropriate test equipment. The technician obtained the following test results (in inches):

0.92

1.21

1.03

1.10

1.01

0.99

0.89

0.97

1.01

0.99

1.05

1.11

0.95

1.00

1.00

1.04

0.88

1.02

0.97

1.01

Would you accept that day's production of concrete at the given level of confidence? Assume that, from past slump test results, the concrete slumps are known to be normally distributed.

Statistics and Probability, Statistics

  • Category:- Statistics and Probability
  • Reference No.:- M91730273

Have any Question?


Related Questions in Statistics and Probability

A survey found that people keep their televisions an

A survey found that people keep their televisions an average of 5.8 years. The standard deviation is 0.76 year. If a person decides to buy a new TV, find the probability that he or she owned the old one for the given amo ...

A researcher conducts a hypothesis test using a sample from

A researcher conducts a hypothesis test using a sample from an unknown population. If the t statistic has df = 35, how many individuals were in the sample?

A researcher wants to determine if lead levels are

A researcher wants to determine if lead levels are different between the top of a glass of water and the bottom of a glass of water. Many samples of water are taken. From half, the lead level at the top is measured and f ...

Problem arrival of vehicles at new jersey turnpike toll

Problem: Arrival of vehicles at New Jersey Turnpike toll booth on Saturdays at dawn is modeled as a Poisson Arrival process with a rate of 1.21 vehicles per minute. Let X be a random variable that records the number of a ...

You are in charge of numbering the homes in a new

You are in charge of numbering the homes in a new subdivision. If we were to ue 0 through 9 as our number to use and we want to have 3 digit house numbers, how many unique homes numbers would we potentially be able to pr ...

Timco is considering project a project a will cost 23000 it

Timco is considering project A. Project A will cost 23000. It should provide after tax cash inflows of 5000 per year for the next 6 years. The cost of funds is 10%. Find the MIRR. Should Timco buy it?

1 the r-squared of a linear regression model is equal to

1) The R-squared of a linear regression model is equal to the proportion of the variance of the target explained by a linear regression model. 2). The R-squared of a linear regression model is equal to the proportion of ...

Hardboard is graded with the following frequenciesgrade a

Hardboard is graded with the following frequencies: Grade A: 1/5 Grade B: 3/4 Cull: 1/20 If six pieces come off of a hot press, find the probability that two are Grade A, three are Grade B, and one is a Cull.

Assume in a particular year aprojecthas the following

Assume in a particular year aprojecthas the following financials: NOI o $700,000; Annual Bedt Service o $430,000 (of which $400k is intrest and 30k is priciple); original loan debt of 6.2M: 39 yr depreciable life: $8M no ...

1 prince georges county publicnbspschools wants to access

1) Prince George's County Public Schools wants to access the effectiveness of its new 1st grade reading program. Ten 1st grade classrooms are randomly selected from across the county. What kind of sampling method is bein ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As