1. Allen Machines specializes in developing weed-harvesting equipment that is used to clear small lakes of weeds.  Allen Machines is contemplating the construction of a machine that would harvest weeds on narrow rivers and waterways.  The activities and time in weeks necessary to build one of these experimental machines are shown in the table below.

Activity

Immediate Predecessors

Time in Weeks

A

none

4

B

A

3

C

B

2

D

A

4

E

A

2

F

E

2

G

B, C

2

H

D,F

1

1. What is the minimum possible time required for completing the project?

2. What is the latest possible time that Activity E may be started without delaying the completion of the project?

3. What is the latest finish time for Activity H?

4. What is/are the critical path(s)?

Q2. The following is the activity and associated costs for the renovation of the local high school football stadium. The times are in weeks.

Activity

Immediate Predecessor

Time

Cost ($)

A

-

8

20,000

B

-

4

12,000

C

A

6

15,000

D

B

2

15,000

E

B

3

10,000

F

C, D

7

50,000

G

C, D

5

35,000

H

E, F

1

1,000

1. What is the critical path and total time required for this project?

2. How much of the total (cumulative) budget would be spent in Week 8 (Period 8) with the earliest start budget?

Q3. Precision Manufacturing has a government contract to produce stainless steel rods for use in military aircrafts.  Each rod is required to be 35 millimeters in diameter. Each hour, random samples of size n = 5 rods are measured to check process control. Four hours of observations yielded the following:

Explanation: You are looking at the control limits for the variable, average diameter. You can use Excel QM or QM for Windows->Quality Control->x-bar and r-charts.

 

Diameter

Time

Rod 1

Rod 2

Rod 3

Rod 4

Rod 5

9 A.M.

34.5

34.9

37.9

36

35.9

10 A.M.

35.1

34.7

33

35.4

34.9

11 A.M.

38.9

35

37.9

38.3

36.5

Noon

25

35.2

32.1

38.1

35

1. Construct the xbar-chart and the R-chart.

2. Is the process in control?

Q4. Modern Electronics specializes in manufacturing modern electronic components.  It also builds the equipment that produces the components.  Modern Electronics is considering building a new facility but the estimated profits would be impacted by the type of market that develops.  The probability for a strong market is 0.3; for a fair market is 0.3; and for a poor market is 0.4. You are responsible for advising the president of Modern Electronics on the type facility that should be built or to not build a facility at all.  The table shows the estimated profits under each market and for each size facility.

Explanation: You can use QM for Windows->Decision Analysis->Decision Table with the above information.


Estimated Profits


Strong Market

Fair Market

Poor Market

Build a large facility

30,000

25,000

-20,000

Build a medium-size facility

27,500

25,000

-10,000

Build a small facility

15,000

12,500

-1000

Do not build a facility

0

0

0

1. What is your recommendation to the president based on expected value that maximizes profits (EMV).

2. Provide a second recommendation to the president that minimizes regret.

Q5. Consulting income at Kaplan Associates for the period February - July is shown in the table below. Assume that the initial forecast for February is $90,000.Use Exponential smoothing to forecast August's income.

Explanation: You can use Excel QM-Forecasting-Exponential with the above information.

Month

Income ($1,000)

February

90.0

March

88.5

April

74.8

May

91.7

June

91.3

July

92.8

1. Use a smoothing constant of α = 0.1.

2. Use a smoothing constant of α = 0.6.

3. Analysis of the forecasting errors indicates which forecasting constant is best in this situation?

Q6. Johnson Construction Company is in the process of installing power lines to a large housing development. The company wants to minimize the total length of wire used, which would minimize the company's cost. The housing development is shown below.  Each house has been numbered, and the distances between houses are given in hundreds of feet.

Explanation: We want to create the minimum spanning tree (MST) for this network since all houses need to be connected.  You can use QM for Windows to do this.

934_Figure.png

1. What do you recommend to Johnson Construction Company?

Q7. The storm drains in the Cedar Rapids, Iowa, have been upgraded following the devastating floods of 2008. The network of storm drains and the capacities are shown below. Determine the maximum flow (in hundreds of gallons of water per minute) from node 1 to node 5. Remember that the arc has both capacity and reverse capacity.

Explanation: You can use QM for Windows-Networks-Maximal Flow with the above information.

From Node

To Node

Fluid Flow

1

2

125

2

1

100

1

3

250

3

1

100

1

4

250

4

1

450

1

5

200

5

1

75

2

4

100

4

2

300

3

4

150

4

3

250

3

5

190

5

3

400

4

5

50

5

4

100

Q8. From the States Data Setthe following output for Collegeand for the Bachelors was created.

734_Figure1.png

1. Which variable has the greatest relative variation?

Q9. You are a consultant working for Kaplan Consulting. The U.S. Department of Laborhas requested assistance in evaluating the impact of economic stimulus on the unemployment rate. From theStates Data Setthe following t test was conducted to answer the question:

"Has there been a significant reduction in the national unemployment rate between January and March?"

1459_Figure2.png

1. What is the Null and the Alternative Hypotheses?

2. What is your level of alpha (α)?

3. What is your decision about the hypothesis based on the software output?

4. Has there been a significant reduction in the national unemployment rate between January and February?

Q10. The Governor of a southern state has asked Kaplan Consulting to determine if the state were able to increase the percentage of its population with a Bachelor's Degree to 45%, what might be the expected median household income based on 2000 data? Here is the output from the Regression procedure from Excel.

SUMMARY OUTPUT

Regression Statistics

Multiple R

0.718033536

R Square

0.515572158

Adjusted R Square

0.505479912

Standard Error

4548.142979

Observation

50

 

 

Coefficients

Standard Error

t Start

p-value

Intercept

15606.01508

3717.168291

4.198361188

0.000115689

Bachelors

976.2529817

136.5876943

7.147444626

4.37107E-09

1. What would be the predicted median household income if the percentage of the population in the state were 45% or 45?

Applied Statistics, Statistics

  • Category:- Applied Statistics
  • Reference No.:- M91920124

Have any Question?


Related Questions in Applied Statistics

Question onea a factory manager claims that workers at

QUESTION ONE (a) A factory manager claims that workers at plant A are faster than those at plant B. To test the claim, a random sample of times (in minutes) taken to complete a given task was taken from each of the plant ...

You are expected to work in groups and write a research

You are expected to work in groups and write a research report. When you work on your report, you need to use the dataset, and other sources such as journal articles. If you use website material, please pay attention to ...

Assignment -for each of the prompts below report the

Assignment - For each of the prompts below, report the appropriate degrees of freedom, t statistic, p-value and plot using the statistical software platform of your choice (R/STATA) 1) A sample of 12 men and 14 women hav ...

Assignment - research topicpurpose the purpose of this task

Assignment - Research topic Purpose: The purpose of this task is to ensure you are progressing satisfactorily with your research project, and that you have clean, useable data to analyse for your final project report. Ta ...

Assessment task -you become interested in the non-skeletal

Assessment Task - You become interested in the non-skeletal effects of vitamin D and review the literature. On the basis of your reading you find that there is some evidence to suggest that vitamin D deficiency is linked ...

Part a -question 1 - an analyst considers to test the order

PART A - Question 1 - An analyst considers to test the order of integration of some time series data. She decides to use the DF test. She estimates a regression of the form Δy t = μ + ψy t-1 + u t and obtains the estimat ...

Medical and applied physiology experimental report

Medical and Applied Physiology Experimental Report Assignment - Title - Compare the working and spatial memory by EEG. 30 students were tested (2 memory games were played to test their memory - a card game and a number g ...

Business data analysis computer assignment -part 1

Business Data Analysis Computer Assignment - PART 1 - Economists believe that high rates of unemployment are linked to decreased life satisfaction ratings. To investigate this relationship, a researcher plans to survey a ...

Question - go to the website national quality forum nqf

Question - Go to the website, National Quality Forum (NQF), located in the Webliography, and download the article by WIRED FOR QUALITY: The Intersection of Health IT and Healthcare Quality, Number 8, MARCH 2008. You are ...

Go to the webliography source for the national cancer

Go to the Webliography source for the National Cancer Institute's Surveillance, Epidemiology, and End Results (SEER) Program. In the Fast Stats, create your own cancer statistical report, "Stratified by Data Type," and u ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As